It is a complex project to construct the standard system of sports events. Sports events standard system covers from the implementation plan to the evaluation work after the smooth implementation of sports events, involving many links. Large-scale sports events have extremely high media value. However, the successful organization and operation of large-scale sports events face many problems to be overcome, especially in terms of event safety. Although the organizers and organizers of large-scale events have invested many resources for the safe holding of sports events, violence similar to "football hooligans" in Europe is endless. At present, compared with Western countries, the standardization of sports events in China is low, and there is a problem of a late start and huge difference with Western developed countries. Knowing the construction of the standardization system's situation in China, we have summarized the data related to 15 sports events held in Chengdu is the last 5 years. By analyzing the problems in the process of holding these 15 events and the reflections of participants on the experience of sports events, the problems in the development of the standard system of sports events are discussed in depth. The final conclusion is that the system structure of China's sports events is not so good and athletes have a poor experience. China's sports event system still has many problems. Finally, we built a sports event standardization model using Internet of Things, and after a practical test we found that it has a good effect. Finally, we combined the current situation of sports event standardization system in China and put forward the following suggestions: laws and regulations related to the standard system of sports events must be formulated at the national level. The implementation level must strengthen the degree of integration of sports events and technology. To improve the quality of human resources in the management of sports events. The article puts forward targeted solutions, which play a great role in promoting the perfection and completeness of China's standard system for sports events. At the same time, it also promotes economic development and improves China's international status.
Performance indicators haven't been used for the assessment of the wastewater treatment facility or management in Korea yet, therefore they are going to be important parts in wastewater utilities because they are used to understand present situation and to compare one with other wastewater utilities. In this study, we used performance indicators to assess the condition of wastewater utilities and they were divided into four categories (A, B, C, and D). A category represented the condition of the planning & construction and composed of wastewater supply, disaster defence and employees. B category represented maintenance of wastewater utilities and were composed of manhole, sewer, and technical employees. C category showed the operation efficiency of wastewater utilities and D category represented the environmental load. To analyze the situation of wastewater utilities overall, cluster analysis was performed using four categori' es indicators. And CCC (Cubic Clustering Criterion) and R-square were used to decide the proper number of clusters, and wastewater utilities of 48 cities were divided into 5 groups(I, II, III, IV, and V groups). Each cluster was analyzed by average and standard deviation to understand the situation of wastewater utilities. A group analysis showed that IV and V clusters were insufficient, B group showed that I and IV groups were insufficient, C group showed all clusters are above average, and D group was also like C group.
In response to the current educational situation of students' heavy workload, the author constructs the precision-targeted classroom based on Precision Teaching (PT), Network Pharmacology, and Treatment Based on Syndrome Differentiation. The precision-targeted classroom can solve the current problems of PT and the phenomenon of the heavy academic burden on students, achieve the reduction of the burden and increase the efficiency of education. The precision-targeted classroom includes five key points: targeted goals, childlike thinking, precise intervention, intelligent homework, and stereoscopic evaluation, and the implementation process of the precision-targeted classroom is built from three aspects: before, during and after class. In addition, the author applied it to the actual mathematics classroom to test its teaching effect, and the experimental results showed that: the precision-targeted classroom significantly improved students' academic performance and thinking level; considerably improved students' classroom learning status, and facilitated teaching personalization and realized homework quantity control and quality improvement.
Park, Junwon;Lee, Sang-Ho;Kim, Sung-Hoon;Won, Jeong-Hun;Yoon, Young-Cheol
Journal of the Korean Society of Safety
/
v.35
no.1
/
pp.45-52
/
2020
Construction industry has a relatively higher industrial accident rate than other domestic industries. Thus, to reduce the accident rate, researches on the methodology of worker's safety education combined with new technologies like IT technology have increased. In the light of workers' safety information provision, this study develops a VR(Virtual Reality)-based construction site using the BIM(Building Information Modeling) data. The target structures and geographical features are included in the VR-based construction site where the construction machinery model and worker model are also created using a game engine. For highly effective provision of safety information, video clips with suitable captions corresponding to working processes were made with proper screen directing. They should be appropriately connected to correct worker's operations to improve the work commitment level, sense of reality and inducement of interest. From this scenario, the 3D VR-based construction site, which can be experienced through a VR equipment, was created and in the same platform, the safety information was provided by the video clip combined with the suitable captions. Although the real construction site involves various requirements depending on field situation and the expertness and experience of workers are not consistent, the developed safety information provision based on the VR construction site is expected to effectively reduce the incomplete factors leading to construction accidents by improving the worker's perception of workplace safety.
The field of Construction Engineering leads 1970's industry of the Korea. As a result of development of construction technology, It secure national competitiveness winning overseas contracts many kinds of plant, building and so on. In this situation, it is the most important task to cultivate and select construction teacher to train construction education and to foster construction skilled workers be going into the field of construction. This Study attempts to offer useful implications about the improvement of the Teacher Certification Examination through analyzing that will have a strong influence and be a standard in educational direction to cultivate construction teacher.
Kang Leen-Seok;Kwak Joong-Min;Moo Hyoun-Seok;Han Joo-A;Kim Hyun-Soo
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.358-361
/
2004
The objective of establishing IETM (Interactive Electronic Technical Manual) is not the just making into on-1 me system of technical manuals such as specifications. It is to produce construction standard documents in an electronic manual system to turn technical contents such as construction methods in technical manuals into multimedia information. Also, it is to maximize real-time information delivery by using visual data of construction sites. IETM enables to check not only design standards in the design but also applied situation of a construction method based on proper design standards and historical construction data on a real time basis. This study suggests a modeling method of IETM applicable to design and construction phase. The study includes a framework and a scenario for developing design IETM for construction project.
Journal of Korean Society of Disaster and Security
/
v.13
no.1
/
pp.41-50
/
2020
The introduction, construction, and operation of the safety and health management system of specialized construction companies have a problem incurred in the cost of introducing and operating the safety system. In addition, it is difficult to establish a virtuous cycle system to build a safety system, obtain a certification, and settle in a harsh environment that does not have technical personnel in construction safety. The purpose of this paper is to investigate and review the literature related to the safety and health management system of the construction industry and to analyze various research trends such as the actual situation. Through this, it is to find ways to improve the safety and health management system level of specialized construction companies that want to build and obtain the safety and health management system of the construction industry and specialized construction companies that are carrying out the post-assessment and extension examination after obtaining the certification.
Journal of the Korea Institute of Building Construction
/
v.20
no.4
/
pp.367-373
/
2020
As the supervision in site is integrated into construction management, the organization's work is expanded, and the perspective and goals of the work have changed, so there is a high possibility that the conflict situation within the organization will increase. Organization conflict increase a job stress of workers, so it acts as a negative factor in deriving organizational performance. Therefore, the purpose of this study is to analyze the correlation between organization conflict and job stress of construction manager in construction site. As a result of the study, the organization conflict of the construction manager was generally low, and the job stress was also less than that of other area's workers. In addition, correlation analysis revealed that organization conflict and job stress were related. The results of this study may help to improve the organization structure in the construction management site organization.
Kim, Sang-Chul;Park, Chan-Jeong;Lee, Sang-Youb;Son, Jae-Ho
Korean Journal of Construction Engineering and Management
/
v.8
no.5
/
pp.109-118
/
2007
It is related to launch the CM market and to increase the profit and entire ability in company that is enforcing the ability of construction management in large-scaled construction company. According to the CM market in U.S, CM market is increased with competing to the companies, that is E&C, general contractor, design firm, specialized CM firm. Also domestic market is similar to US market. In this situation, large-scaled construction companies are filled with construction management ability for competing with foreign companies and domestic CM firms. This paper suggests how to enforce the construction management ability through education, and shows the detailed education strategy considered the fields, divisions and positions.
Journal of the Korea Institute of Building Construction
/
v.10
no.1
/
pp.127-135
/
2010
As the amount of construction information used in the growing construction field increases, the importance of efficient construction field management has been growing. Accordingly, this study aims to identifythe application situation and possibility of BIM through theoretical examinations and domestic & overseas case studies of BIM, and attempts to suggest an approach to the formulation of an efficient construction field management model through the implementation of phase-oriented and cooperation entity-oriented analysis in the construction field. In the future, the conclusions of this study should be used to formulate an actual construction field management model and apply it in the field.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.