• Title/Summary/Keyword: construction operation management

Search Result 1,050, Processing Time 0.026 seconds

Development of Optimum Construction Lift Operation System using Sensing Information for High-rise Building (센싱정보를 활용한 초고층 건설용 리프트 최적화 운행 시스템 개발)

  • Shin, Joong-Hwan;Kwon, Soon-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.153-163
    • /
    • 2013
  • As recent buildings have been more higher and larger, construction vertical lifting planning and operation is a key factor for successful project in tall building. Although many studies have been trying to set up a construction lifting planning system at early stage, there's not existing a control real-time lift operation control system with respect to during construction stage. Therefore, In this study, we use the sensor device to collect the lift operating data for improvement of lift operation efficiency and develope optimum lift operating system which can perform real-time analysis. Finally, we verify the efficiency of proposed system through comparison between realtime operating data and simulated data using proposing system. In this paper, the proposed system show more efficient moving line compared with previous system. This can contribute to development of unmanned lift system.

Improved Approach to ISO 9002 Certification for Small and Medium Construction Company (중소건설업체 ISO 9002 인증추진 절차 개선방안)

  • 이재훈;강창욱
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.19 no.40
    • /
    • pp.351-360
    • /
    • 1996
  • Korean construction companies are now in very difficult situation due to the recent construction accident, opening of domestic market, the advent of boundless competition period in WTO, etc .Introduction of quality management system is quite urgent in order to strengthen our international competitiveness through the superiority of quality and foster the long term growth of organization. Substantially, many companies are proceeding with or completed the introduction of quality management system but small and medium sized construction companies have difficulties due to lack of money and man power. In this paper, five stage procedures, which can be efficiently applied to introduction and operation of qualify management system, have been suggested to help the minor construction companies which want to adopt the quality management system. This study is considered to be helpful for the companies which will introduce quality management system.

  • PDF

RISK MANAGEMENT OF EXCHANGE RATES IN INTERNATIONAL CONSTRUCTION

  • Yong Han Ahn;Paul Holley
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.459-468
    • /
    • 2005
  • International contractors must consider the substantial risks related to unexpected foreign exchange fluctuation incurred by conducting their business and using foreign currencies in foreign countries. Most international contractors attempt to minimize foreign exchange exposure within a manageable range because it may influence the company's fundamental financial structure, reduce market value or profit margins, or disrupt ongoing and future projects. This research provides a qualitative study of existing foreign exchange exposure (transaction, operation, and translation exposure) and current & effective foreign exchange risk management in American and Korean international contractors, as they represent both new and long-time members of the global construction market. Finally, recommendations of techniques for new and existing international contractors to minimize and better manage foreign exchange risk will be offered.

  • PDF

The Improvement Plan of Project Management for Highway Construction Supervisor using Construction Management Benchmarking of Developed Countries (선진국의 공사관리 벤치마킹을 통한 도로건설공사 감독자의 공사관리 향상방안)

  • Lee, Min-Woo;Shin, Eun-Young;Lee, Kyo-Sun;Park, Hwan-Pyo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.138-148
    • /
    • 2006
  • The construction supervisors of the public companies are usually responsible for process management, quality management, safety management, and many other various tasks that occur during construction project. Public companies such as Korea Highway Corporation have developed a framework and manual for management and supervision of construction projects. But, there has been the change of business environment such as increase of private investment project and the introduce of construction management system recently. It has been necessary for construction supervisor to streamline the current project management system in the owner's aspect in order to cope with the expected new challenges. Accordingly, this research has been investigated and analyzed the operation system between Korean supervisor and foreign supervisor in their public corporation. This research has suggested the advanced project management in their public corporation. Especially, this study has proposed the construction management manual for supervisors such as inspectors training, supervisors construction manual, and supervisors training road map.

A COMPARISON OF OLD AND NEW OSHA REGULATIONS ON CRANES AND DERRICKS USING COMPREHENSIVE GAP ANALYSIS

  • Chung-Suk Cho;Francis Boafo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.74-79
    • /
    • 2013
  • Aiming at reducing deaths and injuries involving construction crane operations, OSHA has recently updated its 40-year-old crane safety standards with new rules addressing the use of cranes and derricks in construction. The goal of this change in rule is to deal with the leading causes of fatalities related to crane and derrick operations. Employers in the construction industry are mandated to ensure that employees in the work zone are trained to recognize hazards associated with the use of the equipment and any related duties that they are assigned to perform. However, those responsible at construction sites for the supervision and management of safe crane operations often lack the integrated knowledge of the standards, regulations and best practices for conducting or supervising daily, monthly, or quarterly inspection of cranes. As such, proper planning, management and implementation of crane operations, including inspections are just as paramount to reducing accidents on the construction site. It is important that engineers responsible for the management and planning of crane operations understand the latest OSHA crane and hoisting standards to ensure a safer work environment is maintained. Many on site engineers overseeing crane operations do not have adequate training, experience, and knowledge of the inspection requirements to assess safe crane operation and too often rely on the crane operator's judgement. This paper highlights recent research effort in defining significant changes in new crane and hoisting standards and provides basis for safety construction operations.

  • PDF

A study on the Application of Operation Model for Technical Proposal-Based Tender of Large Construction Project (대형공사에 효율적인 기술제안형 입찰방식 적용에 관한 연구)

  • Cho, Sung;Cho, Yong;Paek, Joon-Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.591-596
    • /
    • 2008
  • Success or failure highly depends on delivery method in construction projects. This paper mainly focused on operation model for technical proposal in Large construction projects. This operational model uses Technical Proposal-Based Tender. This project studied order and delivery method in large construction projects. And delivery systems of international and domestic market are researched, and then condition of delivery system and problems are derived from them. Especially, it researched that it is hard to reflect special feature in large construction projects. As a result of having referenced idea as describe above, this paper will be studied by this process. First, definition of delivery method and large construction projects is researched. Second, delivery systems of international and domestic market are checked. Third, problems and condition of delivery system in large construction projects are investigated. Fourth, application of operation model for technical proposal-based tender are presented in large construction projects.

  • PDF

EVALUATION OF SUSTAINABILITY OF CONSTRUCTION OPERATIONS: A FRAMEWORK FOR THE NEW ZEALAND CONSTRUCTION INDUSTRY

  • Jasper Mbachu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.550-557
    • /
    • 2009
  • The concepts of 'sustainable development', 'sustainable construction' and 'green building' have been elevated to priority levels in all types and phases of construction project development worldwide. Consultants and contractors are now required to seriously consider the impact of their operations on the natural environment and the society, and consequently adopt sustainable construction practices in the development process to minimize and mitigate the negative impacts of their activities. However, existing sustainability rating tools apply to the design, post-construction and operation phases of a building; no tool exists for the rating of the performance of the contractor or the project team at the construction phase. This study aimed to develop a model for evaluating the sustainability of construction operations, drawing on the global best practice standards on sustainability. Practical applications of the model were carried out through case studies to evaluate the performances of fifteen construction firms in New Zealand. The developed model and the outcomes of the case studies were presented, including potential areas of weaknesses, strengths, constraints to achievement or adoption of sustainable construction practices and areas for improvement in the operations of the firms. The successful application of the developed model in practice shows its usefulness and ease of application. It is therefore recommended for adoption as a simple but effective system for measuring and reporting on sustainability performance or sustainability of construction operations of firms in New Zealand and elsewhere.

  • PDF

Estimating Maintenance Cost by Actual Database Based on Operation in Sewage Treatment Plant (하수처리장 실적데이터베이스를 활용한 유지관리비용 예측)

  • Lee, Tai-Sik;Kwak, Dong-Koo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.10
    • /
    • pp.2803-2809
    • /
    • 2009
  • For a successful construction project not only construction engineering and project management technology but also economic evaluation technique is required. Design and construction technologies are necessary to receive a project order. However, construction management technology which can be apply from the project initial phase to the project operation and management phase is required to create a benefit from the project. Construction management technology is one of the effective factors for project success. Economical and efficient cost management from the planning phase influences the project success. This study investigated cost flow and cost factors of domestic Sewage Treatment Plant project for systematic analysis of cost items following the entire project phase. Particularly, data modeling based on domestic Sewage Treatment Equipment maintenance cost DB was performed, and maintenance cost estimation trend line is suggested using Monte carlo Simulation Method to decrease uncertainty of actual results DB and for feasibility study. Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society.

A Study on the Estimating of the Dump Truck's Travel Speed Based on Analysis of Factors Affecting Earthmoving Operation (운반작업의 영향요소분석을 통한 덤프트럭의 운반속도 산정방법에 관한 연구)

  • Park, Hyeon-Yong;Tae, Yong-Ho;Woo, Sung-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.97-105
    • /
    • 2007
  • In many construction projects, such as dams, highways, airports, buildings, industrial plants, and sewerage and drainage systems earthmoving operation is defined the movements of a certain quantity of earth to alter the surface configuration or conditions so that projects requirement can be met. Accurate calculation of travel time is essential for determining productivity of earthmoving operations, and for ultimately selecting the most cost-effective fleet configuration for executing the work. Also transportation work that utilizes dump truck consists average So in the whole expenses earthmoving operation, and is an important cost factor for cost management. Therefore this study proposes a methodology for optimum transfer speen based on the analysis of factors affecting earthmoving operation in different road types by collecting the sources of dump truck running speeds and considering the main factors affecting the earthmoving operation.

A VR-Trainer for Forklift Operation Safety Skills

  • Ahn, Seungjun;Wyllie, Mitchell J.;Lee, Gun;Billinghurst, Mark
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.122-128
    • /
    • 2020
  • This research investigates how a Virtual Reality (VR)-based simulation could be used to train safe operation skills for forklift operators. Forklift operation is categorized as high-risk work by many occupational health and safety regulators and authorities due to high injury and fatality rates involved with forklifts. Therefore, many safety guidelines have been developed for forklift operators. Typically, forklift operation safety training is delivered based on instructional texts or videos, which have limitations in influencing people's safety behavior. Against this background, we propose a VR-based forklift simulator that can enable safe operation skills training through a feedback system. The training program consists of several modules to teach how to perform the basic tasks of forklift operation, such as driving, loading and unloading, following the safety guidelines. The system provides instantaneous instructions and feedback regarding safe operation. This training system is based on the model of "learning-by-doing". The user can repeat the training modules as many times as necessary before being able to perform the given task without violating any safety guidelines. The last training module tests the user's acquisition of all safety skills required. The user feedback from several demonstration sessions showed the potential usefulness of the proposed training system.

  • PDF