• 제목/요약/키워드: construction project management system

검색결과 1,505건 처리시간 0.036초

AN ONTOLOGY SCHEME FOR DISCRIMINATING CONSTRUCTION IETM FROM EXISTING INFORMATION SYSTEMS

  • Jeong, Jinwook;Park, Moonseo
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.942-948
    • /
    • 2009
  • Today's construction is a large-scale and long life span program, so called Mega-scale project, that every moment constructor faces much of hardships, It is because of a large amount of stakeholders, data and complicated relationship among workers. In order to overcome these problems, IETM(Interactive Electronic Technical Manual) has been introduced to construction industry recently, It is regarded as a useful tool for handling the data, procedures of the construction, but it is similar to existing IT-based information systems, the PMIS(Project Management Information System) and the KMS(Knowledge Management System), without characterizing. This research is intended to find out IETM's property and to present the Ontology scheme discriminating Construction IETM from existing systems..

  • PDF

PLM 기반의 건설프로세스 의사결정을 위한 협업관리체계 개발 (Collaboration Management Architecture of construction process for Decision Support based on PLM (Project Life-cycle Management))

  • 임형철;최철호;진상윤;김재준;이광명;윤수원
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2007년도 정기 학술대회 논문집
    • /
    • pp.165-169
    • /
    • 2007
  • In order to develop VirtuAlmighty system, CPDM (construction project data management) and CPLM (construction project lifecycle management) model must be settled beforehand. Because most of information systems based on 3D-Design have its own database and business process. So, our team will develop collaboration management architecture of construction process for Decision Support based on PLM (Project Life-cycle Management). This architecture with business processes and Database can be used in process develop, process monitoring with many stakeholders of project, process change management, and so on.

  • PDF

Practical Issues of Earned Value Management Systems (EVMS) for Nuclear Power Plant (NPP) Construction

  • Jung, Youngsoo;Kim, Sungrae;Moon, Byeong-Suk
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.696-697
    • /
    • 2015
  • Cost, schedule, and quality are the three major performance indicators for any construction project. Under the globalized competition in the nuclear industry, researchers and practitioners have also explored a systemized and integrated management system for cost, schedule, and quality. In order to address this issue, the concept of earned value management system (EVMS) has been often utilized. However, implementing EVMS for a mega-project of nuclear power plant (NPP) construction requires extensive overhead efforts. Though previous studies proposed structures and methods for effective NPP EVMS, there has been no legitimate study for data collection strategy for practical implementation. In this context, the purpose of this paper is to develop an effective data collection strategy for NPP EVMS. Firstly, the barriers to practical NPP EVMS were identified based on literature review and expert interviews. Strategies for data collection were then developed based on different phases of project life cycle. This study focuses on the 'life-cycle integrated progress management system' for NPP construction from an owner's perspective Therefore, results of this study can be used as a guide for preparing request for proposals (RFP) of an NPP owner organization.

  • PDF

UTILITY-BASED PERFORMANCE MEASUREMENT SYSTEM (UBPMS) FOR COMPARISON OF CONSTRUCTION PROJECTS

  • Ki-Hyun Kim;Hee-Sung Cha;Ju-Yeoun Han;Il-Han Yu
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1509-1514
    • /
    • 2009
  • CII BM&M(Benchmarking & Metrics) in USA and DTI(Department of Trade and Industry) in UK have built up systems that enable performance measuring and made the results of performance measurement comparable between projects to utilize them as benchmarking tools. By comparing the results of performance measurement, it is possible to grasp the success level of project management and to establish the direction of management. However, construction projects are much diversified and even those projects with the same work type have different attributes. Therefore, simply comparing the results of project performance measurement without considering the characteristics of projects is not justifiable and affects the reliability of the benchmarking results. Therefore, to solve this problem, this study presents a methodology that makes it possible to compare the individual construction projects considering various characteristics. The benefits and importance of project characteristics to overall project performance will be quantitatively expressed and they will be reflected on the results of performance management. By maximally converting multiple projects with different characteristics into the same projects through a new methodology to convert different projects into the same level utilizing such utility-bases and comparing the performances of those projects, project performance results can be utilized in project management as a tool for more accurate decision making and as a robust benchmarking tool.

  • PDF

Revised PPC Measurement Method considering Interfering Float Weight of Task

  • Jung-Sook Yun;Hyung-il Kim;Jung-Ho Yu;Chang-Duk Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1479-1484
    • /
    • 2009
  • It is commonly recognized to need performance management for successful construction project. PPC measurement of Last Planner System is one of construction project measurement method. PPC measurement is quantitatively assessment to go through construction, and that is not completely to be trusted when compare a project with another or an individual case work with another in same project. According to, purpose of this study is comparison indicator establishment that compare project with another or an individual case work with another it is not use PPC measurement for quantitatively assessment to go through construction. The procedure of this study is derive of the point at issue of existing PPC measurement for a aim PPC measurement in this study expenditure and select weight about that and it is applied to actually construction.

  • PDF

C-PLM: 토목 프로젝트 관리를 위한 PLM 시스템 설계 및 구축 (C-PLM: Design and Implementation of a PLM System for Effective Management of Civil Projects)

  • 강형석;이상석;노상도;이광명
    • 한국CDE학회논문집
    • /
    • 제15권2호
    • /
    • pp.124-135
    • /
    • 2010
  • PLM(Product Lifecycle Management) is one of innovative manufacturing paradigms which leverages e-business technologies to allow a company's product content to be developed and integrated with all company business process through the extended enterprise. In these days, most construction companies also make an effort to enhance their systems for creating, sharing and managing information to improve business efficiency through entire lifecycle of project execution. Because of different needs, business process and diverse engineering activities such as design, structural analysis, installing simulation, documents and data managements, a new paradigm for construction companies is needed to manage and share the entire workflow, and information in total project lifecycle. In this paper, we conducted user requirement and business process analysis of constructions to design C-PLM system which is a PLM system for effective management of civil project and engineering activities. Also, we implement C-PLM system based on commercial PDM system, and applied it to civil project as case studies.

건설관리 업무의 정보시스템화 기대가치 평가 모델 (An Evaluation Model for the Expected Value of the Construction Project Management Information System)

  • 황인애;유정호;송상훈;류원희;박종원;김우영;이현수;최윤기
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.541-544
    • /
    • 2003
  • 건설 프로젝트 관리를 위한 정보시스템을 적용하고 있는 건설기업의 경우, 그 특성에 맞는 적절한 정보시스템 계획 방법이 필요하다. 건설관리 업무를 분석하여 업무의 특성을 파악하고, 정보기술적 측면을 함께 고려함으로써 정보시스템 계획이 이루어져야 한다. 따라서 본 연구에서는 업무의 특성에 따른 정보시스템화의 효과와 정보기술 적용의 가능성에 따른 기회를 분석하여 최종적으로 정보시스템화 기대가치를 평가하기 위한 모델을 제시하고자 한다. 정보시스템화 기대가치 평가 모델은 단위업무와 전보의 두 가지 관점에서 정보시스템화에 대한 기회와 효과를 평가하는 과정으로, 건설관리 업무의 정보시스템 계획을 위한 의사결정에 활용될 수 있다.

  • PDF

무안기업도시 건설사업관리 수행계획 (Program Management Implementation Plan for Muan Enterprise City Project)

  • 정의균;이필원
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.25-28
    • /
    • 2006
  • 무안기업도시 프로젝트는 투자규모가 기반 조성단계에서만 3조원에 이르는 대형 프로젝트로, 건설사업관리의 성공적인 수행이 사업 성패에 결정적인 영향을 미친다고 할 수 있다. 따라서 본 연구는 무안기업도시 프로젝트의 건설사업관리 수행을 위한 계획을 수립하기 위하여, 핵심과업 수행전략 및 조직구성 및 지원체계를 설정하는 것을 목적으로 하였다. 이를 위해 우선 사업의 개요 및 과업목표에 대한 분석을 하였으며, 사업관리의 필요성 및 프로세스를 살펴보았다. 이를 바탕으로 과업목표를 달성하기 위한 수행전략을 정의, 개발하고, 전략의 실질적 시행을 위한 조직구성 및 지원체계를 확립하였다. 본 연구는 올바른 계획 하에서 사업관리가 이루어질 수 있도록 지원함과 동시에, 향후 대형 프로젝트의 사업관리에 대한 사례로 기능할 수 있을 것이다.

  • PDF

플랜트 건설 공사를 위한 사업관리 전문가 시스템의 개발 (Development of Expert system for Plant Construction Project Management)

  • 김우주;최대우;김정수
    • 정보기술응용연구
    • /
    • 제2권1호
    • /
    • pp.1-24
    • /
    • 2000
  • 건설업에 있어서의 프로젝트 관리 즉, 사업 관리는 다른 분야에 비해 여러 가지 요인들로 인해 상대적으로 매우 높은 불확실성과 위험을 수반하게 되며, 이러한 불확실성과 위험으로 인해 건설업에서의 사업관리의 중요성이 매우 크게 인식되고 있다. 사업관리 단계에 있어 사업 정의 및 사업 계획 단계와 사업 설게 및 사업 수행 단계를 자동 또는 반자동적으로 동시에 일관성을 유지시킬 수 있는 체제의 확립이 절실하다고 판단되며, 이를 지원할 수 있는 지원시스템의 필요성이 부각되고 있다. 그러나 이들 초기 단계의 업무는 사업 설계 및 사업 수행 단계와 비교해 상대적으로 비정형적으며, 해당 기업의 축적된 노하우나 전문적 지식에 대한 의존성이 강함으로 인해 쉽게 시스템적 지원을 제공하는데 어려움을 가지고 있다. 특히 이러한 문제는 본 연구에서 대상으로 하고 있는 플랜트 건설 분야에서는 매우 두드러지게 나타나고 있다. 따라서 본 연구에서는 이러한 사업 관리 시스템과 연계될 수 있도록 할 수 있는 체계적 접근 방법을 제시하고 이를 구현함으로써 이상의 문제에 대한 하나의 해결 방법을 제시하고 있다. 이러한 해결 방안을 위한 주요 방법론으로서는 지식 기반 추론과 사례기반 추론 및 신경회로망 기법을 체택하고 있으며 덧붙여, 본 연구에서 개발된 사업 관리 전문가 시스템은 국내 굴지의 건설 회사의 열병 합발전소와 하수처리장 건설을 위한 실제 사업 관리 업무에 적용되어 그 성과를 경험적으로 검증하고 있다. 나아가 이러한 실제 적용 사례는 본 방법론 및 시스템이 다른 플랜트 건설 분야에서도 성공적으로 적용될 수 있으며, 따라서 플랜트 건설 분야에서의 사업 관리 업무의 질적 향상과 생산성의 제고에 기여할 수 있음을 시사하고 있다.

  • PDF

공공건설사업의 발주방식 개선방안 (The Improvement Plan of Project Delivery Systems in the Public Construction Projects)

  • 최은아;김현;박성용;조형진;이상범
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.509-512
    • /
    • 2008
  • 건설공사는 복잡화, 다양화, 대형화되고 있으며 이러한 다변화된 건설 환경에 대응하기 위해 건설 선진국에서는 다양한 발주방식을 도입 적용해 오고 있다. 국내에서도 지속적으로 발주제도를 개선해 오고 있으며, 최근에는 공공건설공사의 발주방식을 보다 다양화하려는 취지에서 국가계약법시행령 개정을 통해 "기술제안입찰", "설계공모 기술제안입찰"을 새로 도입하였다. 하지만 이러한 정부의 노력과는 달리 몇몇 발주기관에서는 발주방식 선정기준 부계로 인해 공공건설공사에 있어서 획일적인 발주방식을 적용하고 있다. 이에 본 연구는 공공기관에서 기 발주된 건설공사 실태 및 현황분석과 설문조사를 통하여 발주방식 적용에 있어서의 문제점을 도출하고, 개선방안으로 발주기관이 객관적인 자료로 활용할 수 있는 사업유형별 발주방식 선정기준을 제시하고자 한다.

  • PDF