리스크 분석을 통한 지하 구조체 공법 선정에 관한 연구 (A Study on the Selection of Underground Construction Method by Risk Analysis)

  • 윤여완;양극영;홍성휘
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2001년도 학술논문발표회
    • /
    • pp.99-117
    • /
    • 2001
  • In the past, The selection of individual method of construction was done by head of construction site or an experienced person very frequently. By doing this, The wrong selection of construction method without exact adjudication of construction site situation lead to increasing of cost and extension of construction term. Finally it will effect all over the construction process. Especially, In case of Underground construction in the beginning, there are a lot of a variable factor and it also effect on the entire construction process and it need rely careful process. The purpose of this study is to present the best suitable methodology fer selection of construction method by considering potential risk of construction method and variables together with external condition for Underground construction. The purpose of this study is to select the most suitable construction method by analysing potential conditions(Construction site situation and Client. Request in designing) To do this, We prepared arrangement rule to arrangement conditions for construction method. And then make Checklist the analyzing construction method. Though above process, To expect the risk of individual construction method using above risk checklist and using Analytic Hierarchy Process among Multiple-Criteria Decision Making, the professional opinions is to be adapted. By doing this, It can lead and select the most suitable considering method considering the data which get from risk density test.

  • PDF

건설공사의 위험도 분석평가 및 모델개발 (Development of a Risk Analysis Assessment Models for the Construction Projects)

  • 이정식
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제3권2호
    • /
    • pp.233-240
    • /
    • 1999
  • Even though the recent construction safety disasters not only result in the loss inside construction sites but also become to a large public disasters, safety activities are managed in an irrational way and safety rules are ignored in the construction sites which leads to occur same type of disasters repeatedly. In this paper, a fuzzy set theoretic approach to risk analysis is proposed as an alternative to the techniques currently used in the general construction projects safety. Then the concept of risk evaluation using linguistic representation of the likelihood, exposure and consequences is introduced. A risk assessment model using approximate reasoning technique base on fuzzy logic is presented to drive fuzzy values of risk and numerical example for risk analysis is also presented to illustrate the results.

  • PDF

원자력 발전 플랜트 RCB 시공의 리스크 요인에 관한 분석 모델 (Analysis Model on Risk Factors of RCB Construction in Nuclear Power Plant)

  • 신대웅;신윤석;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.212-213
    • /
    • 2014
  • The purpose of this study is to suggest analysis model of RCB construction in nuclear power plant. For the objective, This study drew the risk factors of RCB construction from existing literature. The results of the study proposed analysis model made hierarchy in rebar, form, and concrete work. These will be baseline data for risk management in construction project of nuclear power plant.

  • PDF

APPLICATION OF CONTRACTORS' RISK PREFERENCE ON THE EVALUATION OF THE PHILIPPINE GOVERNMENT STANDARD CONTRACT

  • Visuth Chovichien;Joel Cesarius V. Reyes
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.144-152
    • /
    • 2009
  • Construction contracts involve the allocation or distribution of the risks inherent to a construction project between or among contracting parties. However, it has been a common practice that only one party drafts the contract due to practical reasons and particular policies of various organizations. Interviews were conducted on some local contractors to gain their meaningful insights and standpoints on the allocation of each risk. These results were compared with the actual risk allocation using the Philippine government standard contract and risk principles from the literature to determine if their considered opinions provide a plausible alternative. A sample application of this evaluation is presented for construction-related risks and risk allocation recommendations are provided in the end.

  • PDF

Individual behavioral competences for construction project risk manager

  • Lee, Kwang-Pyo;Lee, Hyun-Soo;Park, Moonseo;Kwon, Byung-ki;Hyun, Hosang
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.183-187
    • /
    • 2015
  • The Risk Management (RM) is applied for managing uncertainty of project. In this circumstance, the competences of RM have a direct effect on the performance of its application. Especially, as the RM, one of the project management areas, is a peopleoriented management field, the individual behavioral competences are significant for a risk manager. Therefore, this paper describes the development of individual behavioral competences for construction project risk manager. For this, the research classifies the individual behavioral competences of RM. And, the Exploratory Factor Analysis (EFA) are applied to verify a validity of the competences. Likewise, a reliability analysis using Cronbach's alpha values is performed to test internal consistency. Based on the results, the authors carry out the Focus Group Interview (FGI) on expert panels of construction RM to confirm the hierarchical model of the individual behavioral competences. It is concluded that the proposed hierarchical model of individual behavioral competences helps construction companies to diagnose the competences of their project risk manager for progressing.

  • PDF

RISK FRAMEWORK FOR NEXT GENERATION NUCLEAR POWER PLANT CONSTRUCTION

  • John Walewski ;Stuart Anderson;Jaeheum Yeon;Amy Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.451-458
    • /
    • 2013
  • This research documents the initial findings and recommendations for developing a risk management tool to assess and quantify the risks associated with the construction of the next generation of nuclear power plants. The proposed tool builds upon the Construction Industry Institute's International Project Risk Assessment (IPRA) Best Practice. This paper provides an overview of the investigation to assess the unique risk elements pertaining to nuclear power plant construction and documents the preliminary findings from historical project performance data to better understand the function and use of the IPRA's Relative Impact value.

  • PDF

위험도 기반 건설경영 리스크 평가에 관한 연구 (A Study on the Risk Evaluation of Construction Management Based on Risk Identification)

  • 이현철;이건;여상구;고성석
    • 한국건설관리학회논문집
    • /
    • 제10권3호
    • /
    • pp.83-91
    • /
    • 2009
  • 건설산업은 다수공정에 대규모의 자본과 인력, 자원이 투입되는 복합 산업으로써 투입 인자 및 내 외부 환경인자에서 발생가능한 리스크 요인에 대한 복합적이고 체계적인 경영 및 관리가 필요하다. 즉, 이들 투입 및 환경인자에 대한 체계적 리스크 관리를 통한 건설경영 확립으로 불필요한 지출 및 낭비를 막고 기대수익을 극대화 할 수 있다. 그러나 프로젝트 단위로 사업이 이루어지는 건설산업의 특성에 비추어 사업유형 및 특정 공정단위를 대상으로 하는 리스크 관련 연구는 활발하게 진행되고 있으나, 기업적인 차원에서 경영분야 전반에 내재되어 있는 리스크와 관련된 연구는 현재까지 미흡한 실정이다. 따라서 본 연구에서는 건설경영 전반에 내포된 리스크 요인들을 규명하여 코드화된 체크리스트를 제시하고, 원도급 건설업체 경영진을 대상으로 한 설문분석을 통해 각 항목의 정량화된 중요도를 도출하였다. 또한 항목별 가중치를 고려하여 위험도를 분석함으로써, 건설경영 리스크 요인의 위험순위 및 위험등급을 평가하였다.

건설기업의 전사적 리스크 관리 체계 적용을 위한 고려 사항 및 추진 방안에 대한 연구 (A Study of Considerations and Way to promote Enterprise Risk Management in Construction Company)

  • 김승원;이재호;유정호;김창덕
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.539-544
    • /
    • 2007
  • 최근 건설 산업은 경제성장에 따른 사회적 욕구의 다양화와 이로 인한 수요의 증대로 인하여 점차 다양화, 복잡화, 거대화되는 추세이다. 이는 기존의 건설사업의 운영으로는 감당하기 어려운 환경으로 변화하고 있음을 의미한다. 건설 산업에 내재된 불확실성과 위험요인을 체계적으로 관리하고자 하는 움직임이 대형 건설 회사들을 중심으로 나타나기 시작하였고, 특히 일부 대형 건설 회사들은 본격적인 건설사업 리스크 관리기법 도입 및 개발을 적극추진하고 있다. 이에 개별적으로 행해오던 리스크 관리를 넘어서 기업이 직면한 다양한 위험들을 전사적인 시각에서 통합하여 하나의 리스크 포트폴리오로 인식, 관리하는 새로운 리스크 관리 방식인 전사적 리스크 관리(Enterprise Risk Management)시스템이 두각 되기 시작하였다. 이에 본 연구는 전사적 리스크 관리를 건설 분야에 적용시키기 위한 첫 번째 단계료 ERM에 대한 건설 기업의 인식수준과 현 실태를 분석하고 건설 분야에서의 리스크 특성을 고려한 ERM 기본 모형을 제시하고자 한다.

  • PDF

플랜트 건설 리스크 분석 및 리스크 정량화 모델 개발에 관한 연구 (Risk Factors Analysis and Quantitative Risk Assessment Model for Plant Construction Project)

  • 안성진;김태희;남경용;김지명
    • 한국건축시공학회지
    • /
    • 제19권1호
    • /
    • pp.77-86
    • /
    • 2019
  • 플랜트 건설 프로젝트에 대한 수요가 증가하고 복잡해짐에 따라 예기치 못한 위험 요소가 증가하고 있다. 이에 플랜트 건설 프로젝트에 대한 중점 리스크 요인을 바탕으로 정량적 리스크 분석 및 평가 모델 개발이 요구되고 있다. 본 연구는 보험 회사에서 수집 한 보험금 지급 데이터를 사용하여 플랜트 건설 프로젝트의 실제 재정적 손실을 위험 평가 모델의 종속 변수로 반영하였으며 문헌 검토 및 데이터 분석을 바탕으로, 지형, 시운전, 공정률, 총 공시비 및 총 공사기간을 독립변수로 채택하였다. 제안된 손실율 모델은 플랜트 프로젝트 리스크 분석과 시공/시운전 단계의 리스크 분석가이드라인으로 활용될 수 있다.

건설공사 안전관리를 위한 고위험 공종 선정에 관한 연구 (A Study on the Selection of High-Risk Construction Types for Safety Management on Construction Projects)

  • 양진국;이기훈;이상범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.137-138
    • /
    • 2022
  • Construction work has potential risk factors in the process. Therefore, the safety management task is very important and requires continuous management. In particular, the importance of safety management in construction projects has been highlighted recently with the introduction of the act on punishment of serious disasters. In this perspective, this study intends to select and present high-risk construction types that requires safety management. The presented result is expected to present standards for systematically performing safety management of construction projects.

  • PDF