• Title/Summary/Keyword: construction operation management

Search Result 1,050, Processing Time 0.024 seconds

A Study on Weights of the Factors to Evaluate Competency of Construction Engineer (건설기술자의 공통역량 측정 인자 및 가중치에 관한 연구)

  • Choi, Hye-Mi;Choi, Sun-Hee;Kim, Young;Park, Chan-Sil
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.225-229
    • /
    • 2007
  • Construction projects heavily rely on construction engineers competency, and instant judgment and problem solving ability against unpredictable situation directly affect the success of construction project. Therefore in order to hire construction engineers that are competent to lead construction projects successfully, the construction engineer competency evaluation is essential from the selection process. Hence, this research proposed items to assess the operation competency of construction engineers by deducing influence factors necessary to measure operation competency via interviews with experts and applying the factors. After conducting survey questionnaire utilizing analytic hierarchy process(AHP) for the proposed operation competency measurement items, weighted values were assigned.

  • PDF

Applications of bridge information modeling in bridges life cycle

  • Marzouk, Mohamed M.;Hisham, Mohamed;Al-Gahtani, Khalid
    • Smart Structures and Systems
    • /
    • v.13 no.3
    • /
    • pp.407-418
    • /
    • 2014
  • The purpose of this paper is to present an Integrated Life Cycle Bridge Information Modeling that can be used throughout different phases of the bridge life cycle including: design, construction, and operation and maintenance phases. Bridge Information Modeling (BrIM) has become an effective tool in bridge engineering and construction. It has been used in obtaining accurate shop drawings, cost estimation, and visualization. In this paper, BrIM is used as an integrated tool for bridges life cycle information modeling. In the design phase, BrIM model can be used in obtaining optimum construction methods and performing structural advanced analysis. During construction phase, the model selects the appropriate locations for mobile cranes, monitors the status of precast components, and controls documents. Whereas, it acts as a tool for bridge management system in operation and maintenance phase. The paper provides a detailed description for each use of BrIM model in design, construction, and operation and maintenance phases of bridges. It is proven that BrIM is an effective tool for bridge management systems throughout their life phases.

An Efficient Operation Scheme for the Material Procurement System in Construction Firms (대형 건설업체 자재수급관리시스템 효율적 운영방안)

  • Kim Tae-Gyum;Park Jong-Hyouk;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.299-302
    • /
    • 2003
  • Recently the timely delivery and the appropriate management for construction materials are of great significance in that the buildings are getting complicated and more various materials need to be handled. However, these systems have some problems, and do not seem to work effectively yet. The reason is that the lack of operation scheme for systematic management in project. In this study the efficient scheme for the .material procurement system in construction firms to manage the construction materials efficiently was discussed.

  • PDF

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF

Construction performance assessment framework by means of construction simulation for earthwork operations

  • Kim, Yujin;Noh, Jaeyun;Ko, Yongho;Lee, Jaewoo;Han, Seungwoo
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1194-1201
    • /
    • 2022
  • The existing literature has witnessed the importance of productivity assessment and deducing factors affecting it. However, yet many models have shown limitations in practical applications in actual construction sites for process planning due to uncertainty and lack of data. This research presents a productivity assessment and database generation framework using simulation and compares the results with RSMeans to derive appropriate equipment combinations alternatives for earthwork operations. Data of 15 different conditions was collected from 5 different construction sites. Prediction accuracy above 90% were achieved for the simulation models with average error rate of 7.4%. The construction productivity assessment framework presented in this study is expected to be highly applicable to operation planning for earthwork operations.

  • PDF

A study on the safety supervision team's efficient using at construction site (건설현장에서의 안전감시단의 효율적 활용에 관한 연구)

  • Gang, Yong-Tak;Kim, Chang-Eun
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • s.37
    • /
    • pp.74-83
    • /
    • 2006
  • As there are more accidents which are more serious in construction site than other industries, it needs the safety management system to be SLIM on the same time, there are still lots of difficulties to prevent those accidents exactly, so it also needs a safety supervision team to prevent the accident, unsafe operation and condition before happening, which is also called as a Man-to Man safety management method. The range of the job site in one personnel's management is very big and large, so it needs the personnel to deep watch the safety operation and prevent any unsafe/fire accidents; the personnel also should find out the unsafe points in the job site, and carefully supervise the dead angle site, then support the totally safety management POINT and realize the ZERO accident.

  • PDF

3D Ground Terrain Processing Platform for Automated Excavation System

  • Kim, Seok;Kim, Tae-yeong;Park, Jae-Woo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.669-670
    • /
    • 2015
  • Efficient management of the construction heavy equipment is required to reduce the rate of carbon emissions and on-site accidents. The intelligent excavation system (IES) will improve the construction quality and productivity through information technologies and efficient equipment operation, especially in large earthwork projects. Three-dimensional digitized ground data should be required for identifying the path of heavy equipment and work-site environment. Rapid development of terrain laser scanners (TLS) is more readily to acquire the digital data. This study suggests the '3D ground terrain processing platform (3DGTPP)' including data manipulating module and analyzing module of the scanned data for intelligent earthmoving equipment operation. The processing platform consists of six modules, including scanning, registering, manipulating, analyzing, transmitting, and storing. 3D ground terrain processing platform presented in this study will provide fundamental information for intelligent excavation system (IES), which will increase the efficiency of earthworks and safety of workers in significant.

  • PDF

Satisfaction Level of Construction Quality Management by Survey of The Field Staffs (현장 실무자 대상 조사에 의한 건설공사 품질관리 관련 만족도에 관한 고찰)

  • Park, Hyeong-Geun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.34-45
    • /
    • 2009
  • In domestic, the Quality Management system of construction work has been compounded of the association of regulation which is ground for relevant law and operation of Quality Management system by ISO/KS A 9001(QMS) established by the contractor. Two quality guaranteed systems must be operated with complementary and integrated system, but we can not make full use of QMS of contractor and only run routinized quality management system in all construction project by the standard, methods, process provided in the law. These problems were demanded better condition in the past ten years, since the ISO standards have been introduced. Establishing preventive consideration of quality management by setting a goal of drastic quality guarantee is an urgent problem of construction industry. This study is quick to fellow, which should do three things. 1. The attitude survey related quality management of staff in charge in construction site has run. 2. Base on these results, we adjust satisfaction measurement about operation of construction quality management system. 3. Subsequently, we want to offer our thesis about advanced opinion for the next.

A Study on the Safety Operation and Evaluation of Unconventional Oil Plant (비전통오일 시설물의 안전성 운용확보 및 평가에 관한 연구)

  • Jin-Woo Jung;Young-Woo Na;Neung-Won Yang
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.11 no.4
    • /
    • pp.576-581
    • /
    • 2023
  • In this study aims to provide operational guidelines based on risk assessment and safety evaluation in the operation of non-traditional oil production plants, serving as alternative resources in comparison to conventional oils within the construction sector. Presently, operational facilities within these plants are active. However, integrating comprehensive management through sectional and device-specific diagnostic and evaluation systems in similar platform-based operational management systems proves to be a challenging reality. Consequently, this research introduces an evaluation methodology tailored for an operation-centric management system using an integrated management approach, and evaluates its practical applicability within the construction field.

A Study on the Setup Model of Safety Management Information System in the Construction Management (건설산업관리(CM)에서 안전관리정보시스템 구축 모델에 관한 연구)

  • 김영수;강경식
    • Journal of the Korea Safety Management & Science
    • /
    • v.5 no.3
    • /
    • pp.45-55
    • /
    • 2003
  • Construction Management(CM) system, which was introduced some years ago to large national construction projects, such as the construction of Incheon New Airport, construction of high-speed railroad and World Cup stadiums, is considered to be still in its early stage and safety at each step of CM is very poorly controlled. In an attempt to improve such inferior safety control of domestic CM, this study analyzed safety control operation system in CM home and abroad and suggested a model for the construction of safety control management information system suitable to the conditions of Korea.