• 제목/요약/키워드: construction schedule

검색결과 747건 처리시간 0.026초

BIM기반 건축시공 시뮬레이션 시스템 프로토 타입 개발에 관한 연구 (A Study on Proto-type Development of BIM based Architectural Construction Simulation System)

  • 박재현;윤석헌;백준홍
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2008년도 정기 학술대회
    • /
    • pp.442-445
    • /
    • 2008
  • The purpose of this study is making Proto-type development of BIM based Architectural Construction Simulation System. This study suggest a new schedule access method for overcoming limitation of current Simulation Program focused on visualization. The method made from analysis of current Simulation Program. This program is based on Visual Basic .Net language.

  • PDF

Development of a Project Schedule Simulation System by a Synchronization Methodology of Active nD Object and Real Image of Construction Site

  • Kim, Hyeon Seung;Shin, Jong Myeong;Park, Sang Mi;Kang, Leen Seok
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.344-348
    • /
    • 2015
  • The image data of the web camera is used to identify the construction status of the site in a remote office and it can be used for safety management. This study develops a construction schedule simulation system based on the active nD object linked with real image data of web camera from the construction site. The progress control method by 4D object uses a method that the progress of each activity is represented with different colors by progress status. Since this method is still based on a virtual reality object, it is less realistic description for practical engineers. Therefore, in order to take advantage of BIM more realistic, the real image of actual construction status and 4D object of planned schedule in a data date should be compared in a screen simultaneously. Those methodologies and developed system are verified in a case project where a web camera is installed for the verification of the system.

  • PDF

공정관리 활용을 위한 BIM모델의 공정별 수순 및 위치정보 추출방안 (Method of Deriving Activity Relationship and Location Information from BIM Model for Construction Schedule Management)

  • 윤형석;이재희;황재영;강효정;박상미;강인석
    • 한국건설관리학회논문집
    • /
    • 제23권2호
    • /
    • pp.33-44
    • /
    • 2022
  • 시공단계의 BIM 활용 시 대표적인 기능은 4D시스템에 의한 공정 시뮬레이션 기능을 들수 있다. 4D시뮬레이션을 위해서는 공정 생성 후 공정별 3D모델의 연동과정이 필수적으로 요구된다. 설계단계에 작성된 3D모델은 공정 정보를 고려하지 않으므로 시공단계 적용을 위한 공정 정보의 생성과 3D모델의 연동과정에는 실무적 애로사항이 존재한다. 본 연구에서는 설계단계에 작성된 3D모델에서 HDBSCAN 알고리즘을 이용하여 시공단계의 공정 정보를 추출한 후에 위상정렬 알고리즘 적용으로 선후행관계를 파악하고 공정정보를 자동으로 생성하는 방법론을 제시한다. 생성된 공정 정보는 설계 3D모델을 기반으로 생성되었으므로, 4D시스템에서 공정과 3D모델간의 공통 매개변수에 의해 상호간 자동 연동되는 정보로 활용되어 4D시스템의 실무적 활용성을 배가할 수 있다. 제시된 방법론은 4개 교량에 적용하여 공정 정보 생성결과를 확인하였고, 4D시스템에 적용하여 공정과 3D모델 연동과정의 간편화를 확인하였다.

국내 건설공사에서 공기지연 분석방법 적용 사례 분석 (Case Analysis on Application of Project Delay Analysis Method in Domestic Construction Project)

  • 김선규;권순욱
    • 한국건설관리학회논문집
    • /
    • 제20권6호
    • /
    • pp.98-106
    • /
    • 2019
  • 최근 국내 건설공사에서 공기관련 클레임과 분쟁의 발생건수가 급격한 증가세를 보이고 있다. 이러한 현상은 전통적으로 발주자 우위의 국내 건설 계약관행이 계약당사자간 상호적이며 균형적인 관계로 변화되고 있음을 시사하는 것이다. 공기지연 분석은 건설공사 착공시 승인된 공정표의 종류, 공사진행 과정에서 공정표 실적관리를 어떻게 했는지에 따라 적용 방법을 선정하게 된다. 그리고 공기지연 분석에서 가장 중요한 전제조건은 공사초기에 합의된 완전한 CPM공정표가 준비되어 있고, 그러한 공정표의 실적관리가 제대로 기록되어 있는 것이다. 본 연구는 국내 민간 발주자의 대형신축건물을 공사하는 과정에서 시공자가 손해를 보았다며 발주자를 상대로 손해배상을 청구한 사건의 공기지연 분석 방법론을 적용에 관한 것이다. 본 연구에서는 불완전한 CPM공정표에 계획공정 분석법 적용이 적절한 지 판단하고, 이에 대한 대안으로 새로운 기준의 계획공정 대비 완료공정법을 제안한다. 그리고 사례 프로젝트에 계획공정 대비 완료공정법을 적용한 다음, 계획공정 분석법 결과와 비교분석한다. 본 연구의 목적은 국내 건설공사의 공정관리 현실에 적합한 공기지연 분석방법을 제시함으로써, 향후 국내 건설공사의 공기지연관련 분쟁과 소송에서 의미 있는 참고자료로 활용될 수 있도록 하는 것이다.

BIM기반 추계학적 공기 예측 모듈 프로토 타입 개발에 관한 연구 (A Study on Proto-type Development of BIM based Stochastic Duration Estimation Module)

  • 박재현;윤석현;백준홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.159-162
    • /
    • 2009
  • Today's construction is more various and more complex. Because of that, a lot of uncertain factors are occurred and they related uncertain construction duration. For management complex architecture project, importance of construction schedule management also increased. In previous studies, one of solutions to overcome those problems is suggested. It was BIM based construction simulation process which focused on construction schedule and construction schedule management. But latest process had limited point which has no duration estimation function. So this paper suggested duration estimation method and developed duration estimation module. Duration estimation module developed with current scheduling tool MS Project and their macro function. However, this module has just developed Reinforced Concrete Structure and has to do more development and research.

  • PDF

추계적 EVMS 기반 예비비 산정 방법론 (Contingency Estimation Method based on Stochastic Earned Value Management System)

  • 곽한성;최병윤;이창용;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.72-73
    • /
    • 2018
  • The accuracy of contingency estimation plays an important role for dealing with the uncertainty of the financial success of construction project. Its' estimation may be used for various purposes such as schedule control, emergency resolve, and quality expense, etc. This paper presents a contingency estimation method which is schedule control specific. The method 1) implements stochastic EVMS, 2) detects a specific timing for schedule compression, 3) identifies an optimal strategy for shortening planned schedule, 4) finds a probability density function (PDF) of project cost overrun, and 5) estimates the optimal contingency cost based on the level of confidence. The method facilitates expeditious decisions involved in project budgeting. The validity of the method is confirmed by performing test case.

  • PDF

건설시설물 공정정보 시각화를 위한 4D CAD시스템의 개발 및 적용사례 분석 (Development and Case Study of 4D CAD System for Visualizing Schedule Data of Construction Project)

  • 강인석;윤선미;권중희;문진석
    • 한국철도학회논문집
    • /
    • 제10권4호
    • /
    • pp.373-380
    • /
    • 2007
  • Recently, various 4D CAD systems for visualizing construction schedule data are being developed. Specially, in case of railway project, the numerical information of progress data should be changed with visualized data by long construction section because the railway project consists of long length in construction site. This study suggests a case study of development of 4D CAD system for visualizing schedule information and the major functions of developed system are verified by railway project. The detailed application procedure of 4D CAD system including input data for a railway project is described in the study. The practical application of 4D CAD system can be improved in railway project by these demonstration researches.

메가프로젝트 사업초기단계 사업기간 예측 방법에 관한 연구 (A Study of Construction Duration Predicting Method for Mega Project)

  • 우유미;이승훈;이희덕;서용칠
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.597-600
    • /
    • 2008
  • 최근 국내에서 도심재생을 위한 입체복합공간 개발사업으로 여러 메가프로젝트가 수행중이지만, 메가프로젝트 실적 자료 및 경험, 기술부족으로 인해 여러 가지 문제점들이 드러나고 있다. 다양한 유형의 프로젝트들로 구성된 입체 복합공간 개발 사업에서 프로그램 및 프로젝트 수준으로 메가프로젝트를 관리할 수 있는 기술이 요구된다. 메가프로젝트는 다년간에 걸쳐 수행되는 사업으로 사업기간 예측과 그에 따른 공정관리가 무엇보다 중요하다. 따라서 메가프로젝트 특성에 맞는 프로그램레벨에서의 공정관리 기술 개발이 필요하다. 본 연구에서는 공정관리 기술개발의 선행연구로 사업초기단계 사업기간 예측 및 일정 계획 방법에 대해서 제시하였다. 먼저 과거 수행된 단일시설 및 복합시설의 프로젝트 속성정보와 설계 및 공사기간의 일정데이터를 수집하여, 프로젝트 기간 예측을 위한 DB의 개발방향을 제시하였다. 그리고 메가프로젝트 사업초기단계 사업기간 예측 시 영향을 미치는 발주자의 요구사항과 사업비 투입계획에 따라 시나리오를 개발하여 사업기간 예측 방법에 대해 제시하였고, CCPM을 통한 사업기간 단축가능성을 제시하였다.

  • PDF

철골골조공사의 실시간 진도관리 시스템 구축에 관한 연구 (A Study on the Development of a Real-Time Schedule Progress Control System in Steel Structural Construction)

  • 김경훈;김경환;이윤선;김재준
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.886-891
    • /
    • 2007
  • 최근 공정관리를 위한 각종 기법들이 개발되고 있으며, 실질적인 시공프로세스를 구체적인 3차원 이미지로 형상화하여 보여줌으로써, 공정계획에 대한 추상적인 개념 모델을 구체적인 것으로 변환하여 발전시킬 수 있다. 하지만 이는 3D-CAD와 공정프로그램을 연계하여 사용하는 방식으로 사람이 정보를 옮겨주거나 입력을 해야 하는 번거로움이 수반된다. 본 연구에서는 3D-CAD 객체 정보 시스템 활용 및 공정자동생성 모듈을 활용하여 통합DB 구축을 통한 실시간 철골공사 공정관리 시스템 프로세스를 구축하였다. 본 연구는 IDEF0 모델을 이용하여 철골공정 관리 프로세스를 제시하였으며, RFID 시스템 설계를 통하여 실시간 진도관리 및 분석 프로세스를 제시하였다. 이를 통해 예상공정정보의 신속한 생성과 실시간으로 실제공정정보와의 비교 ${\cdot}$ 분석 및 시뮬레이션을 실현하고자 한다.

  • PDF

건설공사 공기연장사유 관리모델 (An Administration Model for Causation of the Schedule Delays in Construction Projects)

  • 김종한;김경래
    • 한국건설관리학회논문집
    • /
    • 제8권3호
    • /
    • pp.125-133
    • /
    • 2007
  • 건설공사 계약에서 공기연장 시에는 계약당사자의 귀책에 따라 지체상금의 부과 내지는 연장비용을 지급토록 규정하고 있으나, 그 이행에 있어 당사자의 정량적 귀책구분 등 분석결과에 의해 전형적으로 이행되는 경우는 거의 없다고 할 수 있다. 결국 이는 수행참여자의 계약적 의무이행에 대한 책임회피이며, 향후 잠재된 공기연장클레임 등 더 많은 시간과 비용을 지불해야 하는 분쟁으로 비화될 것은 자명하다 할 것이다. 그 원인으로는 현행의 CPM 네트워크공정표에 의한 공정관리 방법 이 수동적이고 사후적 인 관리로서 공기 연장이 발생한 후, 그 사유 및 기간의 책임분석을 통한 관리로 그 한계성으로 인하여 연장예방 및 클레임해결이 불가능한 것이다. 따라서 본 연구에서는 현행 계약자들의 공정관리 수준을 고려하고, 공기연장의 핵심이라 할 수 있는 연장사유에 대한 사전관리를 통한 프로세스 접근방식(Process Approach)의 공기연장사유 관리모델을 제시하여 프로젝트 수행 당사자의 책임의식 고취와 책임관리, 사전관리, 증거관리를 능동적으로 수행 가능할 수 있게 하여, 공기 연장예방 및 당사자의 원만한 클레임해결을 위한 관리기준 모델을 제시하는 것이다.