• 제목/요약/키워드: construction preload

검색결과 14건 처리시간 0.023초

Numerical study of concrete-encased CFST under preload followed by sustained service load

  • Li, Gen;Hou, Chao;Han, Lin-Hai;Shen, Luming
    • Steel and Composite Structures
    • /
    • 제35권1호
    • /
    • pp.93-109
    • /
    • 2020
  • Developed from conventional concrete filled steel tubular (CFST) members, concrete-encased CFST has attracted growing attention in building and bridge practices. In actual construction, the inner CFST is erected prior to the casting of the outer reinforced concrete part to support the construction preload, after which the whole composite member is under sustained service load. The complex loading sequence leads to highly nonlinear material interaction and consequently complicated structural performance. This paper studies the full-range behaviour of concrete-encased CFST columns with initial preload on inner CFST followed by sustained service load over the whole composite section. Validated against the reported data obtained from specifically designed tests, a finite element analysis model is developed to investigate the detailed structural behaviour in terms of ultimate strength, load distribution, material interaction and strain development. Parametric analysis is then carried out to evaluate the impact of significant factors on the structural behaviour of the composite columns. Finally, a simplified design method for estimating the sectional capacity of concrete-encased CFST is proposed, with the combined influences of construction preload and sustained service load being taken into account. The feasibility of the developed method is validated against both the test data and the simulation results.

Analytical behavior of built-up square concrete-filled steel tubular columns under combined preload and axial compression

  • Wang, Jian-Tao;Wang, Fa-Cheng
    • Steel and Composite Structures
    • /
    • 제38권6호
    • /
    • pp.617-635
    • /
    • 2021
  • This paper numerically investigated the behavior of built-up square concrete-filled steel tubular (CFST) columns under combined preload and axial compression. The finite element (FE) models of target columns were verified in terms of failure mode, axial load-deformation curve and ultimate strength. A full-range analysis on the axial load-deformation response as well as the interaction behavior was conducted to reveal the composite mechanism. The parametric study was performed to investigate the influences of material strengths and geometric sizes. Subsequently, influence of construction preload on the full-range behavior and confinement effect was investigated. Numerical results indicate that the axial load-deformation curve can be divided into four working stages where the contact pressure of curling rib arc gradually disappears as the steel tube buckles; increasing width-to-thickness (B/t) ratio can enhance the strength enhancement index (e.g., an increment of 1.88% from B/t=40 to B/t=100), though ultimate strength and ductility are decreased; stiffener length and lip inclination angle display a slight influence on strength enhancement index and ductility; construction preload can degrade the plastic deformation capacity and postpone the origin appearance of contact pressure, thus making a decrease of 14.81%~27.23% in ductility. Finally, a revised equation for determining strain εscy corresponding to ultimate strength was proposed to evaluate the plastic deformation capacity of built-up square CFST columns.

Preload effects on behaviour of FRP confined concrete: Experiment, mechanism and modified model

  • Cao, Vui Van
    • Advances in concrete construction
    • /
    • 제9권6호
    • /
    • pp.597-610
    • /
    • 2020
  • Stress-strain models of fibre reinforced polymer (FRP) confined concrete have been widely investigated; however, the existing load which is always supported by structures during the retrofitting phase, namely 'preload', has been neglected. Thus, preload effects should be clarified, providing insightful information for FRP retrofitting of structures with preload conditions. Towards this aim, experiments were performed for 27 cylinder concrete specimens with the diameter 150 mm and the height 300 mm. Three specimens were used to test the compressive strength of concrete to compute the preloads 20%, 30% and 40% of the average strength of these specimens. Other 24 specimens were divided into 2 groups; each group included 4 subgroups. Four subgroups were subjected to the above preloads and no preload, and were then wrapped by 2 FRP layers. Similar designation is applied to group 2, but wrapped by 3 FRP layers. All specimens were tested under axial compression to failure. Explosive failure is found to be the characteristic of specimens wrapped by FRP. Experimental results indicated that the preload decreases 12-13% the elastic and second stiffness of concrete specimens wrapped by 2 FRP layers. The stiffness reduction can be mitigated by the increase of FRP layers. Preload negligibly reduces the ultimate force and unclearly affects the ultimate displacement probably due to complicated cracks developed in concrete. A mechanism of preload effects is presented in the paper. Finally, to take into account preload effects, a modification of the widely used model of un-preload FRP confined concrete is proposed and the modified model demonstrated with a reasonable accuracy.

휠 로더 차축 테이퍼 롤러 베어링의 내구수명 (Endurance Life of Taper Roller Bearing for Wheel Loader Axles)

  • 유대원;이재학
    • 대한기계학회논문집A
    • /
    • 제37권11호
    • /
    • pp.1323-1330
    • /
    • 2013
  • 휠 로더는 다양한 작업이 가능한 건설장비 중의 하나로서, 기능적 다양성과 구조적 신뢰성 향상의 요구가 증대되고 있다. 휠 베어링은 로더의 수명을 결정하는 핵심부품 중 하나이며, 테이퍼 롤러 베어링이 사용되고 있다. 일반적인 베어링 수명은 하중과 회전속도로 계산되고 있다. 테이퍼 롤러 베어링의 초기 예압은 내구수명에 직접적인 영향을 미치는 중요한 인자이다. 본 논문은 테이퍼 롤러 베어링에 작용하는 하중, 회전속도, 열 변형에 따른 초기 예압량을 포함한 내구수명 및 예압특성 관계를 제시하였다. 사용온도가 $100^{\circ}C$라면, 상온에 비해 과다 예압 상태가 되며, 내구수명은 약 20.3% 감소하는 결과를 나타내었다.

Load-transferring mechanism and evaluation theory of bolt with single and double nut fasteners

  • Qiyu Li;Dachang Zhang;Hao Xu;Yibi Li;Weiqun Chen;Kaixuan Zhang
    • Structural Engineering and Mechanics
    • /
    • 제86권2호
    • /
    • pp.261-276
    • /
    • 2023
  • The use of the ordinary double nut (i.e., ODN) composed of a master nut (i.e., M-nut) and a slave nut (i.e., S-nut) is a highly efficient method to prevent bolts loosening. A novel double nut (i.e., FODN) composed of a master nut (i.e., M-nut) and flat slave nut (i.e., FS-nut) is proposed to save raw materials. The bolt fastening tests with single nut, ODN and FODN are performed to investigate the preload and counterbalance forces. Corresponding finite element analysis (FEA) models are established and validated by comparing the preload with the experimental results. The load-bearing capacity, the extrusion effect, and the contact stress of each engaged thread for ODN and FODN are observed by FEA. The experimental and simulated results revealed that the bolt fastening with double-nut has different load-transferring mechanisms from single-nut. Nevertheless, for double-nut/bolt assemblies, the FS-nut can provide load transfer that is like that of the S-nut, and the FODN is a reasonable and reliable fastening method. Furthermore, based on the theory of Yamamoto, a formula considering the extrusion effect is proposed to calculate the preload distribution of the double-nut, which is applicable to varying thicknesses of slave-nuts in double-nut/bolt assemblies.

Experimental and numerical study on pre-cambered deep deck-plate system

  • Seung-Ho, Choi;Inwook, Heo;Khaliunaa, Darkhanbat;Sung-Mo, Choi;Kang Su, Kim
    • Computers and Concrete
    • /
    • 제30권6호
    • /
    • pp.445-453
    • /
    • 2022
  • A pre-cambered deep deck-plate system has been developed that can realize a long span by offsetting the deflection caused by a construction load. In this study, finite element (FE) analysis is performed to examine the preload-camber relationship introduced into a deck and calculate the deflection reflecting the ponding effect that arises during concrete pouring. The FE analysis results showed that the stress of the bottom plate was half of the yield stress when the pre-camber of approximately 30 mm was introduced. Based on the FE results, a full-scale deep deck-plate is fabricated, a pre-camber is introduced, and concrete is poured to measure deflection. A deflection calculation formula that reflects the ponding effect is proposed, and the deflections yielded by the proposed model, experimental results, and FE results are compared. Results show that the proposed model can accurately estimate the deflection of non-supported deep deck-plate systems after concrete is poured.

Innovative Methodology for Assembling Jack up Leg of 205m on ground of Ultra

  • 양영태;심송섭;이승엽;황외주;신봉영
    • 한국해양공학회:학술대회논문집
    • /
    • 한국해양공학회 2003년도 추계학술대회 논문집
    • /
    • pp.87-92
    • /
    • 2003
  • Generally, in jack up rig design for harsh environment, its leg height is a major factor for achieving a sufficient serviceability & operability in terms of the worst environment and the workable depth. Due to difficulties in constructing such a high-slender leg, inaccessibility of yard fabrication equipment, etc. the construction of Jack up rig fur harsh deep sea has not been common. Method using heavy crawler crane, fabrication tower or extension by the floating crane vessel is still conventional construction but, considering high cost fur mobilizing heavy lift vessel (HLV) or additional marine work for implementing preload / full height test at sea, the ground-base construction is much advantageous. Air skidding method (ASM hereafter) is ground-based construction methodology, newly developed due to such requests. ASM could also be extended to similar engineering fields. This paper presents the operating sequence, design parameters and procedure which were verified through successful operation at the end of May 2002.

  • PDF

Structural Characteristics of Preloaded Deep Deck Composite Slabs with Tenns

  • Lee, Tae-Hun;Kyung, Jae-Hwan;Song, Jong-Wook;Choi, Sung-Mo
    • 국제초고층학회논문집
    • /
    • 제9권2호
    • /
    • pp.187-195
    • /
    • 2020
  • As deep decks are commonly used in construction fields and high-rise building. etc, the slim floor system is increasingly employed. But, the drawback of the slim floor system is that the use of 250 mm deep decks in a structure having a clear span of more than 6 m because of deflection and flexural buckling. This study suggests a non-support construction method where tendons are installed in the deep decks of the slim floor structure to introduce preload in order to control deflection in a structure having a clear span of 9 m. Loading tests were conducted to verify the composite effect and flexural capacity of the preloaded deep deck composite slab and evaluate the serviceability of the supportless construction method. The results showed the complete composite behavior of the preloaded deep deck composite slab with tendons. The specimens satisfied deflection limit and the working load was approximately 25% of the maximum load capacity. It is deemed that the cross-sectional area and yield strength of the deck plate should be taken into account in slab design and the yield strength and diameter of the tendon should be determined with the pre-tension taken into consideration.

침하예측방법들을 이용한 부산신항만 현장 침하 분석 (Analysis of the settlement of Pusan New Port construction site using the settlement prediction methods)

  • 박현일;김하영
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2009년도 세계 도시지반공학 심포지엄
    • /
    • pp.1202-1205
    • /
    • 2009
  • Embankment preloading, in conjunction with prefabricated vertical (PV) drains, was used to accelerate consolidation of marine clays in Pusan New Harbour project. UP to eightteen settlement plates were installed at the ground reclamated site under the embankment fill to monitor the preload performance. This analysis is carried out by five settlement prediction methods including the Asaoka, Hyperbolic, Hoshino, and back-analysis method based on optimization. The field settlement data can be analysed by settlement prediction methods to predict the ultimate settlement and the degree of consolidation of the reclaimed land under charge fill. The authors compared with the analyzed results of the methods.

  • PDF

Removable shear connector for steel-concrete composite bridges

  • Suwaed, Ahmed S.H.;Karavasilis, Theodore L.
    • Steel and Composite Structures
    • /
    • 제29권1호
    • /
    • pp.107-123
    • /
    • 2018
  • The conception and experimental assessment of a removable friction-based shear connector (FBSC) for precast steel-concrete composite bridges is presented. The FBSC uses pre-tensioned high-strength steel bolts that pass through countersunk holes drilled on the top flange of the steel beam. Pre-tensioning of the bolts provides the FBSC with significant frictional resistance that essentially prevents relative slip displacement of the concrete slab with respect to the steel beam under service loading. The countersunk holes are grouted to prevent sudden slip of the FBSC when friction resistance is exceeded. Moreover, the FBSC promotes accelerated bridge construction by fully exploiting prefabrication, does not raise issues relevant to precast construction tolerances, and allows rapid bridge disassembly to drastically reduce the time needed to replace any deteriorating structural component (e.g., the bridge deck). A series of 11 push-out tests highlight why the novel structural details of the FBSC result in superior shear load-slip displacement behavior compared to welded shear studs. The paper also quantifies the effects of bolt diameter and bolt preload and presents a design equation to predict the shear resistance of the FBSC.