1 |
Ahn, J. W. (2003). "Research for the maturity examination of the organization of the reference model, ISO / IEC TR 15504 Part2 : stepwise composition of an expression through a comparative study with CMMI"Ms thesis, Hongik University., Seoul.
|
2 |
Cho, D, W. (2010). "The Relationships Between Liability of Handicaps, Market entry costs, Internationalization Preparing Activities and Business Performances of Venture Firms: Comparison of Korean and Taiwanese Firms", Journal of management & economics, 32(5), pp. 65-74.
|
3 |
Im, H, J. (2012). "A study on project competency assessment model for small and medium enterprises." Ms thesis, Hanyang University, Seoul.
|
4 |
Jo, J. H. (2014). "Where the construction market is head to in 2014." (Mar. 15, 2014).
|
5 |
Joung, Y. S. (2013). "Strategic factors for domestic CM enterprises to enter the international market", Korean Journal of Construction Engineering and management, KICEM 14(3), pp. 15-17.
|
6 |
Kim, D, Y., and Han, S, H. (2005). "Fully Integrated Project Risk management system for International construction Projects", Korean Society of Civil Engineers, 2005(10), pp. 4037-4043.
|
7 |
Kim, J, H. (2013). "A Study on the Investigation into Obstacles in Overseas CM Projects." Ms thesis, Sejong University, Seoul.
|
8 |
Kim, S, C. (2011). "Special Section Paper: Adopting Systematic Project Management Methods for Productivity Improvement: Comparison of the Project Management Maturity Levels Between SMEs and Large Firms", Korean Journal of Construction Engineering and management, KICEM, 12(2), pp. 5-21.
|
9 |
Kim, S, W. (2007). FUNDAMENTALS of STATISTICS, Hakji Press, Seoul, pp. 96-97.
|
10 |
Ko. W, K. (2011). Social Science Data Analysis, Kyungmoon Press, Seoul, pp. 113-129.
|
11 |
Kwahk. K, Y. (2014). Statistical Data Analysis, Kyungmoon Press, Seoul, pp. 222-234.
|
12 |
Kwon, H. S. (2014). "Overseas new advanced construction firms switch back to growth." CMEWS, (Mar. 15, 2014).
|
13 |
Mok, S, K. (2004). "Organizational Approach for Enterprise Project Management by OPM3", Korea Industrial and System Engineering, 2004(2), pp. 200-203.
|
14 |
Project Management Institute, Inc (2008). "A Guide to the Project Management Body of Knowledge(Pmbok Guide)". 4rd, Project Management Institute, USA, pp. 10-13.
|
15 |
Yoon, W. H. (2011). "Analysing the impacts of Firm's Management capability on the Project Performance by Using the Scales of Project Management Maturity Model." MS thesis, Hanyang University, Seoul.
|
16 |
Shin, H. S., Kim, H. G., and Chung, L, C. (2010). "A Study on the Development of the CPM3(Construction Project Management Maturity Model) for the Enterprise Project Management", The Korean Institute of Plant Engineering, 15(4), pp. 11-25.
|