Application of Logistic Simulation for Transport of SFs From Kori Site to an Assumed Interim Storage Facility

  • Kim, Young-Min;Kim, Chang-Lak
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.19 no.1
    • /
    • pp.61-74
    • /
    • 2021
  • A paradigm shift in the government's energy policy was reflected in its declaration of early closure of old nuclear plants as well as cancellation of plans for the construction of new plants. To this end, unit 1 of Kori Nuclear Power Plant was permanently shut down and is set for decommission. Based on these changes, the off-site transport of spent fuels from nuclear power plants has become a critical issue. The purpose of this study is to develop an optimized method for transportation of spent fuels from Kori Nuclear Power Plant's units 1, 2, 3, and 4 to an assumed interim storage facility by simulating the scenarios using the Flexsim software, which is widely used in logistics and manufacturing applications. The results of the simulation suggest that the optimized transport methods may contribute to the development of delivery schedule of spent fuels in the near future. Furthermore, these methods can be applied to decommissioning plan of nuclear power plants.

Construction Claims Prediction and Decision Awareness Framework using Artificial Neural Networks and Backward Optimization

  • Hosny, Ossama A.;Elbarkouky, Mohamed M.G.;Elhakeem, Ahmed
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.11-19
    • /
    • 2015
  • This paper presents optimized artificial neural networks (ANNs) claims prediction and decision awareness framework that guides owner organizations in their pre-bid construction project decisions to minimize claims. The framework is composed of two genetic optimization ANNs models: a Claims Impact Prediction Model (CIPM), and a Decision Awareness Model (DAM). The CIPM is composed of three separate ANNs that predict the cost and time impacts of the possible claims that may arise in a project. The models also predict the expected types of relationship between the owner and the contractor based on their behavioral and technical decisions during the bidding phase of the project. The framework is implemented using actual data from international projects in the Middle East and Egypt (projects owned by either public or private local organizations who hired international prime contractors to deliver the projects). Literature review, interviews with pertinent experts in the Middle East, and lessons learned from several international construction projects in Egypt determined the input decision variables of the CIPM. The ANNs training, which has been implemented in a spreadsheet environment, was optimized using genetic algorithm (GA). Different weights were assigned as variables to the different layers of each ANN and the total square error was used as the objective function to be minimized. Data was collected from thirty-two international construction projects in order to train and test the ANNs of the CIPM, which predicted cost overruns, schedule delays, and relationships between contracting parties. A genetic optimization backward analysis technique was then applied to develop the Decision Awareness Model (DAM). The DAM combined the three artificial neural networks of the CIPM to assist project owners in setting optimum values for their behavioral and technical decision variables. It implements an intelligent user-friendly input interface which helps project owners in visualizing the impact of their decisions on the project's total cost, original duration, and expected owner-contractor relationship. The framework presents a unique and transparent hybrid genetic algorithm-ANNs training and testing method. It has been implemented in a spreadsheet environment using MS Excel$^{(R)}$ and EVOLVERTM V.5.5. It provides projects' owners of a decision-support tool that raises their awareness regarding their pre-bid decisions for a construction project.

A Product Model Centered Integration Methodology for Design and Construction Information (프로덕트 모델 중심의 설계, 시공 정보 통합 방법론)

  • Lee Keun-Hyoung;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.99-106
    • /
    • 2002
  • Researches on integration of design and construction information from earlier era focused on the conceptual data models. Development and prevalent use of commercial database management system led many researchers to design database schemas for enlightening of relationship between non-graphic data items. Although these researches became the foundation fur the proceeding researches. they did not utilize the graphic data providable from CAD system which is already widely used. 4D CAD concept suggests a way of integrating graphic data with schedule data. Although this integration provided a new possibility for integration, there exists a limitation in data dependency on a specific application. This research suggests a new approach on integration for design and construction information, 'Product Model Centered Integration Methodology'. This methodology achieves integration by preliminary research on existing methodology using 4D CAD concept. and by development and application of new integration methodology, 'Product Model Centered Integration Methodology'. 'Design Component' can be converted into digital format by object based CAD system. 'Unified Object-based Graphic Modeling' shows how to model graphic product model using CAD system. Possibility of reusing design information in latter stage depends on the ways of creating CAD model, so modeling guidelines and specifications are suggested. Then prototype system for integration management, and exchange are presented, using 'Product Frameworker', and 'Product Database' which also supports multiple-viewpoints. 'Product Data Model' is designed, and main data workflows are represented using 'Activity Diagram', one of UML diagrams. These can be used for writing programming codes and developing prototype in order to automatically create activity items in actual schedule management system. Through validation processes, 'Product Model Centered Integration Methodology' is suggested as the new approach for integration of design and construction information.

  • PDF

A Knowledge-based Approach to Plant Construction Process Planning (지식 기반 플랜트 건설 공정 계획 시스템의 개발)

  • 김우주
    • Journal of Intelligence and Information Systems
    • /
    • v.7 no.1
    • /
    • pp.81-95
    • /
    • 2001
  • Plant construction projects usually take much higher uncertainty and risks than the projects from other domains. This implies the importance of plant construction project management should be more emphasized than the other domain. Especially, the overall successes of the projects often depend on the performance of process planning and scheduling performed at the initial stage of the project. However, most plant construction projects suffer great difficulties in establishing proper process planning and scheduling timely because of unstructureness and dynamicity of environment of the project itself In this paper, we propose a knowledge-based process planning and scheduling approach in a plant construction domain to cope this problem. First, we modulize process planning knowledge and present the knowledge representation scheme. Second, we propose an inferencing mechanism to build a process planning for plant construction based on the represented process planning knowledge. Since our approach automate the initial process planning, which was usually done by manual way, it can improve the correctness and also completeness of the process plan and schedule by reducing the time to plan and allowing simulations on the various situation. We also design and implement this our approach as a real working system, and it is successfully applied to real plant construction cases from a leading construction company in Korea. Based on this success, we expect our approach can be easily applied to the projects of other areas, while contributing to enhancement in productivity and quality of project management.

  • PDF

Developing an Owner's Project Evaluation Framework for Construction Management (프로젝트 관리자로서의 발주자 사업수행평가 프레임워크 개발)

  • Kim, Jonghoon;Lee, Hyun-Soo;Park, Moonseo;Park, Sanghyuk;Lee, Inbeom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.130-137
    • /
    • 2016
  • Owner's participation on a construction project can alter the success of a construction project. In general, success of a construction project is measured by project schedule and cost decrease without considering the role an owner has in a project. As a result, this research developed a framework for the project evaluation form and after extracting a total of 9 project critical success factors (CSF) and 27 sub-CSF. AHP method was utilized to evaluate the importance factor of each CSFs. Setting a goal for each CSFs at the beginning of a project and comparing the values at the completion of the project utilizing the project evaluation form will allow a systematic evaluation and management of a project. Solution Map was introduced and Solution Tool was suggested in order to utlize the evaluation results effectively. In the future studies, various project cases needs to be supplemented for further verification and a solution based on the evaluation result needs to be developed that can be applied to construction projects.

Productivity Analysis for Strutural Formwork Using 3D BIM (3D BIM을 활용한 골조 거푸집 공사의 생산성 분석에 관한 연구)

  • Choi, Chang-Hoon;Park, Young-Jin;Soh, Ji-Yoon;Kim, Sung-Yeon;Lee, Junbok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.4
    • /
    • pp.292-300
    • /
    • 2014
  • The construction progress control is very important because there are many unexpected factors affecting time schedule delay and cost overruns. A complicated measure including item quantity and inherent time and costs is used to monitor the progress. Another element to be considered is a productivity, which is cost effectiveness because productivity is primarily measured by the costs. Productivity is stated as constant in-place value divided by inputs such as worker-hour. The main purpose of this paper is to analyze the productivity of structural formwork using a 3D BIM. In order to achieve the research objective, an integrated model of a BIM with a daily foreman's report is developed. The quantities being extracted from a 3D model and information are integrated with manpower utilized. The developed model is applied to a case project to measure and analyze the productivity in terms of individual building and work crew team. The results are discussed and further research topics will be addressed.

Productivity Improvement through the Waste Elimination of Construction Process (건설공정의 낭비제거를 통한 생산성 향상 방안)

  • Mun Jeong-Mun;Kim Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.4 s.12
    • /
    • pp.93-103
    • /
    • 2002
  • The reinforcement concrete work is the work affected by structural safety, durability, and schedule with form work. The domestic reinforcement concrete works have mainly worked the process of re-barfabrication/assembly on site. Finally it have low productivity. Then this paper analyzed waste factors and the process of re-bar fabrication/assembly on site for the productivity improvement and value-added productivity improvement. Waste factor analysis aims at maximizing value-added by the value analysis of re-bar fabrication and assembly on site. Finally, Value-AddingActivity(VAA)ismuchlessthan non-value adding activity. Especially, Non-Value-Adding Activity(NVAA) generates waste such as the activity steps, labors, equipments, materials, time, and soon. And it was non-flow production, over production, and analyzed into having to shift value. This paper aimsat maximizing value-addingactivity and minimizingnon value-addingactivity through waste factor analysis in process for the improvement of value added productivity.

A Study on Effective Education Program for Steel House (대학에서의 스틸 하우스(Steel House) 교육과 프로그램의 효율적 운영방안 - 한국기술교육대학교의 사례를 중심으로 -)

  • Kim, Kijoo
    • The Journal of Korean Institute for Practical Engineering Education
    • /
    • v.3 no.2
    • /
    • pp.1-10
    • /
    • 2011
  • The ultimate goal of architecture is to construct a building through design and supervision. According to this circumstance, architectural education divided into two part ; design and construction. However, these two processes have to be one program for better education. In this aspect, steel housing program could be a desirable one because of its structural(bearing wall) system and relative short construction schedule. In KUT architectural program, steel housing has been one of the most effective and important for about ten years. In this research, the contents(s/w) and running process of this program and practice lab(h/w) will be introduced with detail. And this study could be a good guideline for a better combination program with theory and practice in architectural engineering field.

  • PDF

Impacts on Residence Time and Water Quality of the Saemangeum Reservoir Caused by Inner Development (새만금 내부개발이 체류시간 및 수질변화에 미치는 영향)

  • Yoo, Sang-Cheol;Suh, Seung-Won;Lee, Hwa-Young
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.15 no.3
    • /
    • pp.186-197
    • /
    • 2012
  • In order to understand hydrodynamic and water quality changes on the Saemangeum reservoir in accordance to inner development plan, intensive numerical simulations using EFDC have been done. Due to inner dike construction and proposed dredging plans, stratification might occur and yield flow field change. It should be noticed that very conditional gate operation schedule adjusting target water elevation of -1.5 meter causes severe stratification and hence plays an important role in poor water qualities. By using random walk particle tracking residence simulations, it is found that hydrodynamic characteristics depends greatly on riverine inflow conditions. It is also inferred that the northern part of the Mangyeong reservoir behaves as a dead zone and acts as major reasoning of water quality deterioration owing to benthic flux from long-term residing settled sediment.

A case study on perforation under Daejeon station building by Front-Jacking method (Front-Jacking공법에 의한 대전역사 하부 관통사례)

  • Kim, Yong-Il;Hwang, Nak-Yeon;Jeong, Du-Seok;Cha, Jong-Hwi;Lee, Nae-Yong
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2006.03a
    • /
    • pp.195-203
    • /
    • 2006
  • The crossing construction under railroad have two methods which are cut and cover and trenchless method. first, cut and cover method is an extremely limited method concerning non-running time. Whereas, trenchless method is free from restriction such as train speed and running time, and has the strong points of safe and rapid construction. Front Jacking method, one of the trenchless methods, is frequently applied recently due to its stability during construction and vantage of assuring schedule reliability. The procedure is that after minimizing interlocking friction with structure and earth pressure due to jacking the small steel tube, pulling the precast box manufactured at the field in the ground using PC strand and hydraulic Jack. This method is able to be applied regardless of section size and length of box and condition of ground. And that is also pro-environmental. This paper presents the case of Daejeon E. W. perforate Road Project applied with the Front Jacking method.