• 제목/요약/키워드: construction operation management

검색결과 1,050건 처리시간 0.157초

Risk Analysis of Lifting Work for Risk Assessment of Modular Construction (모듈러 건축 현장의 위험성평가를 위한 양중작업 위험요소 분석)

  • Jun, Young-HUN;Kim, Kyoon-Tai;Jeon, Eun-Bi
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.291-292
    • /
    • 2021
  • In modular construction, it is insufficient for safety management of workers, and workers are still exposed to the risk of accidents due to work at high places for lifting and assembly work in modular construction sites. Therefore, it is necessary when preventive safety management through risk management of workers on modular construction sites. This study is a basic study for the risk assessment(checklist) of modular construction, and the purpose of this study is to analyze the risk factors of the module lifting work at the modular construction site. It is intended to identify the hazard risk factors and improvement measures of the existing lifting operation, by analyzing the case of the risk assessment of the existing RC method, and to identify the risk factors for each work process when lifting the module. In the future, the results of this study are expected to be utilized in the development of checklists for risk assessment as safety management plan for modular construction sites.

  • PDF

Risk Identification and Management Strategies for BIM Projects

  • Ng, Ron C.W.;Cheng, Jack C.P.;Das, Moumita
    • International conference on construction engineering and project management
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.103-113
    • /
    • 2020
  • The construction industry is undergoing a digital transformation in which Building Information Modelling (BIM) is a key technology. The potential of BIM in several areas such as design optimization, time management, cost management, and asset management/facility management (AM/FM) is widely acknowledged by the AECO (Architecture, Engineering, Construction, and Operation) industry around the world. However, BIM implementation in construction projects is faced with problems such as project delay and cost overruns. The lack of identification of risks in BIM projects and standard guidelines on mitigation techniques furthers poor performance, dissatisfaction, and disputes between employers and project participants, which results in low BIM adoption rates. Therefore, the objective of this paper is to identify the potential risks in BIM implementation under the primary categories - (1) technical, (2) contractual, (3) management-related, and (4) personnel-related risks in BIM projects and present solutions to reduce, manage, and mitigate risks. To meet the objective of this paper, a survey was designed and conducted in the Hong Kong construction industry in which over 140 respondents from different disciplines, with experience in BIM projects, have participated. Based on the analysis of the survey data, the most severe and frequently occurring BIM risks and their potential mitigation strategies were identified and discussed in this paper.

  • PDF

A Study on Problems and Improvement of Disaster Prevention Technology Guidance(Focused on construction disaster) (재해예방 기술지도의 문제점과 개선방안에 관한 연구 (건설 재해를 중심으로))

  • Roh, Tae-Woo;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • 제18권4호
    • /
    • pp.47-55
    • /
    • 2016
  • Recently, industrial accidents rate has been gradually decreasing due to the development of safety management methods, but until now, the accident rate in the construction sector is higher than other industries. Large-scale construction sites are operating systematic safety systems to reduce industrial accidents. However, small and medium sized construction sites do not have systematic safety system and lack safety management ability, so that disaster is not reduced compared with large scale construction site. As a result, disaster prevention technology instruction system has been implemented to reduce the disasters of small and medium scale construction sites. However, in the case of a small construction site less than 2 billion won, there is little decrease in the accident rate, and in some cases, the accident rate increases. After the technical guidance system has been implemented, it is necessary to identify the performance and problems of implementation and to improve its effectiveness. In this study, we suggest the improvement plan to improve the efficiency of the technical guidance system by analyzing the problems and actual conditions of technical guidance operation in small and medium sized construction work sites.

A Modified-AHP Method of Productivity Analysis for Deployment of Innovative Construction Tools on Construction Site

  • Kwon, Soonwook;Lee, Gaeyoung;Ahn, Dooyong;Park, Hee-Sung
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권1호
    • /
    • pp.45-50
    • /
    • 2014
  • Productivity analysis is the most important and significant method for evaluating management and engineering performance during whole project stage. However, it is very difficult in developing qualitative index to construction industry comparing to other industries. Therefore, analytical hierarchy process (AHP) is one of the methods for overcoming these limitations by checking consistency index using duality comparison. In this study, it is scraped up an application plan and selection for innovative tools by analyzing survey results on tool users and site managers with respect to using Modified-AHP performance measurement method.

A Study on The Management of A Building by Applying RFID/USN (RFID/USN의 적용을 통한 건축물 관리 방안)

  • Ju, Hyun-Tae;Kim, Kyung-Hwan;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.331-336
    • /
    • 2007
  • The importance of a building management is embossed at construction industry and the concernment about a lengthening longevity and a efficient management of construction project is concentrated. At present, a study about maintenance management of existing building is progressed and normal papers concentrate in partial construction project for showing management method. This paper proposes Management method that make use of RFID/USN at the whole course of construction project that is composed plan, design, supply, construction, operation, maintenance management and so on. First of all, this paper analyzes process and applicable scope of RFID/USN at construction project. At each step, use scope, location, method and so on are decided at plan, design step and equipment, human power, materials and so on are established at supply step. real time progress, human power, safety, material, equipment management and so on put in operation at construction step and building is managemented real time by established sensor tag and wireless sensor network. This paper want to helps efficient project progress and management and presents convenience of maintenance management.

  • PDF

An Improved Scheme of Domestic Project Management Information System through Case Studies of Subway Construction in D. Area (국내 PMIS 사례분석을 통한 개선방안 - D지역 지하철 현장을 중심으로 -)

  • Kim Jin-Gyu;Hyun Kyung-Mi;Kim Whan;Kim, Ok-Kyue
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.380-383
    • /
    • 2004
  • Recently, by the growth of IT industry, the domestic construction is tried to spread with IT on the whole phases: 1)an, design, order, construction, and maintenance. On this, in the construction industry, is accelerated effort of the introduction of PMIS, it has various types of PMIS applied which is developed alone by large construction company and serviced with web-hosting by ASP corporation. In this study, through the analysis of PMIS which has applied on the subway construction in the D city, try to propose the improvement proposals and put out realistic problems. Therefore that analysis about needs of the order and operation of the phases, Domestic PMIS cases and International PMIS technique position have to consider and, the system is analyzed to needs of the order, design scheme, and utilization. On the basis of this result, the improvement proposals is proposed into the case of the contract, the system, the operation, the management and the contact of the external system.

  • PDF

A Study of Methods on Safety Checklist Improvement and Integrated Operation with Schedule for Construction Accident Prevention (건설공사 안전사고 예방을 위한 안전관리 체크리스트 개선과 공정관리와의 연계운영 방법)

  • Yang Yong-Cheol;Choi Hoon;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • 제5권2호
    • /
    • pp.123-135
    • /
    • 2004
  • Construction accident have been increasing in despite of safety management activities and education in construction site. This study surveyed safety organization, education, safety management, scheduling, safety checklist with construction firms in order to grasp the actual condition. A improved method is suggested that safety checklist is supplemented with various safety materials and then stored as database. Furthermore, safety checklists are connected and operated with schedule in ender to more efficiently prevent construction accidents.

Management of RAMS for Railway System in view of System Life Cycle (시스템 수명주기 관점에서의 철도시스템 RAMS 관리 방안)

  • Lee, Chang-Hwan;Park, Byoung-Noh;Ahn, Heon-Chan
    • Proceedings of the KSR Conference
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.221-225
    • /
    • 2011
  • The railway system consists of many items such as sub-systems, equipments and parts to accomplish the required function. Also the railway system is very complex system that these items are connected with interface among items. According with this complexity, the process of system engineering is applied to the construction of new railway project to manage systematically. In addition, the research about system engineering is progressing in recent. The RAMS management is one part of system engineering, and is to assure the required safety and performance. Also, this RAMS should be managed through system life cycle. This paper show the case study of management of RAMS during construction and operation phase in respect of system life cycle. As a result of this research, the best way of RAMS management based on system engineering in operation phase for railway system is suggested.

  • PDF

Analysis of Curriculum Management for Building Construction in Domestic Universities (국내 대학의 건축시공 교육과정 운영실태 분석)

  • Lim, Hyeong-Eun;Kim, Eun-Ho;Kim, Jae-Yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.76-77
    • /
    • 2019
  • Currently, there is a lack of studies on the directionality of architectural engineering education. This study has analyzed the opening and operation of courses relating to building construction in Korea universities. It was researched that the most common building construction courses opened in universities were 'building construction' and 'materials.' Courses are also being opened in universities by reflecting social demands. Upon analysis of the operation of the educational process of building construction, it was displayed that projects and examinations were conducted as the methods of assessment in courses at many universities. Additionally, there were universities that included quizzes and discussions in their methods of assessment. This study is expected to be used as data for studying an innovative means of educating architecture.

  • PDF

The problem of using BIM data for facility management (시설물 유지관리를 위한 BIM데이터 전달의 문제점)

  • An, Hyo-Kyung;Lee, Seul-Ki;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.139-140
    • /
    • 2012
  • Facility Management (FM) is a project phase to maintenance and to increase the qualities of product which is planned on the design phase and ensured on the construction phase. In addition, since the approximate time occupied in operation and maintenance phase is the longest from construction project as total approximate cost is about 85% of whole the project, it could be managed and realized primarily. The information of facility is not created on the specific point of project, but it might be created on the whole process of subject project widely. Thus, as the information could not be lost and it can be delivered into computer aided facility management system, it is necessary to manage the facility information. This paper proposed the necessities and the problems of BIM-based data interoperability on the Korean construction projects.

  • PDF