• Title/Summary/Keyword: construction type

Search Result 5,255, Processing Time 0.033 seconds

Analysis of the CM Industry Based on Owner Type : 1997 to 2013 Statistics (발주자 유형별 CM산업 수주실적 분석 : 1997~2013년 실적자료)

  • Ha, Jiwon;Kang, Seunghee;Jung, Youngsoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.209-210
    • /
    • 2015
  • Since CM policies established in 1996, contracts of CM services are continuously increasing over the past years. As constant improvement of positive awareness about public/private owners and CM capabilities of domestic construction companies, a number of efforts were being made to acquire competitiveness of domestic and overseas CM market. However, there has been lack of quantitative and comprehensive research to investigate CM firms. The purpose of this research is to statistically analyze total of 2,983 CM service contracts over the past 16 years published in KISCON (Knowledge Information System of Construction Industry) in order to examine CM owner type.

  • PDF

Development of Image-Based Artificial Intelligence Model to Automate Material Management at Construction Site (공사현장 자재관리 자동화를 위한 영상기반 인공지능 모델개발)

  • Shin, Yoon-soo;Kim, Junhee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.221-222
    • /
    • 2021
  • Conventionally, in material management at a construction site, the type, size, and quantity of materials are identified by the eyes of the worker. Labor-intensive material management by manpower is slow, requires a lot of manpower, is prone to errors, and has limitations in that computerization of information on the identified types and quantities is additionally required. Therefore, a method that can quickly and accurately determine the type, size, and quantity of materials with a minimum number of workers is required to reduce labor costs at the construction site and improve work efficiency. In this study, we developed an automated convolution neural network(CNN) and computer vision technology-based rebar size and quantity estimation system that can quickly and accurately determine the type, size, and quantity of materials through images.

  • PDF

Analysis of Construction Types Causing Secondary Defects in Apartment Buildings (공동주택의 2차 하자 유발공종 분석)

  • Huh, Yung-Chul;Ju, Jae-Hyun;Bang, Hong-Soon;Kim, Ok-Kyue
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.74-75
    • /
    • 2019
  • There are certain types of construction that produces many defects during the construction of apartment buildings. It may be due to construction errors in the type itself, but more often, it is due to defects derived from other types of construction. Thus, to reduce such secondary defects and prevent fundamental defects in particular types of construction, academic research on the types of construction causing secondary defects should be actively conducted. In addition, as claimed in this study, the industries should work harder to improve the quality of the type of construction that causes secondary defects, rather than just trying to improve the ostensible problems. If the efforts of each sector are backed up, the disputes over defect repair in apartment building construction will reduce in general, which in turn will lead to a reduction in national loss within the construction industry.

  • PDF

A Basic Study on the Application of Modular Construction - Focused on the Analysis of Case Study - (모듈러 건축의 현황과 활용에 관한 기초연구 - 사례조사 분석을 중심으로 -)

  • Kim, Jae-Young;Lee, Jong-Kuk
    • Journal of the Korean housing association
    • /
    • v.25 no.4
    • /
    • pp.39-46
    • /
    • 2014
  • This research was for the investigation and analysis of the illustration of modular construction application which is different use by each school facility since modular construction related examples are rare in domestic situation, and it has a limitation because of its being basic research material for generating the basic form of modular construction. The research results are as followings. First, in case of school facility from illustration investigation results, module measurement of class modulation is as similar as $3m{\times}10m$, but in resident facility the planning of more flexible plane shape can be possible since modules of 6 cases are free and various, and facade form of various types can be appeared by combination of module unit. Second, as a result of the generated characteristics in compared analysis of representative examples, school facilities were highly indicated for movability and duration reduction areas, and the flexibility, economic efficiency, and environment-friendliness was indicated low relatively. Third, the basic planning types of modular construction can be largely divided into layered type, horizontal (straightway) type, and compound type. The layered type has a short traffic line and facility system and is appropriate for the low-rise form unless separate construction method is used since it is susceptible to load. The horizontal type is advantageous for securing an opening since it has wide extent in light but has a long traffic line and facility system. Finally, the compound type can be possible for planning of various forms but needs the combination of various unit modules and traffic line and facility plan for it can be difficult.

A Study on the Sub-elements of the Top-down Construction Method Selection Model using Weighting Factor in Downtown Area (가중치 분석을 통한 도심지 Top-Down 공사에서의 공법요소 선정 모델 개발에 관한 연구)

  • Park, Chang-Wook;Moon, Seung-Yun;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.4
    • /
    • pp.61-69
    • /
    • 2008
  • The size of the construction projects become huge and complex, and the depth of excavation for the underground structures become deeper. Also the working area is not enough for loading materials and temporary facilities. This is the most case of recent construction projects in downtown area. Top-down is the most useful method for this kind of construction projects. Top-down construction method consists of supporting method, retaining wall type, foundation type and construction direction such as up-down or up-up. construction managers have to select sub-elements for top-down construction method in planning phase. This study is to suggest the sub-elements selection model for the top-down construction method, and the case study is conducted for evaluating this model.

A Comparative Study on Raglan-Sleeve Patterns According to Construction Factors (구성요인에 따른 래글런 슬리브 패턴의 비교 연구)

  • 이경화;조재희
    • Journal of the Korean Society of Clothing and Textiles
    • /
    • v.26 no.11
    • /
    • pp.1502-1513
    • /
    • 2002
  • The purpose of this study was to find relations between construction factors and adaptability on the 5 available raglan sleeve patterns through the drafting method. Also it was to suggest a functional sleeve pattern according to appearance and adaptability test. Three women in her twenties who have standard figure was selected as subjects. Raglan sleeves of 5 experimental clothes were rated by the appearance test and adaptability test. The major conclusions of this study are as follows. 1. The construction factors of the raglan sleeve are sleeve slant, sleeve cap height, biceps line, breast width. Bicep lines increased and sleeve cap height decreased as the sleeve slant decreased. The higher adaptability scores of raglan sleeves were, the lower sleeve slants were. 2. According to the appearance evaluation, B type was recorded the highest score 3. According to the adaptability scores, A type was recorded the highest score. In the pulled length of the waist-line, A type was the lowest movements among the pattern type. In the pulled length of the sleeve-line, A type was the lowest movements among the pattern types. Therefore A type was evaluated by the bort functional sleeve pattern type. Through the experiments, it was known that appearance and adaptability of the raglan sleeve patterns were effected by construction factor.

On the Construction of Cotton Tyeollik in Middle of Chosun Period - Through the Process of Reconstructing Tyeollik Excavated from Lady Kim's Tomb- (조선중기 솜텰릭(첩리) 구성에 대하여 - 순천 김씨묘 갈색명주솜누비털릭 중심으로 -)

  • 장인우
    • Journal of the Korean Society of Costume
    • /
    • v.52 no.8
    • /
    • pp.109-122
    • /
    • 2002
  • This study is to understand cotton Tyeollik construction of the middle Chosun Period through the reconstruction of tyeoilik which was excavated from lady kim's tomb (from sooncheon). The form of excavated Tyeollik classified into two types by the location of waistline. The structure of excavated tyeollik classified into three types by the construction(one-layer, two-layer, cotton/quilt) The form type change according to the period. The change of the form type has the close relation structure type in the tyeollik. Cotton-tyeollik belongs to the form of the front time. The construction of cotton tyeollik is similar with the one-layer Tyeollik Exception the construction of git(collar) and the size and direction of the fold. The surface pattern is composed of two-pieces but the liner is one-piece in the Git(collar). and In The size of fold surface is o.2-o.3cm, and liner is 0.5-0.8cm. The direction of fold in the liner is the contrast with the surface.

Effectiveness of Fatal Fall Accident Prevention through Design for Safety in Construction Industry (건설공사의 추락재해예방을 위한 설계안전기법의 효과성 분석)

  • Kyunghwan Kim;Kihyo Jung
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.2
    • /
    • pp.121-128
    • /
    • 2023
  • Construction industry is considered as one of the most high-risk industries for work-related injuries and fatalities, accounting for more than half of fatalities in Korea. Advanced countries have recognized the critical role of designers in preventing construction accidents and have established regulations on design for safety. In line with this, the Korean government have also implemented regulations that require owners and designers to review the safety of design outcomes. However, it has been observed that designers face challenges in identifying hazards and integrating design solutions at the design stage mainly due to their shortage of required knowledge and skills. This study aimed to examine design solutions that can be applied to prevent fall accidents in the construction industry, and to establish a relationship between these solutions and fatal fall accidents occurred over the past three years in Korea. This study also analyzed the relationships of four variables (construction type, cost, work type, and fall location) with design solutions. The results indicated that all four variables have significant relationships with design solutions, with fall location showing the strongest relationship. The design solutions and their relationships with fatal fall accidents identified in this study can be utilized in identifying hazard and integrating design solutions to ensure design for safety.

Site Mitigation Plan for Noise Sources from Construction Sites by Developing Movable Noise Barriers (건설공사장 이동식 방음시설물의 음향특성)

  • Lee, Sung Chan;Chung, Jin Yun;Im, Jung Bin
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.25 no.1
    • /
    • pp.58-64
    • /
    • 2015
  • There are a lot of different types of noise from construction site and it depends on construction stage, equipment type and number of operating equipments. The problem is that the almost noise from construction site is high level and some kinds of noise levels are over 100 dB. In addition, if construction site is located in downtown, there are a few options to reduce noise level. Therefore several site mitigation plans were developed to reduce different types of construction noises such as breaker work, gang form and asphalt saw. They were applied in site and evaluated noise reduction performance. The test result of site insertion loss was between 4~8 dB depends on the equipment and type of work.

Analysis of the Operation Performance of the Construction Safety System by Using Construction Accident Data (건설공사 사고 데이터(CSI) 활용을 통한 건설안전제도(안전관리계획서)의 운영성과 분석)

  • Kim, Seong-Deok;Cho, A-Yeong;Lee, Jeong-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.383-384
    • /
    • 2023
  • Using the CSI(Construction Safety Management Integrated Information) data, a comparative analysis was conducted by work type and construction cost according to whether the construction sites were subject to making a safety management plan or not. As a result, by type of work, the ratio of deaths in non-plan sites was high in mechanical facilities and earthworks, and the operation performance of the system was much higher in sites that were less than 5 billion won of construction cost.

  • PDF