• Title/Summary/Keyword: construction profit

Search Result 258, Processing Time 0.033 seconds

A STUDY ON CULTURAL PRACTICES IN CONSTRUCTION CONTRACTING ORGANIZATIONS IN MALAYSIA

  • H. Abdul-Rahman;Wang Chen;Halimatun. Othman
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.169-178
    • /
    • 2007
  • This paper has investigated the cultural practices influencing business performance and integrity in selected Malaysian contractors and has discussed culture related issues to improve the management of cultural capitals in the Malaysian construction industry. Issues of current enterprise culture and applicable cultural practices, leadership styles, enterprise axiology and integrity, cultural practices and loyalty, and identification of organizational culture are discussed during the semi-structured interviews and questionnaire survey. Conclusions has been drawn that the people oriented and task oriented management style have a similar quantity of supporters in Malaysian contractors. The integrity and profit are respectively identified as the enterprise axiology in the ethical and economic perspective. The monkey culture is considered as the most applicable type for the cultural practice and the current enterprise cultures applied in the Malaysian contractors are mostly positive to both the organizations and society.

  • PDF

RISK MANAGEMENT OF EXCHANGE RATES IN INTERNATIONAL CONSTRUCTION

  • Yong Han Ahn;Paul Holley
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.459-468
    • /
    • 2005
  • International contractors must consider the substantial risks related to unexpected foreign exchange fluctuation incurred by conducting their business and using foreign currencies in foreign countries. Most international contractors attempt to minimize foreign exchange exposure within a manageable range because it may influence the company's fundamental financial structure, reduce market value or profit margins, or disrupt ongoing and future projects. This research provides a qualitative study of existing foreign exchange exposure (transaction, operation, and translation exposure) and current & effective foreign exchange risk management in American and Korean international contractors, as they represent both new and long-time members of the global construction market. Finally, recommendations of techniques for new and existing international contractors to minimize and better manage foreign exchange risk will be offered.

  • PDF

A Case Study on the Risk Impact and Loss Cost of Temporary Aircraft Runway Construction (임시 활주로 건설공사의 위험영향 및 손실비용 사례분석)

  • Kang, Hyunwook;Lee, Wonbae;Kim, Minjung;Kim, Yongsu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.32-39
    • /
    • 2020
  • The purpose of this study is to derive the risk factors that occurred during the construction of the temporary aircraft runway and to analyse the risk costs and loss costs. For this purpose, actual construction data made during the construction of the aircraft runway were investigated. And the risk factors that occurred during the construction work were derived. So the increased construction costs and loss costs due to risk factors were analyzed. The results of this study are as follows: 1)The number of risk factors that occurred during the construction of the aircraft runway was derived from eight. 2)It was calculated that the total risk cost of 5.2million won, the risk cost of the owner's should be 243 million won and the cost of the contractor should be 277million won. 3)Owner's was up 2.36% from its planned budget and the contractor lost -277million won out of its planned profit of 443million won, resulting in a residual profit of 165million won. The results of the study are used as a reference for estimating risk factors and contingency that should be considered in aircraft runway construction.

A Relation between Financing Conditions and Business Operation of a Construction Company (자금조달환경과 건설업체 경영상태 간의 관계성 분석 연구)

  • Seo, Jeong-Bum;Lee, Sang-Hyo;Kim, Jae-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.12 no.1
    • /
    • pp.61-70
    • /
    • 2012
  • A construction project is very costly and takes a long time to make investment and yield profit. For this reason, financial institutions are cautious about financing construction projects. Meanwhile, a construction company needs financing from financial institutions to cover a large expense of a construction project. Thus, there is likely to be a close correlation between financing conditions and business operation of a construction company. To examine the relationship, variables were identified that are related to insolvency of a construction company and changes in financing conditions. The analysis period is between the second quarter of 2001 and the fourth quarter of 2010. Data was retrieved from TS2000 established by Korea Listed Companies Association (KLCA), Statistics Office, and Construction Economy Research Institute of Korea (CERIK). In terms of methodology, VECM (Vector Error Correction Model) was used to analyze dynamic relationship between changes in financing conditions and insolvency of a construction company based on the identified variables. The hypothesis was that changes in financing conditions would significantly affect business of a construction company, but, the analysis did not find a close relation between the two factors. However, it was shown that poor business of a construction company affects financing conditions adversely.

A System for Evaluating the Overseas Business Capability of Small & Medium Construction Companies

  • Lee, Changjun;Jang, Woosik;Han, Seung Heon
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.217-220
    • /
    • 2015
  • Because of the recession of the Korean construction market, many construction companies are expediting overseas business. Despite the rapid growth of international markets, the polarization of profit with SMCCs (Small and Medium Construction Companies) and large construction companies in the international construction market has become more serious. This problem causes competition to provide the lowest prices, which makes the future of overseas business for the SMCCs uncertain. Thus, the SMCCs require a reasonable capability evaluation system for overseas business. However, the existing evaluation methods focus on large construction companies. To address this problem, this study proposes a system to evaluate the overseas business capabilities. The 27 indicators to evaluate the overseas business capabilities are derived from a literature review and are verified through expert interviews. The indicators are classified into 4 large categories, and a questionnaire-based survey of 50 Korean SMCCs is conducted to analyze the correlation between overseas business capability and the indicators. The system expects to provide the effect of the indicators on the overseas business capability and the chance to evaluate the capability for overseas business.

  • PDF

Application of Activity-Based Costing(ABC) for Modular Building Construction Indirect Costs Calculation at the Manufacturing Stage (활동기준원가계산법(Actvitiy-Based Costing)에 의한 모듈러 건축물 공장제작단계 간접비 산정 방안)

  • Lee, JeongHoon;Park, Moonseo;Lee, Hyun-Soo;Lee, Kwang-Pyo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.139-145
    • /
    • 2015
  • Modular construction is combined with manufacturing production process and conventional construction industry technique. Considering characteristic of modular construction production process, manufacturing facilities require indirect costs for utilities, equipment, and overall maintenance, which can affect modular units pricing. However, current modular construction cost classification is inadvertent to reflect the manufacturing overhead costs, because it is generally added as a percentage to sum of labor, material and equipment as it called in single cost pool used. This process is easy to estimate the total construction cost at the project starting points, but it brings on misunderstanding of project profit estimations by "cross subsidization phenomenon". To prevent this situation, in this research aims to provide modular construction overhead cost handling process at the detailed indirect cost calculation for manufacturing stage using Activity-Based Costing as one of the powerful method for overhead costs estimation and allocation. Using this research results, modular construction cost estimators have more detailed cost information of modular units and prevent to misallocate indirect costs. Also, it can be utilized to aid the understanding of the company's profit structure.

Multi-family Residential Construction Management Practice in the U.S.

  • Cho, Namho
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1254-1254
    • /
    • 2022
  • The Multi-family Residential is one of the most famous building types for a rental property in the US. Often times it includes multiple residential buildings and some amenity facilities, including a clubhouse or leasing office, swimming pool, dog park, and garages. Since the building type is built for rental purposes, the construction planning is phased and it makes the project complicated. Detailed planning and execution are important for successful construction management. This paper provides some management practices that are applied to one of the multi-family residential construction projects in Phoenix, AZ. The Front End Planning (FEP) process performed by both owner and contractor is the first key to a successful construction project. Specifically, the early review of phased turnover strategy, grading, fire/Americans with Disabilities Act (ADA) compliance, and Mechanical/ Electricity/Plumbing/Technology (MEPT) will provide absolute benefit to the project. Second, using a scheduling method to control short-term schedules and long-term can provide the ability to manage the issues with agility. Third, material delivery and procurement dominate the both project schedule and cost. With this COVID-19 circumstance, it is hard to expect the material, equipment, and labor forces to be delivered on time with the contracted price. Managing floats are more than important to managing construction productivity. Risk management should work to share the risks fairly. Lastly, turnover is directly linked with the profit of the project for both owner and contractor. The communication between the owner and contractor to re-schedule the proper turnover schedule is important for the phased construction project.

  • PDF

The Current Status and Problems of Open Government Data on the Construction Sector and Its Improvement Plan (건설산업 공공데이터 개방의 현황과 과제)

  • Kim, Sung-Hwan;Choi, Seok-In;Yoo, Wi-Sung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.219-220
    • /
    • 2022
  • In order to meet the trend, construction public data are already disclosing not only data generated at the construction site but also various data ranging from inspection reports and public construction contracts through multiple portals. However, unlike the excellence of the open performance evaluated by the number of data, it is difficult to evaluate the specific level of disclosure because there is no case of analyzing the quality, ease of use, and possibility of further opening of the public construction data set. On the other hand, performance measurement is already performed using an internationally agreed evaluation method in different fields such as real estate, population, and environment. So it is essential to analyze the current status of public data openings in the construction field and to derive improvement tasks. Therefore, this study conducted a survey of researchers with the highest system utilization targeting representative public data open systems in the construction field, such as E-AIS(세움터) and KISCON. To ensure fairness and increase comparability, the questionnaire was composed using evaluation items on implementing public data conducted annually by the World Wide Web Foundation, an international non-profit organization. With these responses, we investigated the status of public data disclosure and opinions on data quality and derived tasks to improve public data disclosure in construction through the analysis of the results.

  • PDF

Investigation on the Service life of Disappeared Buildings in Busan (부산지역 멸실 건축물의 내구년한에 관한 실태조사연구)

  • 이재용;이수용
    • Journal of the Korean Society of Safety
    • /
    • v.18 no.3
    • /
    • pp.114-119
    • /
    • 2003
  • The building needs of the community are met by the interrelated construction activities of maintaining, modernizing and replacing the existing stock of building and by the erection of additional new building. Studying the service lift of buildings and how it is determined can serve as an important measuring stick in making decisions on construction policy. Therefore, the purpose of this study is to provide useful information for future construction through a comparative and analytical study of building structures on disappeared buildings. It was found that most building structure had a shorter service life than the standard set by The Korea Appraisal Board. This situation may have occurred due to the sharp rise in replacement of older buildings with new buildings for the purpose of monetary profit. To increase the economic life of buildings reduce losses of the nation's capital henceforth, examination on policy md steady study needs to be done.

Risk-based Profit Prediction Model for International Construction Projects (해외건설공사의 리스크 분석에 기초한 수익성 예측모델에 관한 연구)

  • Han, Seung-Heon;Kim, Du-Yon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4D
    • /
    • pp.635-647
    • /
    • 2006
  • Korean construction companies first advanced to the international markets in 1960's and so far have brought more than 4,900 projects which account for 193 billion dollars approximately. With the large increase of national employment and income being followed by the achievement, Korea's construction industry has made an enormous contribution to the improvement of domestic economy for the last 40 years. However, recently the increased risk in international markets as well as the sharpening competition with foreign companies promising in terms of advanced technologies and low labor cost have been driving Korean construction away from the market shares. According to ENR (Engineering News Record, 1994~2003), it is revealed that 15.1% of top 225 global contractors are suffering from loss in international construction markets. This phenomenon is largely due to the highly uncertain characteristics of international projects, which are inherently exposed to various and complicated risky situations. Furthermore, especially for Korean construction companies, it is often the case that the failure in an international construction project cannot be offset by even a sufficient number of successful domestic achievements. Therefore, not only the selective screening among the nominated projects which have strong possibility of collapse but the systematic strategies for controlling potential risk factors are also considered indispensable in international construction portfolio management. The purpose of this study is to first analyze the causal relationships of the profit-influencing variables and the project success, and develop the profitability forecasting model in international construction projects.