• Title/Summary/Keyword: construction periods

Search Result 419, Processing Time 0.025 seconds

Fundamental Research of Early Frozen Damage on Concrete Depending on Various Time Periods of -20℃ Temperature Condition (외기온 -20℃의 유지시간 변화에 따른 초기동해 피해의 기초적 연구)

  • Choi, Yoon-Ho;Han, Jun-Hui;Lee, Young-Jun;Hyun, Seung-Yong;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.197-198
    • /
    • 2019
  • The aim of the research is evaluating the feasibility of inspection for early age frozen damage and for expansion of concrete under the various time periods of -20℃ temperature condition. When the concrete samples were exposed for 12 hours and 24 hours, the frozen depth of the concrete were 10 and 60 mm, respectively, under the wet conditions. From the experiment results of temperature and expansion, only surface area suffered frozen damage for 12 hours exposing conditions while entire area suffered frozen damage for 24 hours exposing conditions.

  • PDF

Anti Corrosive Performance of Al and Zn Coatings Deposited by Plasma Arc Thermal Spray Process in Artificial Ocean Water (인공해양환경에서 플라즈마 아크 용사 공법이 적용된 Al 및 Zn 코팅의 부식 방지 성능 평가)

  • Adnin, Raihana Jannat;Lee, Han-Seung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.52-53
    • /
    • 2020
  • The thermal spray coating process is being used to protect the metals and alloys from wear, abrasion, fatigue, tribology, and corrosion failure. Therefore, in the present study, Al and Zn was deposited by plasma arc thermal spray process onto the steel substrate and their performance was assessed. The bond adhesion result shows that Al coating has higher value attributed to compact, dense, and less porous compared to Zn coating which contain defects/pores and uneven morphology assessed by scanning electron microscopy (SEM). Electrochemical results show that the Al coating exhibited higher impedance value compared to Zn in artificial ocean water solution at prolonged exposure periods. However, both coatings show the increment in polarization resistance with exposure periods which reveal that porosity of coatings is filled by the corrosion products.

  • PDF

The Corrosion Protection Performance of Al and Al-5%Mg Coatings Deposited on Steel Surface by Arc Thermal Metal Spray (강재 표면에 아크 금속 용사된 Al 및 Al-5 % Mg 코팅의 방지 성능)

  • Adnin, Raihana Jannat;Lee, Han-Seung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.140-141
    • /
    • 2021
  • Arc thermal spray process is widely used to protect the steel from corrosion and abrasion. In the present study, two different coatings i.e. Al and Al-5%Mg were used to compare their corrosion resistance performance and the effect of 5% Mg addition in the properties of deposited coating. The SEM results showed the more compact and less porous morphology of Al-5%Mg coating compared to Al. The corrosion resistance performance of both deposited coatings was studied in artificial ocean water with exposure periods and results are compared. The total impedance values of Al-5%Mg at 0.01 Hz exhibited highest with exposure periods might be attributed to the coating and corrosion products nature and morphology compared to Al coating.

  • PDF

Review of Non-Contact Concrete Damage Depth Estimation Technique Based on High-Power Pulsed Laser (고출력펄스 레이저 기반 비접촉 콘크리트 열화깊이 추정 기법 검토)

  • Choe, Gyeong-Cheol;Kim, Hong-Seop;Jeon, Jun-Seo;Kim, Eun-Young;Lee, Mun-Hwan
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.267-268
    • /
    • 2023
  • Out of an estimated 7 million buildings nationwide, approximately 38% of them have been standing for over 30 years, and this number is expected to continue to increase. Additionally, due to the Building Act, safety inspections will be mandatory for approximately 70,000 buildings annually, leading to an increase in demand for building safety inspections. However, the current building safety diagnosis heavily relies on manpower, making it difficult to diagnose locations that are hard to access, and requiring lengthy investigation periods. Therefore, this paper presents the basic research results of a non-contact concrete damage depth estimation technique using laser technology aimed at remote building safety diagnosis and shortening investigation periods.

  • PDF

Influence of the Global Warming in Domestic Construction Schedules (지구온난화가 국내 건설 공기에 미치는 영향에 관한 연구)

  • Chae, Hee-Mann;Cho, Sung-Woo;Yang, Chang-Hyun;Son, Chi-Soo;Kim, Kyung-Hwan;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.567-570
    • /
    • 2007
  • Recent changes of the climate, which caused by global warming, have much effect world-widely. Korea also has struggled with these kinds of weather problems, and construction industry couldn't get away with them, either. However, the research, regarding to these problems, has not been quite settled, yet. Therefore, this study is to find out how the global warming can affect construction periods. As a result, we could recognize that changes of climate, which caused by global warming, also affects non-working days, too. This study is expected to be used as the data to find out the relationship between weather changes and domestic construction industry in the future.

  • PDF

Performance Assessment of Hollow Precast Segmental Bridge Columns with Reinforcement Details for Material Quantity Reduction (조립식 물량저감 중공 철근콘크리트 교각의 성능평가)

  • Kim, Tae-Hoon;Park, Dong-Kyu;Lee, Jae-Hoon;Shin, Hyun-Mock
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.20 no.1
    • /
    • pp.33-43
    • /
    • 2016
  • This study investigates the performance of hollow precast segmental bridge columns with reinforcement details for material quantity reduction. The proposed triangular reinforcement details are economically feasible and rational, and facilitate shorter construction periods. The precast segmental bridge columns provides an alternative to current cast-in-place systems. We tested a model of hollow precast segmental bridge columns under a constant axial load and a quasi-static, cyclically reversed horizontal load. We used a computer program, Reinforced Concrete Analysis in Higher Evaluation System Technology (RCAHEST), for analysis of reinforced concrete structures. The used numerical method gives a realistic prediction of performance throughout the loading cycles for hollow precast segmental bridge column specimens investigated. As a result, proposed reinforcement details for material quantity reduction was equal to existing reinforcement details in terms of required performance.

Construction of Delay Predictine Models on Freeway Ramp Junctions with 70mph Speed Limit (70mph 제한속도를 갖는 고속도로 진출입램프 접속부상의 지체예측모형 구축에 관한 연구)

  • 김정훈;김태곤
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1999.10a
    • /
    • pp.131-140
    • /
    • 1999
  • Today freeway is experiencing a severe congestion with incoming or outgoing traffic through freeway ramps during the peak periods. Thus, the objectives of this study is to identify the traffic characteristics, analyze the relationships between the traffic characteristics and finally construct the delay predictive models on the ramp junctions of freeway with 70mph speed limit. From the traffic analyses, and model constructions and verifications for delay prediction on the ramp junctions of freeway, the following results were obtained: ⅰ) Traffic flow showed a big difference depending on the time periods. Especially, more traffic flows were concentrated on the freeway junctions in the morning peak period when compared with the afternoon peak period. ⅱ) The occupancy also showed a big difference depending on the time periods, and the downstream occupancy(Od) was especially shown to have a higher explanatory power for the delay predictive model construction on the ramp junction of freeway. ⅲ) The speed-occupancy curve showed a remarkable shift based on the occupancies observed ; Od < 9% and Od$\geq$9%. Especially, volume and occupancy were shown to be highly explanatory for delay prediction on the ramp junctions of freeway under Od$\geq$9%, but lowly for delay predicion on the ramp junctions of freeway under Od<9%. Rather, the driver characteristics or transportation conditions around the freeway were through to be a little higher explanatory for the delay perdiction under Od<9%. ⅳ) Integrated delay predictive models showed a higher explanatory power in the morning peak period, but a lower explanatory power in the non-peak periods.

Optimization of Estimating Duration of the Structural Frame for the High-rise Apartment Housing during the Winter season -Focusing on One Cycle Time Scheduling Mechanism of the Typical Floor- (동절기 아파트 골조공사의 적정공기 산정에 관한 연구 - 기준층 사이클 공정분석을 중심으로 -)

  • Bang Jong-Dae;Han Choong-Hee;Kim Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.170-178
    • /
    • 2004
  • Public construction companies have strictly followed a rule that they should not work in the wet area such as structural frame for a certain period during the winter season. It is usually known that the non-working period during the winter causes increase of the project duration, and the project cost escalation. Also, it makes negative effects on national economy because it reduces workers income. Therefore, the site work for the structural frame should be performed even during the whiter season. But the site work for the structural frame during that period cannot proceeds in the same way as during other periods, and requires a different method for estimating project duration. Through an analysis of time scheduling mechanism, actual working days are obtained for 1 cycle of typical floors in the structural frame during these periods, and non-working days of 5 years average are calculated based on calendar day using data of 5 years weather forecasts for that season. This study proposes an optimized way of estimating project duration for 1 cycle of typical floors in the structural frame during these periods. This estimating method uses the combined actual working days and non-working days of 5 years' average, and the estimated results are confirmed by being compared with field data. This study is expected to be used in estimating the construction duration of the structural frame during the winter season.

Construction of a Relation Between the Triadic Min(N, T, D) and Max(N, T, D) Operating Policies Based on their Corresponding Expected Busy Periods (Busy Period 기대값을 사용하여 삼변수 Min(N, T, D)와 Max(N, T, D) 운용방침사이의 관계식 설정)

  • Rhee, Hahn-Kyou
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.3
    • /
    • pp.63-70
    • /
    • 2010
  • Based on the known results of the expected busy periods for the triadic Min (N, T, D) and Max (N, T, D) operating policies applied to a controllable M/G/1 queueing model, a relation between them is constructed. Such relation is represented in terms of the expected busy periods for the simple N, T and D, and the dyadic Min (N, T), Min (T, D) and Min (N, D) operating policies. Hence, if any system characteristics for one of the two triadic operating policies are known, unknown corresponding system characteristics for the other triadic operating policy could be obtained easily from the constructed relation.

Analysis of Construction Cost Fluctuation Trends and Features on Apartment Housing

  • Park, Wonyoung;Kang, Tai-Kyung;Baek, Seung-Ho;Lee, Yoo-Sub
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.624-635
    • /
    • 2012
  • Construction projects, including housing, are carried out over long periods of time. According to changes to the construction period, the cost of input materials and wages also changes. Therefore appropriate management is important in order to minimize cost risks caused by fluctuations in prices. In Korea, housing units are usually sold in lots prior to construction completion. Therefore, careful management of input elements such as materials and equipment that are sensitive to price fluctuations is very important. This study deals with how the price fluctuation of materials, labor, and equipment influences the change of housing cost and seeks a way for cost management through identifying key resources sensitive to price fluctuation. As a result, a change to the housing cost index multiplies depending on cost changes of materials and labor together. Labor costs are a major factor on the housing cost index. In addition, certain types of materials and labor input to housing construction greatly influence price fluctuations. Thus, it is found that managing those main cost factors is the key for effective cost management.