Preliminary Construction Cost Prediction Model Based on Module for Modernized Hanok (초기 기획단계의 신한옥 공사비 예측 모델 - 모듈(칸) 기반의 목공사 개략 물량 산출 중심으로 -)

  • Kang, Seunghee;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.48-56
    • /
    • 2020
  • Prediction of construction cost in the planning stage that provides basic information for feasibility study, budgeting, and planning is an important factor for successful project execution. In this study, a prediction model was developed for the purpose of improving the accuracy of estimating the construction cost of Hanok in the planning stage. The cost of this model is estimated by two methods. First, the cost of wood work, which accounts for the largest portion of the total construction cost, is estimated by calculating the approximate quantity under various conditions (structure type, roof type, plane type, etc.). Second, the cost of the rest work sections except the wood work is estimated by using the unit cost model. The predictive model was verified by two case projects, and the error rate of total construction cost was -4%(case 1) and -6%(case 2). These results showed an error rate in the range that can be applied to practice in the planning stage.

Derivation of Work to be Automated in Reinforced Concrete Construction (철근 콘크리트 공사의 자동화 대상작업 도출)

  • Jeon, Eun-Bi;Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.293-294
    • /
    • 2021
  • For the successful introduction of the construction automation system, it is necessary to define the consideration factors and target tasks for the necessity of automating the conventional methods. In this study, the factors for automation were derived through brainstorming and questionnaires, and calculated the relative importance through the pairwise comparison using the AHP analysis method. In addition, the detailed type of concrete work was classified into 32 detailed works, and the automation score for each work was calculated by investigating the factors considering the necessity of automation. As a result of the automation score analysis, it was concluded that the need for automation of concrete placing work was the highest. Based on this study, we will consider the strategy of a concrete construction automation system.

  • PDF

A Study on The Risk Level of Work Types in Urban Railway Construction (도시철도 건설공사의 공종별 위험도에 관한 연구)

  • Lee, Jong-Bin;Han, In-Kuk;Chang, Seong Rok
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.2
    • /
    • pp.98-103
    • /
    • 2016
  • The goals of this study were to investigate some significant factors to judge level of safety at urban railway construction field and to analyze degree of risk by work classification. Currently, there are lots of construction fields for the urban railway for national transportation, and our government also planned constructing more urban railway in near future. However, most of the researches on safety neglected the degree of risk factors on the urban railway construction field. Safety managers participated in the brainstorming session for deriving decision criteria of the degree of risk (i.e., significant factors). Then, they were asked to answer a structured questionnaire which was developed for deriving most important factors. Finally, the analytic hierarchy process (AHP) was used to analyze level of risk by work classification. The following results were obtained. First, total twelve factors judging degree of risk were found in the brainstorming session. Second, the questionnaire showed four significant factors, including adjacency of obstacle, intensity of work, unsafe condition and work space. Third, the results of AHP showed civil work is the most dangerous work among 6 work types. The results could be used to give the safety management priority on accident prevention efforts among several hazards and to reduce degree of risk in construction field of the urban railway.

A Study on the Estimation of Proper Construction Cost for Road Pavement Maintenance Work (아스팔트포장 유지보수 적정공사비 산정방안 연구)

  • Oh, JaeHun;Song, TaeSeok;An, BangYul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.16-26
    • /
    • 2020
  • Road Pavement Maintenance Work is generated in a variety of different field conditions, and it is difficult to calculate the construction cost because there are no detailed criteria when preparing the estimated construction cost. Unlike new pavements, Road Pavement Maintenance has to be constructed with operating vehicles, and there are many differences in productivity depending on urban areas, limited work hours, night-time, construction area, etc. To compensate for this, the standard for calculation of construction cost provides additional charges for the number of lanes, residential areas, working hours, and night work, but it applied differently depending on construction officials. In this study, construction cost estimation standards that can properly reflect the conditions of the site was investigated for major types of Road Pavement Maintenance work. The site was investigated and analyzed mainly for many construction sites with 'overlay of asphalt after cutting', 'restore surface', 'repair of pavement', and 'recovery of roadway'. The criteria for the application of construction volume separately according to working hours, public places, and land area including extra charges for basic downtown and residential area. The hours of operation were divided into three types(7 hours, 5 hours, 3 hours) excluding movement and preparation time, and each type provided a coefficient for dividing the area of the construction site into five types. The construction cost calculation method based on the construction purpose is site conditions is proposed accordingly, and it is deemed that a plan for the designer to calculate the construction cost has been prepared in consideration of the site conditions.

Basic study for development of bottom-up infill module for high rise building (고층 건축물을 위한 bottom-up Infill module 개발 기초 연구)

  • Sung, Soojin;Lim, Chaeyeon;Na, Youngju;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.164-165
    • /
    • 2015
  • Modular construction technique is an adaptation of factory-based mass production concept in ordinary manufacturing industries to construction industry and it assumes that panels, units, etc. are fabricated in factories and assembled in construction sites. Given its structural limitations, modular construction technique is primarily used in low-story buildings whose maximum height is usually five stories, but researchers are actively studying possible adaptation of modular construction technique to high-rise building designs these days as in the case of infill-type modular construction design. Infill-type modular construction technique, most frequently used in high-rise building construction projects, completes frame construction first in reinforced concrete structures and fills unit modules in such structures. However, infill-type modular construction technique leads to longer construction schedule accompanying increase in construction cost, cost overrun due to additional of temporary work, and possible damage to units in the wake of facility construction. Accordingly, this study is performed as a basic study for the development of bottom-up infill-type modular construction technique intended to construct structural frames and fill in units sequentially in a bid to address such drawbacks of current infill-type modular construction technique.

  • PDF

A Study on the Noise Characteristics about Equipment Operating under Construction (건설공사 시 장비운영에 따른 소음특성 기초연구)

  • Kim, Nagyoung;Kang, Heeman;Kim, Hongjong;Shin, Yongsuk;Kim, Changyong
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.12
    • /
    • pp.43-49
    • /
    • 2012
  • Noise measurements were performed by distance for major construction equipment. especially, For construction equipment that large width of variations is depending on the type of work, noise measurements were performed by the detail type of work. For a time of quiescent and construction, "A" compensation equivalent noise level (Leq) were measured. Most of the construction equipment and the characteristics of the point source appears to be similar in analyzed noise measurement results.

The Assessment of the Risk Index in the Bridge Construction by the AHP Method (AHP기법을 이용한 교량공사 위험지수 평가)

  • Lee, Myeong-Gu;Jeong, Myeong-Jin;Kim, Kyu-Dong;Choi, Soon-Ju;Park, Seung-Kook
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.6
    • /
    • pp.119-123
    • /
    • 2009
  • The purpose of this study is to verify the assessment of the risk index by the AHP method effective in the bridge construction. We compared that by the AHP method with the risk index by the accident analysis in the bridge construction. This method results in the useful tool deciding the assessment of the risk index according to work type in the bridge construction.

Assessment of Accident Level Based on Contract Amount by Type of Construction (공사유형별 건설수주액을 고려한 건설재해수준 평가기법)

  • Yi, Kyoo-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.2
    • /
    • pp.157-163
    • /
    • 2021
  • The accident rate is obtained by dividing the number of accidents by the number of regular workers. In the case off construction work, however, the accident rates are not accurately figured out, because they use the approximate number of regular workers, which is estimated based on the amount of construction work and the labor ratio. In addition, the current accident rate estimation method does not reflect the characteristics of construction types, such as building, civil, plant, etc. This study is conducted with the aim of presenting a supplementary method of accident rate assessment that incorporates the characteristics of type of construction. For the purpose of this, correlation and regression analysis are executed to verify the relationships between number of accidents and the amount of construction contract, and several equations are derived which shows the relationship between the number of accidents by accident types and amount of constract by construction types. The result shows that the non-residential work amount and the number of accidents showed a proportional relationship, while the civil work amount and the number of accidents showed an inversely proportional relationship. The results of this research are expected to calibrate the construction accident rates and to be used as an auxiliary indicator to determine the trend of annual accident rates by comparing the values with usual years.

A Study on the Risk Level of Work Types in Nuclear Power Plant Construction (원자력발전소 건설공사의 공종별 위험도에 관한 연구)

  • Lee, Jong-Bin;Lee, Jun Kyung;Chang, Seong Rok
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.3
    • /
    • pp.95-99
    • /
    • 2013
  • The goal of this study was to investigate some significant factors to influence level of safety at plant construction field and analyze degree of risk by work classification. Currently, there are lots of construction fields for the nuclear power plant for electricity generation, and our government also planned constructing more nuclear power plant in near future. However, much of the safety literature neglected the degree of risk factors on the plant construction field. Safety managers participated in the brainstorming session for drawing decision criteria of the degree of risk (i.e., significant factors). Then, they were asked to answer a structured questionnaire which was developed for drawing most important factors. Finally, the analytic hierarchy process (AHP) was used to analyze level of risk by work classification. The following results were obtained. First, total twelve factors judging degree of risk were found in the brainstorming session. Second, the questionnaire showed four significant factors, including number of workers, working environments, skill of craft and accident experience. Third, the results of AHP showed Architecture work is the most dangerous work among 6 work types. The results could be used to reduce degree of risk in construction field of the nuclear power plant.

Suggestion of Safety Management Activities and Key Check point for Safety Management in Modular Construction Sites (모듈러 건설현장의 단위작업별 안전관리 활동 및 중점 체크사항 제안)

  • Jun, Young-Hun;Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.202-203
    • /
    • 2022
  • In this study, focusing on work types of lifting modules and modules assembly in modular construction sites, unit works were defined according to the construction process of each work type, and safety management elements, safety management activities, and key check point were proposed. The results of this study may have somewhat overlapping contents in the construction procedure in order to derive specific safety management activities and check point for each unit work. Therefore, there is a limit to use the results in an actual modular construction site. In future research, we plan to improve this part and derive a checklist that considers field usability.

  • PDF