• Title/Summary/Keyword: construction project management capability

Search Result 112, Processing Time 0.03 seconds

A Study on the Determining Factors For Assessment Criteria of Project Performance Capability of CM(Constuction Management) Considering Safety (안전을 고려한 건설사업관리 용역업자(CM) 사업수행능력 평가기준 요인 도출 연구)

  • Kim, Do-Su;Shin, Yoon-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.52-53
    • /
    • 2019
  • The construction industry has the most safety accidents among domestic industries. Special care must be taken because disasters in the construction industry lead to social problems caused by huge property losses and casualties. As a result of this, there is a growing awareness of disasters occurring in the construction industry, and government departments are tightening regulations on safety management. In particular, the OSHA(Occupational Safety and Health Agency) focuses on the expansion of protection targets and the clarification of responsibility in the full amendment OSHA. As a result, a study that focuses on safety management by client's responsibility is needed. In this study, the project performance capability assessment of construction project management contractors, which is being carried out with uniform assessment criteria without considering the characteristics of the construction project, is considered and all the amendments to the OSHA are considered, and the factors were derived for improvement measures.

  • PDF

Analysis of the Changes in the Perceived Important Capabilities of Construction Project Managers after the Global Financial Crisis

  • Lee, Na-Kyung;Bae, Ju-Lee;Jang, Hyoun-Seung
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.3
    • /
    • pp.8-16
    • /
    • 2012
  • After the 2008 global financial crisis, the construction environment in South Korea continued change in the construction environment. Construction orders in 2011 have shown a downward trend compared with the previous year. Along with these changes in the construction market, the professional capabilities of construction project managers that are perceived as important also changed after the global financial crisis. Accordingly, this study was conducted to identify the major business capabilities of the current construction project managers and to determine which of these capabilities have undergone changes in terms of the importance accorded to them after the global financial crisis, and ultimately, to derive the construction project manager capability areas that need to be strengthened according to the changes in the construction environment. The capabilities of construction project managers were surveyed at two different time points: in 2007 and in 2010. The results show that the year 2010, after the global financial crisis, an increase in the perceived important capabilities of construction project managers compared with 2007. This results the impact of the changes in the construction environment on the importance of construction project managers. This study derived the ramifications of the early identification of systems and prospects according to the changes in the construction circumstances on more efficient onsite and human resources management, by considering the appropriate capabilities of the construction project managers.

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF

Analysis of Competency Assessment Using IPA for Construction Project Managers (IPA 기법을 활용한 현장소장 역량 요인 도출 및 분석)

  • Kim, Hwa-Rang;Lee, Na-Kyung;Jang, Hyoun-Seung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.115-123
    • /
    • 2013
  • Changes have occurred in the professional capabilities of the construction project managers after the global financial crisis. As representatives of construction companies and projects, construction project managers have full responsibility over a construction project. Throughout its life cycle, from design through construction to completion, the business capabilities of such managers are regarded as critical elements in the changes in the country's construction economy. Therefore, this study aimed to determine the main capabilities of current construction project managers, and to analysis of its competitiveness using Important-Performance Analysis(IPA). The results of IPA were as follows; (1)capability to win new contracts and capability to collect information of new project are needed for external relation competitiveness, (2)gerentocratic management mind-set and active breakthrough are needed for internal project management competitiveness, and (3)capability to predict issues and self-improvement are needed for self discipline competitiveness. However, this work is still considered to provide the basic data that can help Korean construction companies who plan to educate the project manager's strengthen their medium and long-term capabilities.

Development of evaluation model on PMIS function using CMM - Focused on Project Communication Management - (CMM개념을 활용한 건설 PMIS 평가 모델 개발 - 프로젝트 의사전달관리를 중심으로 -)

  • Park Jeong-Ha;Shin Kyoo-Chul;Lee Jae-Seob
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.460-463
    • /
    • 2002
  • The construction sector is under growing pressure to increase productivity and improve quality, most notably in reports. A major problem for constriction companies is the lack of project assessing model for project management. One method of solving the problem is through the systematic management of construction processes. A development of model for assessing PMIS practice is attempting to develop a stepwise process assessment framework for the construction industry using Capability Maturity Model. This paper have provided further insights into the understanding of the framework, as well as its value for construction sector.

  • PDF

Developing a Project and Program Management Capability Assessment System for the Korean Construction Management Firms (국내 CM 기업의 프로젝트 및 프로그램 관리역량 평가를 위한 자가 역량 평가 시스템 개발)

  • Choi, Jaehyun;Son, Jaeho;Kim, Jihye
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.3-14
    • /
    • 2015
  • Since the global financial crisis, the Korean domestic construction market has continuously experienced downturns, and the Korean domain construction firms'profitability has been persistently deteriorated. Domestic construction firms have rapidly advanced to overseas markets exclusively for the construction contract packages. However, the profitability for the construction contracts has been lower compared to engineering or project management contracts. One of the critical issues the Korean firms have faced was project management capability across all phases in project execution. Even though several project management capability assessment tools were introduced, most tools were applicable to a wide variety of industry sectors rather than construction industry. Project management capability assessment tool specifically applicable to domestic CM firms was developed through this research, in order to assess project and program management capabilities and improve the competitiveness in overseas market Also, the correlation between project, programs, and the CM infrastructure were identified. The CM firms were divided into two groups according to the size of the business, and both were evaluated at the project and the program level based for the 9 different criteria. The project management capability assessment tool developed for the CM firms can be used for self-assessment to distinguish the strengths and weaknesses of each company at the project and program level. In addition, the current status of each group can be identified by spotting improvement areas for the management capabilities.

Evaluation of Capability for Practicing CM at Risk in Korea (국내 시공책임형 건설사업관리 수행을 위한 기업 역량 평가)

  • Ryu, HanGuk;Lee, Sangwon;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.79-87
    • /
    • 2020
  • The Korean domestic construction management at risk (CMAR) market is in the process of completing the pilot project execution under the leadership of the Ministry of Land, Infrastructure and Transport as of December 2019. The government starts practicing CMAR an alternative delivery method widely in order to diversify delivery methods and enhance construction technology. The CMAR market is thus expected to grow. This study was conducted to improve CMAR firms' capability by developing self-assessment tools for them to evaluate current capability more effectively. As a result of defining standard core capability and additional elements categorized by project execution phase and management area, and performing evaluation from the CMAR project participants, it was found that the general project management capability in the pre-design and procurement phase and quality management area was lower compared to the construction phase and other areas. In addition, the capability of cost management area was lower in spite of its high importance. Communication and coordination, process optimization, and target values achievement were at the initial level of capability and continuous improvement was required.

Analyzing the Relationship between Dynamic Capability of Project-Based Organization and the Competitive Advantage in the E&C Companies (프로젝트 조직의 동적역량과 건설기업 경쟁우위와의 상관관계 분석)

  • Jin, Sangjoon;Oh, Minjeong;Kim, Seungchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.73-85
    • /
    • 2019
  • Since the beginning of a new century, many Korean construction and engineering companies are facing a very dynamic and fast changing business environment which includes severe competition, higher risk, economic depression, declining revenues and profits, etc. In order to cope with these challenges, they need to secure special capabilities to actively adapt to the paradigm changes. One of those capabilities could be project management capability which allows us to manage organizational resources dynamically and integratively based on project portfolio management concept. The objective of this study is to investigate how the dynamic capability of a project-based organization to control the resource affects the firm performance and the competitive advantages. Data was collected from the construction and engineering companies in South Korea by using survey questionnaire, and analyzed for empirical tests by using statistical methods such as structural equation modelling and path analysis. The results showed that the organizational resources, if they had the VRIN characteristics, would have positive impacts on creating the dynamic capabilities for project organization. In turn, the dynamic capabilities of a project organization would have impacts on improving business performance and creating competitive advantages. Also, it was found that the organizational resources may have direct impact on business performance and competitive advantages. The academic contribution of this study is that it attempts to integrate resource based view and the dynamic capability theory about creating competitive advantages for project based organization. This study also provided practical implications to the companies in construction industry by showing how to use organizational resources strategically to create competitive advantages.

A Study on Evaluation of Construction Project Owner's Organizational Competency (건설사업 발주자 조직 역량 평가에 관한 연구)

  • Lee, Si-Wook;Woo, Sung-Kwon;Kim, Ok-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.146-155
    • /
    • 2009
  • In the construction industry, success or failure depends on the capability and role of the project owner's organization, which has an effect on the peoples' lives and national finance because of a lot of involvement from the project owner. Therefore, it is required that the project owner has the sufficient capability for the success of relevant industry and the further development of whole industry. Therefore, at the viewpoint of successful accomplishment of the construction industry, systematic and in-depth research that defines and evaluates the capability of the project owner's organization is necessary. As-Is and To-Be competency can be measured by the individual areas and elements through the survey. By evaluating these capabilities simultaneously, it is possible to assume not only the project owner's organizational competency but also constant other capabilities. It is become to make plans for strengthening the capabilities and to establish the strategy, by catching which capabilities are really necessary. It will result in positive effects on improving the capabilities of the project owner's organizational competency.

Suggestions for Sustainable Construction Project Management (지속가능한 건설사업관리를 위한 발전방안)

  • Lee, Seung-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.240-241
    • /
    • 2021
  • For the sustainable development of the domestic construction project management field, each CM company should try to diversify in terms of service contract types and scope of work while having internationally competitive technical and service capabilities as follows. First, from the initiation of the service to the completion, the CMr should be able to establish and execute a plan to create specific outcomes. Second, CMr must have the capability to produce weekly or monthly cost, schedule, risk, and scope management reports. In addition, it should be possible to apply the cost plus sliding fee method or to systematically and continuously accumulate and process data generated during the construction process.

  • PDF