• Title/Summary/Keyword: construction progress

Search Result 884, Processing Time 0.027 seconds

Automatic indoor progress monitoring using BIM and computer vision

  • Deng, Yichuan;Hong, Hao;Luo, Han;Deng, Hui
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.252-259
    • /
    • 2017
  • Nowadays, the existing manual method for recording actual progress of the construction site has some drawbacks, such as great reliance on the experience of professional engineers, work-intensive, time consuming and error prone. A method integrating computer vision and BIM(Building Information Modeling) is presented for indoor automatic progress monitoring. The developed method can accurately calculate the engineering quantity of target component in the time-lapse images. Firstly, sample images of on-site target are collected for training the classifier. After the construction images are identified by edge detection and classifier, a voting algorithm based on mathematical geometry and vector operation will divide the target contour. Then, according to the camera calibration principle, the image pixel coordinates are conversed into the real world Coordinate and the real coordinates would be corrected with the help of the geometric information in BIM model. Finally, the actual engineering quantity is calculated.

  • PDF

A Case Study on Owner's Loss Incurred due to the Financial Cost of Public Construction Works in Korea (국내 공공공사에서 발주자 손실의 금융비용 사례연구)

  • Jeong, Min;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.136-145
    • /
    • 2008
  • Occasionally an owner of public construction work pays financial costs in addition to progress payments. However, the overall scale of financial costs are not known. This research examines, based on a case study, the financial cost incurred in public construction works and the following issues: the overall scale of financial costs, the impact on financial costs on the owner, and the impact of timing on the overall sum of the financial costs. Annually, more than 2.3 trillion KRW are paid as progress payments for public construction work; yet, there is no research data showing the scale of financial costs thus incurred. The purpose of this research is to illustrate the scale of financial costs incurred due to progress payments for public construction works, and to suggest alternatives that would improve relevant regulations.

A Study on the Progress Measurement Method using Percent Complete of Work and Labor Productivity - Focusing on Structural Works of Apartment Construction - (단위작업 물량 달성율과 투입 노무량을 이용한 진도율 산정방법에 관한 연구 - 공동주택공사의 골조공사를 중심으로 -)

  • Choi Hyun-Ha;Lee Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.212-219
    • /
    • 2005
  • Time management is important in construction management Especially, in the high-rise apartment housing projects, it is very important to expedite the construction progress in order to meet the planned schedule. The objective of this paper is to propose the baseline for the progress rate using work volume and man $\cdot$ hours performed at work activity level. The work volume far each activity is transformed to the weighted value compared to total work volume for the floor Therefore, a progress rate for an activity is calculated by multiplying a weighted value and work volume. A progress rate for a floor and a building can calculated in this manner, respectively.

A COMPARATIVE ANALYSIS ON EFFICIENCY AND TOTAL FACTOR PRODUCTIVITY IN CONSTRUCTION FIRMS BETWEEN KOREA AND JAPAN

  • J.L. Park;S.S. Kim;D.J. Kwark;J.G. Park;J.H. Kim;J.J. Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.315-320
    • /
    • 2013
  • The aim of this study is to compare efficiency and Total Factor Productivity(TFP) between Korean and Japanese construction firms in Korea and Japan over the period of 2005-2011. The results of this study are as follows. Efficiency scores of Korean construction firms are 0.797, and Japanese construction firms are 0.921. Second, annual total factor productivity growth of Korean construction firms is 0.5% and technical progress do much for TFP decrease. However Japanese construction firms marked annual increasing of 2.5% of TFP. Third, technical progress contributed in TFP increase of construction firms in Korea. Korean construction firms, however, relatively lagged behind Japanese construction firms in technical progress. Therefore, Korean construction firms need strategies to achieve technical advances including adopting new technology or process innovation to maintain competitiveness, survive, and develop in the future competition with Japan.

  • PDF

A REAL-TIME PMIS BASED INDUSTRIAL CONSTRUCTION PROJECT MANAGEMENT SYSTEM

  • Kyusung Lee;Hojeong Song;Jaehyun Choi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.352-358
    • /
    • 2013
  • As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner

  • PDF

A Study on a Systematization of Preliminary Construction Control for the Quality and Schedule Management of APT Construction (품질확보 및 공기지연예방을 위한 공사관리 체계화에 관한 연구)

  • Park, Hong Tae;Lee, Yang Kyoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.347-353
    • /
    • 2008
  • Generally speaking, it is important to know the activities itself exactly and to control the activities correctly so as to assure timely progress and the quality of any project. In order to progress smoothly in accordance with construction schedule, it is important to systematize the preliminary arrangements necessary for each process and then manage them. In this study, in order to progress smoothly the quality and schedule management of the construction, we can be made systematically pre-works in accordance with construction schedule by the civil construction items of the apartment house construction. we suggested pre-construction control item by the workers through experiential method of construction engineers in accordance with network schedule.

An Information-based Forecasting Model for Project Progress and Completion Using Bayesian Inference

  • Yoo, Wi-Sung;Hadipriono, Fabian C.
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.203-213
    • /
    • 2007
  • In the past, several construction projects have exceeded their schedule resulting in financial losses to the owners; at present there are very few methods available to accurately forecast the completion date of a project. These nay be because of unforeseen outcomes that cannot be accounted for earlier and because of deficiency of proper tools to forecast completion date of said project. To overcome these difficulties, project managers may need a tool to predict the completion date at the early stage of project development. Bayesian Inference introduced in this paper is one such tool that can be employed to forecast project progress at all construction stages. Using this inference, project managers can combine an initially planned project progress (growth curve) with reported information from ongoing projects during the development, and in addition, dynamically revise this initial plan and quantify the uncertainty of completion date. This study introduces a theoretical model and proposes a mathematically information-based framework to forecast a project completion date that corresponds with the actual progress data and to monitor the modified uncertainties using Bayesian Inference.

Centrifuge Model Experiments on Behavior of Waterproof Dike in Progress of Construction (원심모형실험을 이용한 방수제 안정성 검토)

  • Yoo, Nam-Jae;Kim, Dong-Gun;Lee, Dong-Won
    • Journal of Industrial Technology
    • /
    • v.31 no.A
    • /
    • pp.79-86
    • /
    • 2011
  • This paper is results of centrifuge model experiment of investigating geotechnical engineering behavior of waterproof dike, located in soft grounds, in Saemankem in progress of construction. Centrifuge test with artificially increased gravitational level of 50g were performed to find ground settlements and excess pore-pressures developed during construction of waterproof dike by simulating the construction stages being predicted to occur in field so that the stability of waterproof dike could be assessed.

  • PDF

Development of a Project Schedule Simulation System by a Synchronization Methodology of Active nD Object and Real Image of Construction Site

  • Kim, Hyeon Seung;Shin, Jong Myeong;Park, Sang Mi;Kang, Leen Seok
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.344-348
    • /
    • 2015
  • The image data of the web camera is used to identify the construction status of the site in a remote office and it can be used for safety management. This study develops a construction schedule simulation system based on the active nD object linked with real image data of web camera from the construction site. The progress control method by 4D object uses a method that the progress of each activity is represented with different colors by progress status. Since this method is still based on a virtual reality object, it is less realistic description for practical engineers. Therefore, in order to take advantage of BIM more realistic, the real image of actual construction status and 4D object of planned schedule in a data date should be compared in a screen simultaneously. Those methodologies and developed system are verified in a case project where a web camera is installed for the verification of the system.

  • PDF

Development of Active 5D CAD System for Replaning Progress Schedule According to Change of Project Cost (사업비 변동에 따른 공정계획 재수립을 위한 능동형 5D CAD 시스템 개발)

  • Kim, Hyeonseung;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.54-61
    • /
    • 2016
  • The initial planned annual cost is frequently adjusted under the construction process in construction projects. If the annual cost is reduced than the initial planned cost, the number of possible activities is also reduced from initial planned progress schedule. In such cases, project manager need to replan the progress schedule with possible activities within changed annual cost. However, most project manager will proceed as planned schedule without any change. After the project cost has been exhausted, there are many cases to stop the operation of the construction site. This study developed active 5D CAD system that can replan the progress schedule within changed annual cost and simulate the cost status according to the changed schedule for cost visualization. This system can be used as a decision-making tool in the replaning progress schedule and will be able to increase the practical usability of 5D CAD system.