Modeling Laborers' Learning Processes in Construction: Focusing on Group Learning

  • Lee, Bogyeong;Lee, Hyun-Soo;Park, Moonseo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.154-157
    • /
    • 2015
  • Construction industry still requires a lot of laborers to perform a project despite of advance in technologies, and improving labor productivity is an important strategy for successful project management. Since repetitive construction works exhibits learning effect, understanding laborers' learning phenomenon therefore allows managers to have improved labor productivity. In this context, previous research efforts quantified individual laborer's learning effect, though numerous construction works are performed in group. In other words, previous research about labor learning assumed that sum of individual's productivity is same as group productivity. Also, managers in construction sites need understanding about group learning behavior for dealing with labor performance problem. To address these issues, the authors investigate what variables affect laborers' group level learning process and develop conceptual model as a basic tool of productivity estimation regarding group learning. Based on the result of this research, it is possible to understand forming mechanism of learning within the group level. Further, this research may contribute to maximizing laborers' productivity in construction sites.

  • PDF

An Experimental Study on The Bolted Connection Between H-Beam and Precast-Concrete Column (PC 기둥-H형강보의 볼트접합부에 관한 실험적 연구)

  • 조은영;박순규
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.11a
    • /
    • pp.181-185
    • /
    • 2003
  • The composite structural system with reinforced concrete column and steel beam has some advantages in the structural efficiency by complementing the shortcomings between the two systems. The system, however, has also a lot of problems in earthquake-proof capacity and construction process because it is wet method of construction. So, this paper proposed PCS(Precast Concrete Column and Steel Beam) structural system with dry method of construction. Purpose of this study is to enhance merit and control failure mechanism by installing Dog-Bone on H-beam.

  • PDF

An Analysis of the Mechanism of Crack Stop-bar for Floor Plastering of Apartment Buildings (공동주택 바닥미장 균열차단막의 메커니즘 분석)

  • Song, Yong-Sik;Lee, Dong-Hoon;Lee, Sung-Ho;Kim, Sun-Kuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.4
    • /
    • pp.333-344
    • /
    • 2011
  • The recent expansion in the number of housing construction projects has been accompanied by substantial improvements in construction quality, which can be attributed to the development of new construction technologies and materials. In apartment complex construction projects, numerous mechanization technologies have been adopted as part of the floor plastering process to counter increasing difficulties in securing labor and the pressing need to reduce lead time, but these have also triggered setbacks such as additional costs or loss of time to fix cracks in or loosening of floor. Cracks developing in the floor of an apartment housing unit, in terms of materials in use, are the products of a complex combination of material makeup, construction workmanship, concrete curing and the protection method. Controlling such elements from the perspective of materials in use may ensure partial success in reducing cracks, but fall short of eliminating them completely. Any attempt to prevent cracks from developing in the first place requires systematic analysis as to their potential causes and viable solutions to reduce them. On this backdrop, this paper aims to provide an analysis of potential causes of cracks found in floor plastering, and consider the mechanism of a crack stop-bar as a fundamental safeguard against them.

A Development of Mechanism on Supply Chain Information Recognition among intelligent equipment for USN based construction supply chain management process (차세대 지능형 건설물류관리 프로세스 지원을 위한 지능형 장비 간 물류정보인식 메커니즘 개발)

  • Kwon, Sang-Hyuk;Shin, Tae-Hong;Chin, Sang-Yoon;Kim, Yea-Sang;Kwon, Soon-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.763-766
    • /
    • 2008
  • The success of a construction project depends on efficient construction supply chain and service informationalization as types and quantities of materials in construction industry geometrically increase because the size of the construction industry increasingly becomes huge, high-rise, and complex. However, the omission of data for each step and the lower effect occurs because of uncertainty and inaccuracy of information as compared to other industries. In addition, it takes many hours to manage the present material states. Currently, IT technology and various mobile devices are being developed through the automation system of next generation intelligent construction supply chain management for the effective supply chain information management but the confusion regarding the recognition and transmission of the supply chain information between the multiple materials and transportation equipment using the IT and wireless network technology occurred. Therefore, the objective of this study is to propose the recognition mechanism which can deduce processes which caused the confusion of the recognition and transmission with supply chain information and solve the problems originated from the processes so as to solve the problems related to the confirmation and the communication of the correct supply chain information.

  • PDF

Effect of construction sequence on three-arch tunnel behavior-Numerical investigation

  • Yoo, C.;Choi, J.
    • Geomechanics and Engineering
    • /
    • v.15 no.3
    • /
    • pp.911-917
    • /
    • 2018
  • This paper concerns a numerical investigation on the effect of construction sequence on three-arch (3-Arch) tunnel behavior. A three-arch tunnel section adopted in a railway tunnel construction site was considered in this study. A calibrated 3D finite element model was used to conduct a parametric study on a variety of construction scenarios. The results of analyses were examined in terms of tunnel and ground surface settlements, shotcrete lining stresses, loads and stresses developed in center column in relation to the tunnel construction sequence. In particular, the effect of the side tunnel construction sequence on the structural performance of the center structure was fully examined. The results indicated that the load, thus stress, in the center structure can be smaller when excavating two side tunnels from opposite direction than excavating in the same direction. Also revealed was that no face lagging distance between the two side tunnels impose less ground load to the center structure. Fundamental governing mechanism of three-arch tunnel behavior is also discussed based on the results.

A CP-BASED OPTIMIZATION MODEL FOR CONSTRUCTION RESCHEDULING PROBLEMS

  • Shu-Shun Liu;Kuo-Chuan Shih
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.941-946
    • /
    • 2005
  • It is essential for project managers to make schedule adjustment based on their professional experience, in terms of rescheduling action discussed in this paper. This paper discusses the topics of resource-constrained construction rescheduling by modifying the concepts of manufacturing rescheduling. Moreover, the influence factors of construction rescheduling problems are investigated and identified in this paper. According to initial schedule plan and present progress, a new rescheduling mechanism based on Constraint Programming (CP) techniques is developed to reschedule projects with the objective of minimizing total project cost or duration, under three rescheduling policies. Through case study, the behavior of three different rescheduling policies is analyzed and discussed in this paper.

  • PDF

Steel Plant Construction (EPC) Project Case Study : Forensic Lessons-learned Analysis and Systems Engineering Improvement Recommendation

  • Kyung-Bae Jin;Young-Ho Kim;Eul-Bum Lee;Suk-Hwan Seo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.145-150
    • /
    • 2013
  • As a recent global trend, the majority of mega-size plant projects are delivered through EPC (Engineering, Procurement and Construction) contracts, where a single contract is awarded for engineering, procurement, and construction. Under this contracting mechanism, it is challenging for contractors to carry out the projects under traditional project management processes used in design-bid-build projects. A new EPC Plant, the POSCO Special Steel Plant in Changwon, was built successfully at the beginning of 2012 and it is currently in full-scale production. The project has encountered a number of major difficulties however, with some technical and managerial issues through its development process. As summarized in this paper, the authors (as project participants with the contractor) investigated it as a post construction analysis and recorded the Lessons-learned for future project management improvement.

  • PDF

Design of Multilayered Suspension Mechanism for Differential Type Mobile Robot

  • Park, Jin-Ho;Roh, Se-Gon;Park, Ki-Heung;Kim, Hong-Seok;Lee, Ho-Gil;Choi, Hyouk-Ryeol
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2003.10a
    • /
    • pp.859-864
    • /
    • 2003
  • This paper presents a design for the novel suspension mechanism of a two-wheeled mobile robot having two casters which is used for indoor environment. Although the indoor environment is less rough than the outdoor one, the fixed caster mechanism has some problems such as causing the robot to be immovable because robot's driving wheels do not have contact with the ground. Therefore, we tried installing a spring-damper suspension mechanism to keep driving capability and to remove pitching phenomenon. However, this suspension mechanism also has the problem, which the robot body inclined by disturbances does not return to the initial position. To deal with above problems and to accomplish desired performances, we designed the Multilayered Suspension Mechanism, which has springs and dampers working partially according to the inclined angle and angular velocity of robot body concerned with pitching. To analyze design, the equations of motion describing their dynamics were developed. Using the equations, simulation results show the improved performance. We confirm the usefulness of the Multilayered Suspension Mechanism by construction and test of a actual prototype.

  • PDF

A Study on Optimal Lead Time Selection Measures of the Construction Materials (건설자재의 적정 리드타임 산정에 관한 연구)

  • Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.1
    • /
    • pp.105-110
    • /
    • 2004
  • Resource procurement is an important management area because cost of resource covers 40% of total construction project cost and resource delivery has direct relationship with project performance. Integration of cost provides various potentials for effective and efficient project control. This study investigates the usefulness of time in resource procurement management focused on materials. These days, construction projects have characterized manufacture because of industrialization and component. Therefore, application of systematic resource planning has been requested in the construction. There are many companies conducting procurement of resource on the web by applying MRP, ERP etc. in the construction. However, in applying them in the construction yet, there is obstruction. MRP has the character doing its function under accurate cost prediction of resource. But prediction of resource is difficult in industry mechanism of the construction. If accurate cost prediction of resource is possible in the construction, it will be expected to reduce cost of procurement of resource substantially by applying successful resource planning model in the manufacture. On the basis of recent current, the purpose of study is to present procurement of resource system that period observance of construction and minimization of stock is possible by reflecting accurate lead-time to apply proactive thought to be able to cope with alteration of construction schedule efficiently in analyzing resource planning of the construction site.

A Study on the Usage of STEP data on the Construction CALS/EC Environment - Focusing on linking the Drawing Information and Material Information - (건설 CALS/EC 환경에서의 STEP 데이터 활용방안에 관한 연구 - 도면정보와 자재정보 연계 중심으로 -)

  • 서종철;김인한
    • The Journal of Society for e-Business Studies
    • /
    • v.8 no.1
    • /
    • pp.121-139
    • /
    • 2003
  • Currently, it is not popular to use the STEP based product information in the construction drawing files, in spite of the importance and possibility of using various product data in drawing files on the CALS/EC environment. This paper aims to demonstrate a construction drawing information management system based on ISO 10303/STEP. To achieve this aim, the authors have analyzed the current construction drawing information classification hierarchy widely used for domestic and international, and examined the material data connection mechanism within CAD drawing data, and finally investigated the management systems for construction documentations and drawings in a public companies. Therefore, the expected benefit of the proposed system is that STEP drawing information management will be done standardization and the information of STEP construction drawing can be managed, shared and supported design business through materials data connection.

  • PDF