• Title/Summary/Keyword: construction risk

Search Result 1,887, Processing Time 0.029 seconds

Identifying Potential Opportunities of BIM for Construction Risk Management (BIM을 이용한 건설리스크 해결 가능성 도출)

  • Won, Jongsung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.201-202
    • /
    • 2019
  • This paper aimed to identify potential opportunities of building information modeling (BIM) utilization for construction risk management. Construction risk factors and BIM functions were derived through conducting in-depth literature review. Nineteen construction risk factors could be resolved by various BIM functions. Phase planning, site analysis, design authoring, and 3D design coordination were identified as the most efficient BIM functions for construction risk management.

  • PDF

Analysis of Construction-phase Risk Factors for SMEs' Advance into the Overseas Plant Construction Projects

  • Park, Moonsun;Lee, Kyosun
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.328-331
    • /
    • 2017
  • The purpose of this study is to derive construction-phase risk factors in SMEs' advance into overseas plant construction projects. For this, construction-phase risk factors were investigated on the basis of the analysis of Korean construction companies, overseas plant industry-related research institutes, and overseas data. In addition, major risk factors were derived from the investigated construction-phase risk factors, and quantitative risk factors and qualitative risk factors were analyzed and derived from these major risk factors, by the use of three rounds of the Delphi analysis.

  • PDF

Risk Factors Analysis and Quantitative Risk Assessment Model for Tunnel Construction Project (터널 건설 프로젝트 리스크 분석 및 리스크 정량화 모델 개발에 관한 연구)

  • Jeong, Seung-A;Ahn, Sungjin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.363-364
    • /
    • 2023
  • The tunnel construction projects is demanded more efficient risk management measures and loss forecasts to prepare for risk losses from an increase in the trend of tunnel construction. This study aims to analyze the risk factors that caused the loss of material in actual tunnel construction and to develop a quantified predictive loss model, based on the past loss record of tunnel construction projects.

  • PDF

A Study on the Development of Risk Check List and Identification of Risk Factors for Survey in Road Construction (측량 분야의 리스크 식별을 위한 리스크 체크리스트 개발 -도로 공사를 중심으로-)

  • Kwak, Jun-Hwan;Park, Hyung-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.901-904
    • /
    • 2008
  • The purpose of this study is to identify the risk factors, analyze the risk factors and make a risk check list of survey in road construction. Generally. the risk management is consisted of 3 steps: risk identification, Risk analysis, Risk hedge. This study is focused on the identification of risk and analysis of risk. To identify the risk factors of survey, we used the specifications of road construction, law of survey, and check list of road construction. This study provides the risk check list of survey for road construction. This research was undertaken to analyze risk factors being determine by the FGI(Focus Group Interview) method with survey specialists.

  • PDF

The Development and Application of Schedule Management Tools in Building Construction (건설 공정리스크 관리도구 개발 및 활용방안)

  • Jung Woo-Joon;Yoon You-Sang;Suh Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.384-387
    • /
    • 2004
  • It is very important to manage the risk in building construction because construction process has too many internal risk compared with others. So construction managers need more developed risk management system than the Present. While the study for the solution and management of generated risk is comparatively enough, the effort to confirm the risk of construction phase on pre-construction phase haying an major effect on total duration, is insufficient. For supporting the schedule risk management of pre-construction, this study suggests the reclassified risk breakdown structure and the investigation form for advance preparations on pre-construction Phase, which help the Poorly experienced construction manager to make more correct decisions and efficiently to execute risk management.

  • PDF

A Basic Study on the Risk Assessment of Domestic Construction Companies (국내 건설업체의 위험성평가 실태조사 기초 연구)

  • Park, Hwan-Pyo;Han, Jae-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.240-241
    • /
    • 2019
  • Construction disasters have more distinctive characteristics than other industrial disasters. Since it is likely that construction disasters will spread to severe accidents, the accident mortality rate is very high compared to the disaster incidence rate. Therefore, the purpose of this study is to compare and analyze the operation status of construction risk assessment by domestic large and medium sized construction companies to prepare improvement direction of risk assessment system. The survey results for safety management experts of construction companies are as follows: Large companies have developed and utilized risk assessment systems in their respective companies, while small and medium construction companies have developed and evaluated risk factors through the Excel program. Rather than performing risk assessment tasks based on historical safety accident data, construction companies have limitations in developing risk factors and preparing solutions with suppliers for each major construction. Therefore, it is necessary to prepare a risk assessment system in the future by analyzing the types of safety accidents, such as the safety accident data of each company as well as the safety accident data.

  • PDF

A MODEL OF RISK MANAGEMENT PLAN AND SYSTEM FOR THE CONSTRUCTION PHASE

  • Seon-Gyoo Kim;Chan-Jeong Park ;Moon-Serk Yang;Jin-Bong Kim ;Hyung-John Shin
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.341-346
    • /
    • 2005
  • After the IMF shock, some major construction companies in Korea have been motivated to avoid and mitigate various risk factors which could be critical and catastrophic events to corporate revenue and organization internally or externally. It means that they are trying to introduce and set up a risk management plan and system suitable to their organization and culture. L construction co. ltd. is one of major construction companies that have been searching methodologies or technologies to manage various risk factors surrounding corporate marketing and project operation. This paper presents an unique approach to develop a model of risk management plan and system suitable to L construction itself focused on the construction phase.

  • PDF

Construction Risk Assessment Methodology Using Site Risk Influence Factors (건설현장 위험영향요소 기반의 위험도 산정 방법론)

  • Lee, Hyun-Soo;Kim, Hyun-Soo;Park, Moon-Seo;Lee, Kwang-Pyo;Lee, Sa-Bum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.117-126
    • /
    • 2009
  • Many work-related risk factors can cause construction site hazards. Considering variable and changeable characteristics of construction site, risk of same trade can be different by combination of inherent characteristics. But established safety management has performed like other industries not reflecting characteristics of construction. So, to suggest risk assessment methodology considering risk influence factors in construction site, this study extracts risk influence factors by literature reviews and surveys, builds the weighting system for classification of factors. And risk of trade is calculated based on frequency and severity of risk. Risk assessment methodology is suggested by integrating risk influence factors and risk of trade. From this, risk considering the conditions of construction sites can be derived and based on the derived risk, safety management can be performed more effectively. This study has meaning for assessing the risk which can reflect characteristics of construction site considering risk influence factors.

Risk Analysis of Lifting Work for Risk Assessment of Modular Construction (모듈러 건축 현장의 위험성평가를 위한 양중작업 위험요소 분석)

  • Jun, Young-HUN;Kim, Kyoon-Tai;Jeon, Eun-Bi
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.291-292
    • /
    • 2021
  • In modular construction, it is insufficient for safety management of workers, and workers are still exposed to the risk of accidents due to work at high places for lifting and assembly work in modular construction sites. Therefore, it is necessary when preventive safety management through risk management of workers on modular construction sites. This study is a basic study for the risk assessment(checklist) of modular construction, and the purpose of this study is to analyze the risk factors of the module lifting work at the modular construction site. It is intended to identify the hazard risk factors and improvement measures of the existing lifting operation, by analyzing the case of the risk assessment of the existing RC method, and to identify the risk factors for each work process when lifting the module. In the future, the results of this study are expected to be utilized in the development of checklists for risk assessment as safety management plan for modular construction sites.

  • PDF

Risk Management for Preventing Workers' Deaths in Construction Machinery Work (건설기계작업 사망사고 예방을 위한 위험관리)

  • Yang, Seungsoo;Paik, Shinwon
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.3
    • /
    • pp.16-23
    • /
    • 2020
  • The use of construction machinery has been increasing every year due to the large scale, high-rise and lack of workers in construction work. On the other hand, deaths are on the rise every year due to inadequate risk management for construction machinery work. In addition, the number of deaths caused by the lack of signals or insufficient signals during construction machinery work is increasing rapidly, and it is deemed necessary to analyze the actual conditions and take countermeasures. Therefore this study has developed the Strength Risk Index (SRI) based on the Frequency Risk Index (FRI) and the 5W1H by analyzing in-depth deaths caused by construction machinery over the past five years. The risk index (RI) was assessed using the frequency and strength risk index derived to determine whether it is acceptable (acceptable risk < 0.25 ≦ unacceptable risk) and the risk assessment method for reducing risk was proposed by applying 3E (Engineering, Education, Enforcement) measures for each level of risk for unacceptable risk. It also proposed measures to improve the system, such as requirements for signal numbers, mandatory placement standards, and mandatory installation of side and rear monitoring cameras, as measures for accidents caused by failure to deploy signals or insufficient signals, which account for the highest proportion of deaths among construction machinery operators and workers.