• Title/Summary/Keyword: construction project performance management

Search Result 740, Processing Time 0.027 seconds

Dynamic Modeling of Building Services Projects: A Simulation Model for Real-Life Hospital Project

  • Abhishek, V.;Jagadeesh, P.
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.3
    • /
    • pp.35-41
    • /
    • 2013
  • All infrastructure projects are said to be inter-dependent, uncertain and labour-intensive in nature. There is no exception for building services sub sector. For a real time project such as 'The construction, extension and refurbishment of Employees' State Insurance Corporation (ESIC) Hospital at Tirupathy, India with total area of 45,000 square feet at an estimated cost of 1100 million rupees, a generic process model is developed to simulate the effect of set of identified variables on construction project. The 'Stocks and Flows' of dynamic model affords relevant insights to project managers, who apply this knowledge when designing better performance through more appropriate project planning. It is concluded from the model-based approach that building services works can be improved through specific better focussed managerial efforts, such as an increasing coordination effectiveness at the planning stage, clarifying prerequisite conditions prior to installations. Otherwise, pending works arising from work clashes can lead to knock-on effects resulting in productivity constraints and pressures, as well as more rework and demolition. Current study reveals that the model enables deep insight into various interdependent processes, their by improving construction performance levels, by addressing the dynamics of design errors and defective works, and recovering delayed schedule.

Requirement Analysis for Development of EVMS in Nuclear Power Plant (원전건설 성과관리시스템(EVMS) 개발을 위한 요건 분석)

  • Won, Seo-Kyung;Park, Weon-Seob;Chong, Young-Whan;Kim, Jae-Yong;Kim, Yun-Myung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.271-272
    • /
    • 2013
  • The Korean nuclear industry acquired technology for each construction stage including engineering, procurement, construction and commissioning from advanced nuclear countries. While the levels of technology and quality have greatly improved, the same cannot be said for the level of project management. In particular, the level of project performance measurement and forecasting project risk still remain at the single project management level. Thus, this paper reviewed the concept of the EVMS method and requirement for the system. The adoption of the EVMS, an advanced project management method, can enable efficient management of project risks and promote an adequate environment for project implementation.

  • PDF

Analyzing the Relationship between Construction Planning and Project Performance (설비공사 계획업무와 프로젝트 성과와의 상관관계에 관한 연구)

  • Kim, Dae Yong;Jeon, Min Chang;Kim, Se Bum;Lee, Sang Bum
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.208-209
    • /
    • 2015
  • Recently, mechanical and electrical construction are getting more important because of technology advances. In particular, construction market has become more competitive and construction requires more complicated and sophisticated works. Despite its importance, relatively little studies on construction management for mechanical construction and electrical construction. Therefore, this study conducted an analysis to identify the relationship between construction planning and project performance. For the analysis a number of mechanical professionals were participated. Ultimately, the study will provide a foundation of effective construction management for mechanical construction.

  • PDF

Strategies for Facilitating Post-Construction Evaluation and Management System (건설공사 사후평가 제도 활성화 방안 수립)

  • Lee, Kang-Wook
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.379-380
    • /
    • 2023
  • The Post-Construction Evaluation and Management System has been operated over the past 20 years not only to analyze the performance of large-scale construction projects, and but also to provide useful reference data for future similar projects. Although the Post-Construction Evaluation and Management Center has been legally designated and operated since 2020, various problems have been occurring in the operation of the system. Accordingly, this study proposes strategies for facilitating Post-Construction Evaluation and Management System in terms of the following three aspects: (1) improving the implementation rate of post-construction evaluation; (2) improving the information management system related to post-construction evaluation; (3) improving the utilization of post-construction evaluation outcomes. Based on the results of this study, a specific action plan will be prepared, which is expected to contribute to the efficiency of construction project performance management in the future.

  • PDF

Action to Improve the Reliability of Production Planning

  • Kim Daeyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.4 s.12
    • /
    • pp.139-144
    • /
    • 2002
  • Management of today's dynamic projects requires a shift of focus from product to process. The purpose of traditional project controls is to conform performance to plan. The purpose of lean project controls is to make the best possible choices at each point in time during the course of the project, as well as contributing knowledge to the parent organizations so they can learn from project experience. The Lean Construction Institute(LCI) proposed the Last Planner System(LPS) capable of accomplishing that purpose, principally through controlling the quality of planning and of management processes themselves, as distinct from concentrating exclusively on project performance. The case project was a pilot project for the implementation of the Last Planner. Consequently, the coordination of the work on this project was extremely successful. The project had its share of challenges. The coordination did not prevent design problems, or supplier errors, but helped the team deal with the problems effectively while maintaining the work flow. The last planner helped the contractors know: a) who will be doing what and where, b) what each one needs from the others, and c) what are the project priorities. The system itself created a more collaborative environment, because it 'demands' that the subcontractors address these issues.

A Risk Performance Measurement System for the Construction Project

  • Seon Gyoo Kim;Jin Bong Kim;Moon Serk Young;Bong Cheol Jeon;Han Kim;Young Jeong Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1591-1598
    • /
    • 2009
  • Recently, the researches on the urban regeneration projects have been performed very actively. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

  • PDF

Schedule Management for Green Building Projects in Singapore: Schedule Delay, Causal Factors and Solutions

  • Hwang, Bon-Gang;Zhao, Xianbo;Leong, Lay Peng
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.527-531
    • /
    • 2015
  • With the mounting concerns over environmental issues, green construction is gaining a place in the global construction industry. However, rare research has been conducted to analyze green construction projects, especially in the aspect of project schedule performance. As a result, this study aims to investigate the degree of project delay in green building construction, analyze the factors affecting schedule delay of green building projects, and finally provide recommendations to improve schedule performance of green building project. To achieve the objectives, a comprehensive literature review was carried out, followed by a survey conducted with 30 companies that provided data from 220 traditional and 96 green building projects. The analysis of the responses identified that 15.9% of the traditional building projects were delayed while 32.3% of the green building projects were completed behind schedule. Furthermore, the amount of the delays in green building projects was an average of 4.8% of their planned schedule. The top 5 critical factors that can cause delay in green building projects were identified as: (1) speed of decision-making by clients; (2) speed of decision-making involving all project teams; (3) communication/coordination between key parties; (4) level of experience of consultants; and (5) difficulties in contractors' project financing. Lastly, a list of recommendations was introduced, aiming to reduce schedule delay in green building construction projects based on the observations. This study will serve as s a base for further research on the enhancement of green building project schedule performance.

  • PDF

Quantitative Analysis of Magnitude of Rework by Project Types and Sources of Rework

  • Hwang, Bon-Gang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.202-211
    • /
    • 2006
  • Rework in the construction industry can adversely affect project cost and schedule performance. Based on direct rework costs recorded on 359 construction projects, this paper presents an assessment of the magnitude of rework by various types of projects and sources of rework. The results from this paper establish that on average 4.5% and 2.5% of actual construction costs were spent on rework for owner and contractor projects, respectively. Furthermore, this paper determines that the direct rework costs differ by project types and sources of rework. Finally, it permits the development of rework reduction initiatives. By quantifying and recognizing the different magnitude of rework, the industry can be aware of the waste from rework and develop effective plans for managing rework, ultimately improving project cost performance.

A Study of the Effect of PMC and Human Resource Competency on Construction Project Performance Outcomes (PMC (Project Management Consultant)와 인적자원역량이 건설프로젝트성과에 미치는 영향에 관한 연구)

  • Lee, Heonchang;Lee, Jeongryun;Ahn, Byeonghoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.5
    • /
    • pp.701-710
    • /
    • 2022
  • This study aims to prove the importance and necessity of a project management consultancy (PMC) that systematically manages construction projects to ensure their successful implementation. In order to analyze the interrelationship between the role of PMC and the outcome of the construction projects, structural equation modelling(SEM) was conducted. Hence, one of the critical aspects when conducting the project, human resource competency, especially referring to the competency of project team members and the project manager's leadership, affects the performance of construction projects. As a result of this study, PMC is found to have significant effects on human resource competency and construction project performance. In addition,human resource competency also had a significant effect on construction project performance. Consequently, the research outcomes suggest that introducing PMC services should be done when implementing large domestic infrastructure projects successfully, as doing so will enhance PM leadership and strengthen the capacity of the project team members.

PERFORMANCE EVALUATION FOR CONSTRUCTION VALUE ENGINEERING STUDY

  • Wei Tong Chen;Hong-Long Chen;Po-Yi Chang;Tsang-Jung Wang
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.347-352
    • /
    • 2005
  • This paper presents an evaluation model for the performance of Value Engineering Study (VES) for construction projects. The proposed model consists of 6 PEGs and 32 PEIs. The expertise of the proposed model was collected from VE experts in Taiwan using two-phase questionnaire survey. One real-life VES of construction projects was used to demonstrate how the proposed model works. The proposed model not only can be used by project owners to appraise the performance of VES team but also be used by the VES teams to conduct self-diagnosis, improvement, and motivation for achieving better performance. Additionally, the proposed model is capable of: (1) clarifying the defects of VES and avoiding committing same mistakes, (2) assisting inexperience team members to implement VES and catch the critical issues of a VES.