A Study on The Risk Level of Work Types in Urban Railway Construction

도시철도 건설공사의 공종별 위험도에 관한 연구

  • Lee, Jong-Bin (Department of Safety Engineering, Pukyong National University) ;
  • Han, In-Kuk (Hyundai Engineering & Construction) ;
  • Chang, Seong Rok (Department of Safety Engineering, Pukyong National University)
  • Received : 2015.09.30
  • Accepted : 2016.01.12
  • Published : 2016.04.30

Abstract

The goals of this study were to investigate some significant factors to judge level of safety at urban railway construction field and to analyze degree of risk by work classification. Currently, there are lots of construction fields for the urban railway for national transportation, and our government also planned constructing more urban railway in near future. However, most of the researches on safety neglected the degree of risk factors on the urban railway construction field. Safety managers participated in the brainstorming session for deriving decision criteria of the degree of risk (i.e., significant factors). Then, they were asked to answer a structured questionnaire which was developed for deriving most important factors. Finally, the analytic hierarchy process (AHP) was used to analyze level of risk by work classification. The following results were obtained. First, total twelve factors judging degree of risk were found in the brainstorming session. Second, the questionnaire showed four significant factors, including adjacency of obstacle, intensity of work, unsafe condition and work space. Third, the results of AHP showed civil work is the most dangerous work among 6 work types. The results could be used to give the safety management priority on accident prevention efforts among several hazards and to reduce degree of risk in construction field of the urban railway.

Keywords

References

  1. Busan Transportation Corporation, "Construction Plan of Safety & Environment Construction", 2014.
  2. Y. M. Kim, W. H. You and Y. G. Park, "A Abnormality Vibration Reduction Study through Wheelprofile Changes for Urban Rolling Stock", KSAE 2013 Annual Conference and Exhibition, pp. 106-107, 2013.
  3. S. Y. Chung and W. Y. Lee, "A Study on the Estimation Function of the Operating Cost for an Urban Railway(with a focus on Medium-sized Rapid Transit)", Journal of THE KOREAN SOCIETY FOR RAILWAY, Vol. 16, No. 4, pp. 318-330, 2014. https://doi.org/10.7782/JKSR.2013.16.4.318
  4. D. -B. Lee, "A Study on Efficient Operation Plan for Integrated Control on Urban Railway", Master's Thesis, Woosong University, 2014.
  5. J. K. Ryu, "A Study on the Appropriateness Investigation of the Construction of Rail Expansion Joint in Metro Line Tunnel", Master's Thesis, Seoul National University of Science and Technology, 2013.
  6. S. -i. Jin, "A Study on the Optimization of Urban Railway Route using GIS", Doctoral Thesis, Incheon National University, 2012.
  7. J. Y. Jeon, "Study on Lateral Damper to Prevent the Abnormal Impact Noise and Vibration(EMU Line 5)", Master's Thesis, Seoul National University of Science and Technology, 2012.
  8. J. -B. Lee, S. -s. Go and S. R. Chang, "The Risk Assessment of Work Type in Reinforced Concrete Construction Work", Journal of the Korean Society of Safety, Vol. 20, No. 1, pp. 119-125, 2005.
  9. J. -B. Lee, S. -s. Go and S. R. Chang, "A Study on the Risk Rate of Work Type According to the Fatal Accident Cases and the Work Strength in Construction Work", Journal of the Korean Society of Safety, Vol. 21, No. 4, pp. 102-107, 2006.
  10. S. -s. Go and J. H. Oh, "A Study on the Risk Assessment of Formwork", Journal of the Korean Society of Safety, Vol. 17, No. 3, pp. 96-101, 2002.
  11. M. -W. Lee and C. -S. Lee, "A Study on the Estimation of Severity for Apartment Construction Work", Journal of the Korean Society of Safety, Vol. 15, No. 2, pp. 118-125, 2000.
  12. M. -W. Lee and C. -S. Lee, "A Study on the Estimation of Severity Rate for Construction Work", Journal of Architectural Institute of Korea, Vol. 16, No. 5, pp. 105-112, 2005.
  13. KOSHA, "A Study on the Safety Models through Risk Assessment by Specialty Construction", 2009.
  14. Thomas L. Saaty, "The Analytic Hierarchy Process", New York, McGraw-Hill, 1980.
  15. Thomas L. Saaty, "Decision Making for Leaders", RWS Publications, 1995.