• 제목/요약/키워드: construction problems

검색결과 4,587건 처리시간 0.033초

A Study on Constructing Plane Section of Regular Tetrahedmn and Regular (바탕문제를 활용한 정사면체와 정육면체의 절단면 작도에 대한 연구)

  • Han, In-Ki;Kim, Moon-Sup
    • The Mathematical Education
    • /
    • 제46권3호
    • /
    • pp.303-314
    • /
    • 2007
  • In this paper we try to study a method of constructing plane sections of regular tetrahedron and regular hexahedron. In order to construct plane sections of regular tetrahedron and regular hexahedron first of all, we extract some base problems that are used for construction. And we describe construction process using base problems in detail.

  • PDF

A Case Study on Retarded Hardening of concrete Used Imported Cement (외국산시멘트 사용 콘크리트의 경화불량 원인에 대한 사례연구)

  • 이양수;김남호;김원기;정재동
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 한국콘크리트학회 1992년도 봄 학술발표회 논문집
    • /
    • pp.23-28
    • /
    • 1992
  • In recent years, due to the construction boom the demand of cement is increasing suddenly and the use of imported cement is inevitable. But, because the quality of imported cement varies quite a lot, many problems have been encountered in construction fields. These problems include hardening retardation, lower early strength and crack of concrete. The object of this study is to explain causes for hardening retardation from a construction field case and propose a solution

  • PDF

FLEXIBLE OPTIMIZATION MODEL FOR LINEAR SCHEDULING PROBLEMS

  • Shu-Shun Liu;Chang-Jung Wang
    • International conference on construction engineering and project management
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.802-807
    • /
    • 2005
  • For linear projects, it has long been known that resource utilization is important in improving work efficiency. However, most existing scheduling techniques cannot satisfy the need for solving such issues. This paper presents an optimization model for solving linear scheduling problems involving resource assignment tasks. The proposed model adopts constraint programming (CP) as the searching algorithm for model formulation, and the proposed model is designed to optimize project total cost. Additionally, the concept of outsourcing resources is introduced here to improve project performance.

  • PDF

Problems of Field Instrumentation System in associaion with Seoul Subway Construction (서울지하철 건설공사 계측현황 및 개선방안)

  • 이인근
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 한국지반공학회 2000년도 봄 학술세미나 논문집
    • /
    • pp.78-87
    • /
    • 2000
  • Enormous instruments have been installed to measure movement and stresses during and after the construction of Seoul Subway. However, a number of problems have been noticed and reported, such as planning, calibration, installation, contract procedure etc. Some of them are presented and discussed in this paper in order to call an attention to these problems and provide a baseline for the future improvement.

  • PDF

An Analysis on the Problems of General Conditions for Domestic Design-Build Construction Projects (국내 설계${\cdot}$시공일괄발주방식을 위한 공사계약 일반조건의 문제점 분석)

  • Seo Young-Min;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.303-306
    • /
    • 2003
  • Although design-build construction projects have recently increased. general conditions of construction contract are not reflecting the characteristic of design-build construction projects neither performing its fundamental roles as implying many claim elements. So. this study aims to propose the basis for improving the general conditions of the domestic design-build construction projects. This study reviews literatures associated with design-build construction contract and analyses domestic general conditions into foreign standard forms of general conditions. Additionally, it is examined the problems of design-build construction contracts and performed questionnaire survey to the practitioner in the construction contract field. In doing so, this study suggests the direction for improving general conditions of domestic design-build construction projects.

  • PDF

Design and Construction Problems of Semi-Shield Method (SEMI-SHIELD 공법의 설계 및 시공상 문제점)

  • Kim, Jong-In;Jung, Sung-Nam;Park, Yeong-Geon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 한국지반공학회 2009년도 세계 도시지반공학 심포지엄
    • /
    • pp.1275-1282
    • /
    • 2009
  • The tunnel excavations are used for construction of common utility tunnel, electric tunnel, communication line tunnel, water supply and public sewerage pile line in urban area. The trench cut methods were mainly used in the past, but now, tunneling method is more being used. The tunnel excavation method like as NATM, Messer-Shield, Semi-Shield Methods are being applied to small section tunnel in Korea. The actual construction results of seme-shield method are increasing due to simplified construction process and reduced noise and vibration. And also this method is being used frequently in waterway tunnel and construction of prevention flooding recently. The seme-shield method design guideline is absence except for electric line tunnel construction in Korea, because of the semi-shield method was developed in Europe and Japan. In the prescriptive design, engineer's subjects are tending to intervene, because of absence of standard and specification for details. Therefore, Design and Construction Problems of Semi-Shield Method were described and construction trouble was introduced for exam. These problem and construction troubles have to be examined thoroughly in advance.

  • PDF

POTENTIAL PROBLEMS OF RUNNING BUILDING MAINTENANCE PROJECTS IN CONSTRUCTION

  • Edmond W.M. Lam;Albert P.C. Chan;Daniel W.M. Chan
    • International conference on construction engineering and project management
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.856-863
    • /
    • 2009
  • The problem of urban decay in Hong Kong has drawn much attention of both practitioners and academics. Poorly managed buildings not just give a negative image to the Pearl of the Orient in the region, but also pose potential risk hazards to the health and safety of the general public. While it is necessary to devise a comprehensive plan on redevelopment and urban planning, preserving the existing buildings to maintain their conditions for habitation can be a short-term option to safeguard quality standard. With the increasing number of ageing buildings in Hong Kong, a lot of research efforts have been devoted to managing repair and maintenance projects properly (for example those initiated and funded by the Construction Industry Institute, Hong Kong; and the current study financially supported by The Hong Kong Polytechnic University). Given the short duration and more diversified nature of work, building repair and maintenance works are found to be more difficult to monitor and regulate when compared with new works. This paper aims to provide a comprehensive analysis on the problems of running building maintenance projects. An extensive review of contemporary literature was firstly conducted, which forms a solid basis for developing an empirical study on the problems and difficulties of running building maintenance projects from the viewpoints of industrial practitioners with a view to formulating effective strategies for managing maintenance projects successfully.

  • PDF

The Study on problems in Construction of Corrugated Steel Underground Culverts and Complementary Measures Thereof (파형강판 지중암거의 시공상 문제점 및 보완에 대한 고찰)

  • Jung, Young-Hwa;Seong, Yoo-Kyeong;Chang, Dong-Hui
    • Journal of Industrial Technology
    • /
    • 제28권A호
    • /
    • pp.133-140
    • /
    • 2008
  • The Corrugated steel plate structure(CPS) can be applied to construction sites with various purposes, and the merits of CPS such as economical efficiency and swiftness can be utilized when it is constructed properly in consideration of its characteristics. However, in Korea, since the history of corrugated steel plate culvert is relatively short, there are not enough design standards. This research is prepared for finding out the causes through examining and analyzing the problems based on the examples from the existing constructions. Moreover, this study can be utilized in preparing designs and design standards of corrugated steel plate culvert in the future and devising prevention measures and complementary measures by studying construction methods considering features of construction sites and circumstances, several points to be considered while carrying out construction works and prevention measures of a problem with the existing structures.

  • PDF

A Study on current Status and the problem of Agricultural Facilities (농촌시설물에 대한 현황 및 문제점 파악에 관한 연구)

  • Choi, Oh-Young;Shin, Han-Woo;Kim, Tae-Hui;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • 제8권6호
    • /
    • pp.147-154
    • /
    • 2008
  • In today, there has been an increase in the construction of agricultural facilities due to the development in agricultural technology. Agricultural facilities are becoming bigger and higher to plant various agriculture. This study analyzes the construction and maintenance problems in agricultural facilities. The results of this survey on the status of agricultural facilities are presented. Firstly, the construction cost is most important factor in agricultural facilities. Secondly, Materials durability is important factor in selecting the facilities. Third, safety in facilities is also important factor. The results of this research are greenhouse is lack of the law of contract and the performance and need for the construction process supervision.

A Study on the Unit Modular System Process Application Plan (모듈러공법의 국내 적용 활성화 방안에 대한 연구)

  • Kim, Do-Min;Lim, Jae-Bok;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.113-114
    • /
    • 2012
  • The productivity of the construction industry is lower than other industries. Modular system is suggested to enhance the productivity of the construction industry. Modular system is a construction method which installs units manufactured in factory on site. It enables to reduce the duration and improve the quality of the constructions. However, the construction technique applied to modular system has not overcome certain structural problems. To solve the problems and motivate the application of modular system, this study propose the hybrid system which use core to resist a lateral force.

  • PDF