The Implications of Amore-Pacific's New Office Landscaping Through the Ground Theory (근거이론을 통해 본 아모레퍼시픽 신사옥 조경의 함의)

  • Park, Seong-uk;Hong, Youn-Soon;Kim, Woo-Jin
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.50 no.6
    • /
    • pp.84-95
    • /
    • 2022
  • The landscaping of Amore-Pacific's new building has received various awards since its construction. This study attempted to identify the mechanisms of planning, design, and construction of this project through the ground theory. The results of the study are summarized as follows. The client's place attachment of the sites, which was the company's parent, was the driving force for an international design competiton in which architecture and landscaping were integrated. After that, in the detailed design stage for the actual implementation of the contest-winning plan, competent local designers and contractors were selected, and a consultative body was operated to engage in various opinions and promote rational decision-making. As for consultative body's operation method, simulation, physical model production, and detailed drawings were created after sharing opinions, and landscape design supervision played a major role. Establishing consistency in design and construction through integrated planning and landscape design supervision is required to cultivate craftsmanship and foster landscape coordinators in today's industrialized practice. The accumulation of related follow-up studies and supplementation of the system is anticipated.

Investigating Main Causes for Schedule Delay in Construction Projects in Bangladesh

  • Rahman, MD. Mizanur;Lee, Young Dai;Ha, Duy Khanh
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.33-46
    • /
    • 2014
  • Delay is the most common problem in the construction industry. It has many negative effects on project's success in terms of time, cost, quality, and safety. From the literature review, a total of thirty-five factors of delay were selected. These factors were divided into seven groups related to materials, manpower, owner, consultant, contractor, construction, and external problems. This study was carried out to identify the main causes of delay for a construction project through their importance level. The importance level was determined based on the frequency of occurrence and severity of impact. The structured questionnaire has distributed to the respondents who have much experience in construction management in Bangladesh. The results of analysis indicated that top five factors of construction delay according to their level of importance are: (1) price of construction materials increased very rapidly, (2) political situation (revolution/ public strikes), (3) shortages of skilled workers, (4) poor site management and supervision by contractor, (5) incompetent/ immature subcontractors. These findings of this study are expected to be significant contributions to Bangladesh construction industry in controlling current performance of project on time overrun.

Completing the Seohae Grand Bridge Construction Supervision (서해대교 감리를 마치며)

  • 전준수
    • Journal of the Korean Professional Engineers Association
    • /
    • v.34 no.1
    • /
    • pp.23-26
    • /
    • 2001
  • Seohae Grand Bridge is a part of the new West Coast Highway(353km) under construction, which connects Inchon and Mokpo. It is the longest bridge in Korea (7.31 km), and has 97 spans of 60m each precast segmental approach bridges, 2 main spans of 165m each free cantilever segmental bridge(500m), and 1 stay cable bridge of 990m In total length. During the seven year long construction period, many new construction technologies and methods were utilized for the first time in Korea, and gave invaluable opportunities to experience and master these in completing the project on time with safety and precision. I am proud of being a member of this project, and wish to express deep appreciations to those who participated in the project.

  • PDF

A Method for the Quality Improvement by the Punch List Analysis of Apartment Construction (아파트 공사의 펀치리스트 분석에 의한 품질개선방법)

  • Lee, Jae-Yong;Ji, Dae-Jun;Lee, Soo-Yong
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.2 s.80
    • /
    • pp.53-58
    • /
    • 2007
  • This study is to find out primary factors through the punch list in the large scale apartment housing complex, to prevent repeatedly occurring defects of construction and to gain quality management. The following are the findings of the research. (1) The positive strengthening of supervision for the workers can contribute to prevent defects of apartment construction and make better quality of the construction. (2) A solution should be made for the poor of surface join and the damage of work element showing a lot in the apart construction, which prevent defects and improve construction quality. (3) Indirect factors such as negligence and carelessness of the management should be improved to advance construction quality, and the caution and control strengthening of the management should be followed. It is revealed that hitch, omission, and heedlessness come from the defects, and the shortage of skill and checking appear as indirect factors. Therefore, to get quality improvement, the enhancement of the management factors, employment of excellent workers, and enhancement of working attitude and construction management are needed.

A COMPARISON OF OLD AND NEW OSHA REGULATIONS ON CRANES AND DERRICKS USING COMPREHENSIVE GAP ANALYSIS

  • Chung-Suk Cho;Francis Boafo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.74-79
    • /
    • 2013
  • Aiming at reducing deaths and injuries involving construction crane operations, OSHA has recently updated its 40-year-old crane safety standards with new rules addressing the use of cranes and derricks in construction. The goal of this change in rule is to deal with the leading causes of fatalities related to crane and derrick operations. Employers in the construction industry are mandated to ensure that employees in the work zone are trained to recognize hazards associated with the use of the equipment and any related duties that they are assigned to perform. However, those responsible at construction sites for the supervision and management of safe crane operations often lack the integrated knowledge of the standards, regulations and best practices for conducting or supervising daily, monthly, or quarterly inspection of cranes. As such, proper planning, management and implementation of crane operations, including inspections are just as paramount to reducing accidents on the construction site. It is important that engineers responsible for the management and planning of crane operations understand the latest OSHA crane and hoisting standards to ensure a safer work environment is maintained. Many on site engineers overseeing crane operations do not have adequate training, experience, and knowledge of the inspection requirements to assess safe crane operation and too often rely on the crane operator's judgement. This paper highlights recent research effort in defining significant changes in new crane and hoisting standards and provides basis for safety construction operations.

  • PDF

Analysis of the Building Demolition Process of the Republic of Korea Based on Case Study

  • JeWook LEE;Sung Ho HONG
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.1195-1202
    • /
    • 2024
  • Recently, the demand for building demolition in Korea has been increasing due to the rising number of old buildings and diversification of the types of buildings subject to construction demolition, and the related market size has been continuously growing. On the other hand, the laws, systems, and safety management related to building demolition are not implemented vigorously enough, so safety accidents frequently occur during the demolition process. In this study, we introduce the case of the collapse of a demolition building in Gwangju Metropolitan City in 2021, and we analyze the cause of the safety accident with the survey report published by the Korean government. Also, this study consists of institutional aspects of the demolition construction process in Korea and practical aspects such as sub-contracts, which are two main problems. Although Korean construction-related laws prohibit re-subcontracting in principle, illegal re-subcontracting is prevalent in building demolition and the supervision of building demolition is poor. Also, the dismantling plan does not function effectively as a practical checklist at the construction site due to complicated procedures and many requirements. In conclusion, for building demolition to be carried out more safely and efficiently, it is needed to reasonably improve related practices and systems in Korea.

Process Improvements for Reducing Apartment Defects after Completion (준공후 아파트 하자 저감을 위한 절차개선 방안 연구)

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.355-361
    • /
    • 2018
  • Many defects are occurring in apartments, the main residential area in Korea. This is due to a lack of construction skills and a lack of management. As many apartments are provided to buyers, the dispute over defects after completion is increasing rapidly. The Housing Act was amended so that local governments could order contractors to repair defects. However, even if defects are resolved after a defect is generated, it is not a fundamental solution that can be satisfied because buyers have to endure the pain caused by the defect. So, it is necessary to protect the interests of buyers by fundamentally reducing defects in apartments. Therefore, in this study, it was suggested that the asymmetry of the information about the apartment buyers should be resolved at the time of sale of the apartment, the final drawings should be a contract document, the review period of the apartment house supervision should be secured, the appropriate supervisory fee should be secured at the time of contract change and the payment procedure should be improved.

A Study on the Improvement Contract System of to Prevent Domestic Public Construction Claims (국내의 공공건설 클레임 예방을 위한 계약제도 개선방안 연구)

  • Jung, Min-Jung;Cho, Young-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.239-242
    • /
    • 2007
  • Many contractors have overlooked the construction contract general conditions and it was a bad construction practice. Today, construction project is very complex and complicated. This requires a networked contract document and results in a complicated contract conflict hardly to be solved. Therefore, to reduce the construction dispute and to enhance construction practice, clarification of definition of Owner, several conditions to be revised, insertion of design supervision were suggested in this paper.

  • PDF

A Study on the Calculation of Construction Project Cost of Healthcare Facility Business Plan (의료시설 사업계획서의 건축사업비 산정에 관한 연구)

  • Choi, Kwangseok
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.27 no.2
    • /
    • pp.7-14
    • /
    • 2021
  • Purpose: The purpose of this study is to provide an effective construction project cost estimation tool for preparing a business plan of healthcare facilities which can be practically used for development projects. Methods: In order to provide a tool for calculating construction project costs, this study analyzed the Building and Related Laws, the Building Technology Promotion Laws, the Ministry of Land, Infrastructure and Transport notifications and directives, the Ministry of Trade, Industry and Energy notifications, the detailed guidelines of the Ministry of Strategy and Finance, the Building Service Industry Promotion Acts, various certification standards, actual project budget calculation cases, etc. with advices from related experts. Results: 1) Construction cost is classified into construction costs, architectural design costs, supervision costs, incidental costs, and each sub-element. In particular, since there are many incidental cost items, essential items to be reviewed during planning are derived and costs are calculated according to appropriate consideration criteria. 2) Criteria for Payment calculation mainly applies the construction cost rate method or the actual cost fixed amount method in consideration of the characteristics and scope of work. Implications: There are many calculation factors that need to be applied to the construction project cost. Therefore, it is necessary to organize the calculation process more clearly.

A Study on Using PSM Policy for the Serious Accident Prevention of Construction (건설업 중대재해 예방을 위한 PSM 제도 활용에 관한 연구)

  • 정범모;양광모;강경식
    • Journal of the Korea Safety Management & Science
    • /
    • v.4 no.4
    • /
    • pp.1-14
    • /
    • 2002
  • As domestic buildings have been large-scaled, diversified and high-rise, there have been a consistent demand for design, development of construction technology and accident prevention activity as well as quality enhancement. In spite of governmental and related institutions' efforts for reducing national losses which come from numerous accidents, there have been endless small and large accidents on the construction site and thus, it is urgent to conduct empirical researches in this area. Currently safety supervision system in construction industry has enforced harm and danger prevention planning system, however it merely stick to other existing materials. In addition, it is difficult to put it into practice in that it requires bearing too much burden to draw out the planning itself in a case of large construction work. Consequently in this paper we select evaluation criteria by construction progress, classify into several categories, and regard potential danger which often occurs, as a evaluation criterion. Further step is to allow workers or collaborated companies to express their expert opinions or experiences and to encourage quality and process control and autonomous safety control by applying PSM method. The reason why PSM method should be quantitative and substantial progress is because it contributes Korean constructing companies to enhancing their safety control ability and to taking an equal stance just like developed countries,' thereby strengthening there competitive edges. Boost of safety control system by PSM method will make an enormous contribution to preventing construction accidents on the site by establishing and securing an autonomous safety control system.