• Title/Summary/Keyword: construction project performance management

Search Result 740, Processing Time 0.024 seconds

A Study on the Present condition Investigation and Analysis of Educational Facilities Maintenance (교육시설 유지관리 현황조사 및 분석)

  • You, Young-Hun;Lee, Eun-Dong;Cho, Chang-Yeon;Kim, Jae-On;Son, Jae-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.361-366
    • /
    • 2006
  • As time goes by, educational facilities have become superannuated and damaged; therefore, performance and safety of buildings have been decreased. It causes the decrease of service quality and deterioration of educational environment. In order to protect facilities from serious damages and deterioration, a consistent maintenance and repair program is required. The educational facilities can keep the good educational environments and also make better environments through the program. This study is made by investigating and analyzing the maintenance data which was collected from fifty schools in Asan area, Chungchengnam-do in order to derive foundation data for the efficient educational environment maintenance program.

  • PDF

A case study on the selection process of cutoff wall for ground-water using VE/LCC analysis (VE/LCC 기법을 활용한 차수공법 선정사례 연구)

  • Cho Yong-Wan;Chang Jun-Ho;Kim Jin-Man;Ha Jae-In
    • 기술발표회
    • /
    • s.2006
    • /
    • pp.279-291
    • /
    • 2006
  • This study shows decision-making process for selection of cutoff wall on a wastewater treatment project. There are 10 different cut-off wall methods So, we examine the site to gather information for find appropriate methods. After using that information, 10 cutoff wall methods are reviewed for analysis. Through brainstorming, four alternatives are selected for design VE item. Following the standard VE process, we established performance criteria and evaluated function score(F) using questionnaire. The questionnaires, brainstorming and AHP method for weighting on performance criteria and evaluate function score increased the reliability of this selection process. Water Jet method, one of four methods, has the best function score(F=92.71) and the lease construction cost(as cost index 1,000). The value score also highest as 92.7, so we select the method. The result is value innovation type In addition, the authors try to calculate the environmental burden in selection process using LCA. We cannot conduct the full LCA as defined ISO, so perform Simple LCA In LCA result, the cut-off grouting has the least environmental burden as index 9.09E+01 and Water Jet method has following as the second. To selection best method to specific area and purpose, design VE/LCG process used as useful tool and it is needed to develop integrated method that evaluate VEILCC and LCA as one-set process.

  • PDF

Development of an Automated Gangform Climbing System for Apartment Housing Construction - Structural Stability and Tower Crane Lifting Load Analysis - (공동주택 전용 갱폼 인양 자동화 기술의 개발 - 구조적 안정성 및 타워크레인 양중부하 분석 -)

  • Lee, Jeong-Ho;Yang, Sang-Hoon;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.48-59
    • /
    • 2012
  • Gangform, compared to the traditional forms, is a systemized form which can reduce construction duration and cost by the advantage of using it repeatedly. However, transportation and climbing process of the Gangform is highly dependant on the performance of tower crane. Gangform climbing process takes one day out of six to seven days of a structural work cycle. Tower cranes can not be used in other lifting works when they lift the Gangform during the structural work cycle, causing the delay in the construction project. Numerous efforts and researches have been done in domestic and international industry to solve such limitations of Gangform climbing process. Especially, "A Study on the Development of Automatic Gangform Climbing System for Apartment Housing Construction"has suggested a conceptual model which can climb the Gangform system without a tower crane. In this paper, the technical and economical feasibilities of previously proposed Automatic Gangform climbing system are examined by evaluating its structural stability and lifting load reduction effect.

A study on the Construction Claims Between Parties Without Privity (국내 건설분쟁에서 비계약 당사자간의 건설분쟁에 관한 연구)

  • Yun Dae-Jung;Han Sung-Heon;Paek Joon-Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.300-305
    • /
    • 2002
  • The construction project is a complex undertaking involving multiple participants. Conflicts are inherently natural in the construction projects and subsequently, a success of projects mainly depends on how well to cope with the conflicts. In the past, courts usually took the position that the professional's exposure in damages for negligent performance of any of his/her duties would not extend to strangers to the contractual arrangement. However, courts today generally reject that rationale which was earlier in vogue and protect architects, engineers, and contractors from being liable to third parties. It means that the lack of privity of contract could rarely protect a profession in a suit alleging the negligence or professional malpractice in preparing plans or specifications. The main goal of this paper is to enhance the understanding of the legal aspect of privity and to provide the trend of no-privity disputes through the analysis of lawsuit cases during the last 40 years. On the base of the analysis, importance of the third relationship and the liability in construction disputes is presented.

  • PDF

The Private-Initiated Park Development Project in Terms of Securing Publicity Operation Characteristics Analysis - Busan Metropolitan City as a Case - (공공성 확보측면에서 민간공원특례사업 운영특성분석 - "부산광역시를 사례로" -)

  • Gweon, Young-Dal;Park, Hyun-Bin;Kim, Dong-Pil
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.51 no.1
    • /
    • pp.13-28
    • /
    • 2023
  • This study examines the process of project promotion in Busan, which introduced the private participation-type consultative body for the first time in the country in the promotion stage of the private-initiated park development project, and introduced flexible application of the system and differentiated policy elements in the implementation process, and examines the operational characteristics and we tried to analyze performance, etc. As a result of the analysis, first, the preferred bidder was selected by introducing a mixed method in the project method, which is an independent project method that cannot be seen in other local governments. Second, by specifying guidelines considering the characteristics of each park and detailed guidelines such as the location, area, and maximum height of non-park facilities, criteria for establishing a rational development plan utilizing regional identity and the basis of evaluation standards were laid. Third, in the project process, transparency was secured through the delegation-type roundtable, in which the private sector performs the functions and roles of key actors, thereby preventing disputes such as suspicion of preferential treatment. Fourth, in order to improve the quality of park facilities to be donated and to secure design adequacy, after approval of the implementation plan, a general planner was introduced and construction project management (design stage) services were performed to promote efficient implementation and specialization of luxury parks in the region. As a result, the city of Busan carried out the project efficiently by conserving 5 parks from sunset, a park area of 2.25km2, and reducing land compensation and park construction costs by KRW 740 billion. Reinforcement of the public nature of the private-initiated park development project was suggested. However, due to the application of these systems and verification procedures, the project period is prolonged, and park services are delayed along with the financial burden on private operators.

A Study on the Design Value Analysis Methodology for Bridge Structure Using Reliability Analysis (신뢰성 해석을 이용한 교량구조물의 설계VA기법 연구)

  • Kim, Seong-Il;Lee, Kwang-Mo;Choi, Suk-Won;Jung, Jun-Hwa;Kim, Seong-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.114-125
    • /
    • 2009
  • In this study, a design value analysis technique that considered stochastic LCC and stochastic performance evaluation was proposed, and by introducing the concept of reliability analysis, a decision making that secured reliability was supported. The results of this study, which was carried out according to the above objectives and methods, are summarized as follows: 1) The design value analysis procedures and value state function, improved in order to carry out a reliable analysis when evaluating alternate proposals that were extracted after the function definition was complete, were formalized, and in order to secure consistency and efficiency for value evaluation procedures, an evaluation index scheme was proposed; 2) Database collection and analysis were done for a bridge's LCC analysis. As for the collection scope of data, literature of previous research done on a bridge's LCC analysis was used as the basis for analysis, and for securing reliability regarding analysis results and dealing with uncertainty of collected data, the MCS technique was applied; 3) Weights and evaluation ranks for performance evaluation of each of the alternate proposals, as well as LCC analysis model, analysis period, discount rate, user expense, safety inspection and safety diagnosis expense conditions for LCC analysis were proposed. Lastly, a feasibility study was done and conclusion was made about "OO grand bridge and connecting road construction work execution design" project centered on value analysis execution case.

Critical Success Factors for Wind Power Projects (풍력 발전소 프로젝트의 핵심성공요인)

  • Lyou, An-Suck;Kim, Byung-Il;Kim, Hyoung-Kwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.140-147
    • /
    • 2012
  • Climate changes caused by fossil fuel energy usages have led to serious environmental damages and resource scarcity. Ever-increasing demand for energy causes harsh competition in international energy markets. Nuclear power, which once was regarded as a desirable clean energy, began to face public oppositions after the Japanese nuclear disaster in 2011. In this context, wind power is now considered to be an ever-more important recyclable energy source. Thus, this study intended to identify critical success factors for wind power construction projects. After a thorough literature review, two focus group interview sessions were conducted. A questionnaire-based survey, coupled with the two previous methods, resulted in the extraction of important factors for the success of wind power projects. Experts, including those working as constructors, designers, and owners, were paid a direct visit for the interview and survey. The critical success factors were categorized into feasibility study, right policies, equipment selection, and project financing issues. The proposed critical success factors are expected to be an effective guideline for future investors in wind powers.

The Influence Analysis of Value Engineering for the Public Empoyer's Decision Marking - Focused on the Project Life Cycle - (공공발주자 의사결정에 미치는 가치공학(VE)의 영향력 분석 - 프로젝트 생애주기를 중심으로 -)

  • Park, Jongsoon;Chun, Jaeyoul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.12-20
    • /
    • 2015
  • The public employers are faced the mounting importance of decision process to settle the optimum VE delivery system of such public facilities buildings and etc. The elements of decision process of the public employer are formed in the various relationships of the concerned and when the projects are coming into effect, the decision process in the VE delivery method and the selection of contractor will be the name of the game. The decision process in the VE delivery method and the selection of contractor are created a case to be one and the same as well as initiates a consistency for the performance. However, the function and role of the public employer are projective accordingly to the organization of employer and the employer especially no system is equal to the capability of perfect evaluation and verification of the ability of the employer. Especially the lowest bidder policy that started with justification to increase the competitiveness and technical capability of the contractors through the completion in between contractors has been providing the hotbed for insolvency, irregularity and irrationality as a result. From this point of view it is declared that the buildup the edifice of supporting system in the process of decision to recover the mutual trust and respect of the concerned in the VE delivery system with the technostress and the systematization based on drawing the elements which affect the decision process of public employer.

Development of Mongolian Numerical Weather Prediction System (MNWPS) Based on Cluster System (클러스터 기반의 몽골기상청 수치예보시스템 개발)

  • Lee, Yong Hee;Chang, Dong-Eon;Cho, Chun-Ho;Ahn, Kwang-Deuk;Chung, Hyo-Sang;Gomboluudev, P.
    • Atmosphere
    • /
    • v.15 no.1
    • /
    • pp.35-46
    • /
    • 2005
  • Today, the outreach of National Meteorological Service such as PC cluster based Numerical Weather Prediction (NWP) technique is vigorous in the world wide. In this regard, WMO (World Meteorological Organization) asked KMA (Korea Meteorological Administration) to formulate a regional project, which cover most of RA II members, using similar technical system with KMA's. In that sense, Meteorological Research Institute (METRI) in KMA developed Mongolian NWP System (MNWPS) based on PC cluster and transferred the technology to Weather Service Center in Mongolia. The hybrid parallel algorithm and channel bonding technique were adopted to cut cost and showed 41% faster performance than single MPI (Message Passing Interface) approach. The cluster technique of Beowulf type was also adopted for convenient management and saving resources. The Linux based free operating system provide very cost effective solution for operating multi-nodes. Additionally, the GNU software provide many tools, utilities and applications for construction and management of a cluster. A flash flood event happened in Mongolia (2 September 2003) was selected for test run, and MNWPS successfully simulated the event with initial and boundary condition from Global Data Assimilation and Prediction System (GDAPS) of KMA. Now, the cluster based NWP System in Mongolia has been operated for local prediction around the region and provided various auxiliary charts.

Analysis of key performance indicator for smart HACCP (스마트 HACCP 핵심 성과지표 분석)

  • Seo, Yeon-Beom;Park, Jung-Il;Go, Ji-Hun;Lee, Je-Myung;Hwang, Su-Jin
    • Food Science and Industry
    • /
    • v.54 no.2
    • /
    • pp.73-81
    • /
    • 2021
  • Korea Agency of HACCP Accreditation and Services(KAHAS) has been focused on strengthen food safety management and competitiveness of the food industry. As a solution, the institution has launched the smart HACCP project, which is highly praised to be an innovation in food safety management system. KAHAS try to analysis of food manufacturing company, candidate of supporting about construction of smart factory from Small and Medium venture Business Department and confirm the effect of smart HACCP introduction. Korea Agency of HACCP Accreditation and Services will use these results for widespread of smart HACCP