A Study on Method Activation of Construction Management through Investigation of Public Owners' Capability level (공공부문의 발주자 역량 수준 조사를 통한 건설사업관리 활성화 방안 연구)

  • Kim, Sun-Sik;Kim, Ju-Hyun;Lee, Yun-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.289-294
    • /
    • 2007
  • It has been 10 years Since December 1996 when CM method was institutionalized by Construction Industry Fundamental law. Even though construction market has been in stagnant of business activities till now, CM in Korea started to be activated by the introduction of CM method i.n public construction. In the end of 2005, the number of CM order's contract is 6.7 times , an amount of CM order's money is 9.2 times more than operation plan of CM system announced in 2001. Therefore, CM market has been dramatically growing. However, it is judged that the shortage of faith in CM project and necessity of CM method are not recognized and study on a owner who affects successful settlement of CM has not been performed. When considering those points, in introduction and practical use of CM, CM is suggested to the field which is necessary for a client through the task performance level research and analysis of a owner who act a important role to activate Construction Management. As result of studying pre-existing papers to i.nvestigate of owner's capability level, the task function of a client is classified into 10 types and a public opinion poll was performed based on the 10 types of function.

  • PDF

Research on ITB Contract Terms Classification Model for Risk Management in EPC Projects: Deep Learning-Based PLM Ensemble Techniques (EPC 프로젝트의 위험 관리를 위한 ITB 문서 조항 분류 모델 연구: 딥러닝 기반 PLM 앙상블 기법 활용)

  • Hyunsang Lee;Wonseok Lee;Bogeun Jo;Heejun Lee;Sangjin Oh;Sangwoo You;Maru Nam;Hyunsik Lee
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.12 no.11
    • /
    • pp.471-480
    • /
    • 2023
  • The Korean construction order volume in South Korea grew significantly from 91.3 trillion won in public orders in 2013 to a total of 212 trillion won in 2021, particularly in the private sector. As the size of the domestic and overseas markets grew, the scale and complexity of EPC (Engineering, Procurement, Construction) projects increased, and risk management of project management and ITB (Invitation to Bid) documents became a critical issue. The time granted to actual construction companies in the bidding process following the EPC project award is not only limited, but also extremely challenging to review all the risk terms in the ITB document due to manpower and cost issues. Previous research attempted to categorize the risk terms in EPC contract documents and detect them based on AI, but there were limitations to practical use due to problems related to data, such as the limit of labeled data utilization and class imbalance. Therefore, this study aims to develop an AI model that can categorize the contract terms based on the FIDIC Yellow 2017(Federation Internationale Des Ingenieurs-Conseils Contract terms) standard in detail, rather than defining and classifying risk terms like previous research. A multi-text classification function is necessary because the contract terms that need to be reviewed in detail may vary depending on the scale and type of the project. To enhance the performance of the multi-text classification model, we developed the ELECTRA PLM (Pre-trained Language Model) capable of efficiently learning the context of text data from the pre-training stage, and conducted a four-step experiment to validate the performance of the model. As a result, the ensemble version of the self-developed ITB-ELECTRA model and Legal-BERT achieved the best performance with a weighted average F1-Score of 76% in the classification of 57 contract terms.

Policy Direction in Responses to Demand for Apartment Remodeling (공동주택 리모델링 수요에 대응한 정책 추진방안)

  • Lee, Yeo-Kyung;Kim, Eun-Hee
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.36 no.1
    • /
    • pp.125-136
    • /
    • 2020
  • This study aims to seek a proper policy direction in response to the demand for apartment remodeling. As the research methods, we diagnosed the current status of the remodeling policy and analyzed the demand for apartment remodeling nationwide. According to the result of analysis, we suggested the fundamental direction and tasks for remodeling policies to be pursued at the government level. The results of the study are summarized as follows. First, the result of analysis showed that the demand for environmental improvement(performance improvement) remodeling project was much higher than other types of remodeling projects. The percentage of unit increased-type remodeling that can secure business feasibility is about 10% and only 30% when it comes to reducing project costs. The remaining 70-90% need to be promoted in environmental improvement remodeling projects which dependent on the residents' payment. Second, in order to prepare a policy action plan in response to the demand for apartment remodeling, it is necessary to set up clear policy goals and strategies for apartment remodeling in advance at the national level. Along with proactive goals and strategies, graded policy support should be accompanied per type of remodeling and business demand. We also suggest to simplify administrative procedures and support the R&D research to develop technologies. It would help to utilize the unit increased-type remodeling. On the other hand, for utilizing the environmental improvement remodeling which takes up a relatively high proportion, the policy should take care of as follows: offering housing performance information, rationalizing long term repair reserve, fostering small companies and experts. Finally, apartment management system should be advanced from the perspectives of managing old apartments and institutional foundations such as new construction and customized regulations for differentiated remodeling should be accompanied.

A Study on General Contractors' Control Measures for Construction Cost Overrun (종합건설사 현장의 원가초과 억제 방안 분석에 관한 연구)

  • Park, Jee Young;Kim, Hyeon Jin;Kim, Han Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.3
    • /
    • pp.27-36
    • /
    • 2024
  • The effective control of cost overrun is a crucial issue for construction companies to secure profitability. Especially in situations where cost pressures are significant due to factors such as rising raw material prices and increased financial costs due to high-interest rate policies, cost overruns resulting from project failures have a highly detrimental impact on the profitability of construction firms. The objective of this study is to analyze the current status of cost overrun control measures adopted by construction companies using the IPA technique and provide key characteristics and implications. The IPA analysis results showed that practitioners in general contractors exhibit a high level of interest and effort regarding cost overrun while the performance level is relatively low. Nevertheless, the measures considered important to control cost overruns generally show a high tendency for execution as well. Cost overrun control measures that show high importance but low execution are primarily related to collaboration and communication sectors. To effectively control cost overruns, enhancing collaboration and communication with construction supervisors/CM, headquarters, and regulatory authorities emerged as the most urgent need. Through this study, the current status and areas for improvement regarding cost overrun control measures in general contractors can be identified. This can be valuable for deriving directions and enhancements for future cost overrun control strategy development.

Analysis of the settlement of Pusan New Port construction site using the settlement prediction methods (침하예측방법들을 이용한 부산신항만 현장 침하 분석)

  • Park, Hyun-Il;Kim, Ha-Young
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.1202-1205
    • /
    • 2009
  • Embankment preloading, in conjunction with prefabricated vertical (PV) drains, was used to accelerate consolidation of marine clays in Pusan New Harbour project. UP to eightteen settlement plates were installed at the ground reclamated site under the embankment fill to monitor the preload performance. This analysis is carried out by five settlement prediction methods including the Asaoka, Hyperbolic, Hoshino, and back-analysis method based on optimization. The field settlement data can be analysed by settlement prediction methods to predict the ultimate settlement and the degree of consolidation of the reclaimed land under charge fill. The authors compared with the analyzed results of the methods.

  • PDF

Development of Metric-Based Two-Tier Work Force Strategy (성과극대화를 위한 기능인력의 육성 및 활용전략)

  • Chang Soon-Woong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.73-81
    • /
    • 2003
  • The construction industry has been experiencing a major challenge in its work force, 'the shortage of skilled craft workers.' This problem has been caused by several factors such as the poor image of the construction industry, lack of training and education, unclear career path, declining wages, and changing work force demographics. A 'step-change' approach called the 'Two-Tier Work Force Strategy' has been proposed by the Center for Construction Industry Studies (CCIS) to deal with the work force related issues in a radical way. It is composed of two separate strategies, Tier I and II. The Tier I strategy uses less skilled and task trained craft workers, and has a larger administrative site management team than the Tier II strategy. The Tier II strategy utilizes fewer, better-educated, and higher skilled workers who perform some lower-management functions in addition to craft functions. They are paid more, but produce more through higher skills, stay on the job longer through multi-skilling, and deliver improved project performance in safety, quality, schedule, and cost The Two-Tier Work Force Strategy has the potential to resolve the current work force problems and foster a better work force environment in the future.

  • PDF

A Scheduling Method Of Dismantling Work Considering Specific Condition Of Remodeling Project - Focused on Old Aged Apartment House with Wall-Slab Structure - (리모델링의 특성을 반영한 철거공사의 공정계획 수립방안 - 벽식구조 노후 공동주택을 대상으로 -)

  • Kang, Sa-Yil;Hwang, Young-Kyu;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.104-115
    • /
    • 2008
  • Currently, reconstruction and remodeling are conducted to improve the performance of aged housing. Recently reconstruction has caused many problems such as wastes generation, wasting resources and real estate speculation, remodeling is drawing attention. Accordingly, remodeling business for aged housings gradually increasing, but the use of scheduling method not considering characteristics of remodeling deters construction in some construction types. Especially, in case of dismantling construction, the dismantling is delayed since the scheduling method not considering characteristics of remodeling is used. In case of remodeling, dismantling construction is ahead of other processes, if the dismantling construction is delayed, whole construction will be delayed and if speedy construction is conducted, the costs for remodeling will increase. Furthermore, existing remodeling for aged housing has been for rahmen(crossbeam and pillar) structure apartments, but since most apartments to be remodeled are wall-slab structure where dismantling takes a lot of weight, it is highly possible the dismantling construction is delayed. Thus, this paper is to establish scheduling method for the dismantling construction reflecting characteristic of remodeling to prevent delay of dismantling construction for remodeling of aged housing with wall-slab structure.

A Study on Development of BIM-based Asset Management Model for Maintenance of the Bridge (교량의 유지관리를 위한 BIM기반 자산관리 모델 개발에 관한 연구)

  • Kang, Jong-Min;Lee, Dong-Youl;Park, Jong-Bum;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.3-11
    • /
    • 2012
  • The most of domestic bridge has an used life under 30 years, Future maintenance budgets can be expected to increase. However, because of bridge maintenance budgets are limited, demand for asset management being performed to achieve required performance within available budget is increasing. To perform effective asset management of bridges should be made the best use of information to occur in all phase of construction project. Therefore, the development of system and DB is required to support asset management by effective information management. The objective of this study is the development of the BIM-based bridge asset management model. Through previous research survey, BIM capabilities and asset management components were established and mutual linkages were examined. Bridge asset management model was composed of alternate assessment model. In addition, BIM-based asset management model was performed case studies to verify feasibility and applicability. The proposed model can be applied to a current bridge maintenance procedures and supported to perform effective bridge maintenance tasks within a limited budget.

Development of Management Systems based on IDEF3 Modeling to Improve Owner's Competency of Implementing Green building Certification (친환경건축물인증 발주자업무 수행역량 제고를 위한 IDEF3 모델기반 관리체계 구축)

  • Park, Kyung-Rog;Yi, June-Seong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.52-62
    • /
    • 2013
  • Owners' efforts to acquire Green building certification, which started in 2002, have been rapidly increasing since 2006. The causes of the increased owners' interests are due to various incentives, legal obligation, and purpose of advertising. As project owners generally are deficient in capabilities and knowledge on how to deal with administrative works on certification, they tend to fulfill the minimum requirements for certification. However, effective administration process need capabilities of identifying individual making decision point and review information. The implementation of green building certification system is expected to provide comfort to both occupants and potential users. Furthermore it contributes to reducing energy costs throughout the phase of O&M. In addition, technology innovation in green industry can be obtained. Therefore, this study is intended to support owners in order that they can clarify certification tasks and make a rational decision-making in time. For this purpose, first of all, the major decision points were selected as the gateways of green building certification process. And then management system based on IDEF3 modeling was developed for supporting owners' decision-making performance. This management system will improve owners' overall capacity in handling all the tasks regarding the certification of Green building.

Real-Time Construction Resource Monitoring using RFID/USN Inter-working System (RFID/USN 연동 시스템을 활용한 건설자원 실시간 모니터링 시스템)

  • Ryu, Jeoung-Pil;Kim, Hyoung-Kwan;Kim, Chang-Yoon;Kim, Chang-Wan;Han, Seung-Heon;Kim, Moon-Kyum
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.90-94
    • /
    • 2007
  • Location tracking automation of resources in construction industry is one of the most important procedures to improve construction project performance and reduce the period of construction. Recently, location tracking technologies have proven to be effective in tracking construction materials and equipment in real time through the instrumentality of RFID (Radio Frequency Identification). By using wireless communication and inter-working system between RFID and USN, it is possible that construction engineers receive the location information of construction resources without additional efforts that move the RFID reader to read tags periodically. In the inter-working system, RFID reader delivers the acquired materials information to sensor node which is connected by serial interface. Then sensor node transmits the received data to the data aggregation terminal that is a sink node. The data aggregation terminal can transmit collected data to construction manager who is out of construction site using infrastructure such as CDMA(Code Division Multiple Access) network. The combination model of the two system and field test scenarios are presented in this paper.