• Title/Summary/Keyword: construction markets

Search Result 246, Processing Time 0.023 seconds

Capability Evaluation for Improving Competitiveness of the Korean Construction Firms

  • Kwon, Nahyun;Park, Moonseo;Lee, Hyun-Soo;Son, Bo-sik;Jang, HyounSeung;Kim, Jin-Woo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.746-747
    • /
    • 2015
  • Recently, Korea has achieved accumulated total value of orders of six hundred billion dollars in international construction market, and it is facing a new turning point by entering the overseas construction market. However, according to the statistics on the current internal construction market, the accumulated value of orders has been mainly obtained by plant projects in the Middle-East area. To improve international competitiveness of Korean construction industry, it is required to expand and diversify the target areas and construction business sectors. To expand markets, each construction firm should establish the expansion strategy and assess the capability which includes the strength and weakness of their firm. Therefore, this research aims to evaluate the capability of the Korean construction firms for overseas expansion. Through the research, Korean construction industry is expected to strengthen competitiveness toward the overseas markets. Furthermore, this research contributes to expanding and diversifying markets for domestic construction firms.

  • PDF

FUTURE STRATEGY FOR KOREAN FIRMS INVOLVED IN OVERSEAS MARKETS

  • Rak-Keun Jeon;Jin-Woo Park;Jun-Youl Choi;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.389-396
    • /
    • 2005
  • Despite very good reputation that Korean construction industrial firms had enjoyed until early 1990's in overseas markets, their participation abroad drastically declined after the delivery of two(2) million unit-housing project in the early 1990's and the foreign currency crisis that took place in the late 1990's. The revival of booming construction industry in domestic market is far beyond the expectation due to the long recession of the construction economy and government's severe restriction against real estate development. Under such crucial circumstances, the construction industrial firms' strategy to survive is the more active business promotion in overseas markets. However, the Korean construction industrial firms have to abandon the labor intensive strategy, through that they have enjoyed until the early 1990's, and turn to management oriented strategy which may be a new prosperous horizon and a new challenge as well, because the labor cost of newly developing countries is much more competitive. The aim of this study is to suggest how to cope with current market situations through a chronological survey based on the cost data prevailed during four decades from the 1960's until the 1990's in overseas markets.

  • PDF

Investing for the Future: A Comprehensive Study of the Southeast Asian Construction Markets

  • Chun, Hwikyung;Yoo, Jinhyuk;Chi, Seokho;Cha, Heesung
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.459-462
    • /
    • 2015
  • Korean construction industry made a huge growth over several decades. However, domestic construction market has shrunk in recent years due to the domestic political environments and global economic crisis. Today, the international construction markets become more important to be investigated, and demands for international construction study have risen. The purpose of this study is to search for measures to compare the potential of Southeast Asian countries' construction markets and select strategic target countries where the Korean construction companies pursue to explore for future investments. The research team investigated a range of selection factors which can represent the construction market condition of each country. These factors included the size of the construction industry, economic growth potential, current relationship with Korea, the level of infrastructure development, political situation, etc. After collecting data, each selection factor was scored by experts' analyses and the total score was given to each country. As a result, the rating identified attractive countries for future investments: Myanmar, Vietnam, and Sri Lanka. For the target countries, analytical methods were used for in-depth market analysis that can provide comprehensive insight and strategic clue for development of short-/mid-/long-term roadmap and action plans. The research findings would be used to support rational decision making of construction investment advancing to the Southeast Asian economic growth.

  • PDF

THE CAUSES OF BAD PROFIT IN OVERSEAS CONSTRUCTION PROJECTS

  • Seung Heon Han;Du Yon Kim;Sang Hyuk Park
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1237-1243
    • /
    • 2005
  • International construction projects are exposed to various and complicated risk factors stemming from different political, economical, social, and cultural backgrounds, which make contractors entering into international construction to experience severe losses. It implies that overseas markets do not necessarily secure the high return, which is typically expected to in the high risky attempts. Accordingly, contractors need to evaluate various risk factors faced with overseas construction projects that can possibly aggravate the profitability. This paper aims at establishing a valid groundwork for further research on developing the integrated risk management model. For this end, it analyzes the long-term trend of profitability on total of 3,487 projects performed by Korean global contractors in world-wide construction markets during the last four decades. Then, it investigates the possible factors/causes of bad profit that have affected the profitability significantly through the structured surveys of 90 real overseas projects based on the project-specific information and experiences of Korean contractors in overseas markets. Furthermore, it analyzes relative importance of these factors/causes and identifies the important features expected for the risk management of international construction projects. Finally, vital distinctions between success and failure projects and lessons learned to improve profitability are then distilled.

  • PDF

Analysis of critical failure factors on the causes of profitability in international construction projects (해외건설사업의 수익성 인자분석에 관한 연구)

  • Sun Seung-Min;Ryu Ho-Dong;Jeon Ji-Ho;Han Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.306-310
    • /
    • 2002
  • Agreements such as the Uruguay Round and the New Round have dramatically changed international construction markets. The globalization of the construction industry provides tremendous opportunities for construction industry, while it generates the complex skeins of risks to contractors wllo would like to expand into new foreign markets. According to ENR, recently about $13.9\%$ of contractors that entered international construction markets have experienced loss in projects and furthermore, their average profits have also declined continuously. Accordingly, contractors need a strategic risk management system for assessing various risks and improving Profitability for overseas construction projects. This paper discusses the long-term trend of profitability performed by Korean contractors in international construction markets during the last 35 years. Then, it identifies the key factors that affect the profitability significantly through the structured surveys from 59 actual overseas projects. These factors can be used for developing a risk management system for international construction project.

  • PDF

THE BUSINESS STRATEGY INNOVATIONS OF THE TOP DESIGN FIRMS IN GLOBAL DESIGN & ENGINEERING MARKET

  • Seok-In Choi;Hyoun-Seung Jang;Young-Hwan Lee;Sang-Bum Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1223-1230
    • /
    • 2005
  • The dynamic nature of the A/E/C industry, rapidly changing global market environments, and lowest cost competitive bidding make it difficult to survive in global design markets. To understand the global design markets, a case study has been undertaken. The top 150 global design firms represented in the ENR (Engineering News Record) from 1995 to 2003 are classified into three groups for the case study. First group is the firms which advanced in rank from 1995. Second group is the firms which maintained its rank from 1994 until 2003. Third group is the firms which went down in rank from 1995 until 2003. However, finding key factors and changing business strategies of successful top design firms are the fundamental goals in this paper. After examinations of case studies, this paper concludes and suggests that professionalization, M&A strategies, patrons of the government, and academic support are needed to be successful in the global design & engineering industry.

  • PDF

A Study of Pre-assessment Framework for Business Environment for Delivering Projects in a New Overseas Market (해외 신규 시장의 프로젝트를 수행하기 위한 사업환경 사전조사 프레임웍에 관한 연구)

  • Oh, Jungkeun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.78-90
    • /
    • 2015
  • Due to a significant decrease in the number of construction projects in the domestic market of Korea, overseas expansion of the Korean construction companies has been accelerated in recent years. However, the practice of bidding at a low price and lacking information about foreign new markets caused many companies to fail in their entries to these markets. As a measure to prevent such failures, this study has developed a framework which first defines the key research items that must be identified beforehand and then classifies them into a structured way so that the construction companies can actually use this framework to be better prepared for their forays into the new markets. The framework was actually applied for a construction project in Morocco, and its usefulness was proven by the user's successful participation into the project, nevertheless the application and result was limited. Although perhaps this framework should be applied to many more construction projects for its validity to be verified and for its structure to be better standardized, the framework still has its value due to the following two reasons: first, it has systemized the research items that had been only conceptually defined but had never been organized, and second it can be utilized as a investigation tool at the marketing stage.

Analysis of the Capability of Korean Construction Companies for International Investment Development Business

  • Jang, Hyoun-Seung;Kim, Hwa-Rang
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.2
    • /
    • pp.112-121
    • /
    • 2013
  • Korean overseas construction has been on the rise, and exceeded the 2011 goal of $50 billion by securing $59.1 billion in orders. However, these orders were heavily concentrated in the Middle East (50%) and plant construction contracts (75%). This study suggests that, to maintain growth in foreign markets, Korea construction companies should enter into the high value-added investment development business and aggressively seek ways to diversify their regions of activity and construction types. To secure the entry of Korean construction companies into lucrative markets and better understand the competitive factors facing Korean construction concerns, a survey of the literature and focus group discussions targeting relevant experts were carried out. From those efforts, a list of 44 competitive factors crucial to entering and competing in the international investment development business was developed. Survey responses were analyzed by applying IPA. The results revealed that while Korean concerns compete well in engineering/technical capabilities, maintaining a cooperative relationship with contractors, and warranty/after sales service capabilities, their ability to obtain business information on the target country, to form private/public cooperative systems, and to build international human networks require immediate improvement.

Development of Electrical Safety Monitoring System for Conventional Markets (재래시장 전기안전 감시시스템 개발)

  • Lee, Sang-Ick;Kim, Gi-Hyun;Bae, Seok-Myung
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.58 no.4
    • /
    • pp.552-556
    • /
    • 2009
  • This paper in order to reduce the electric disaster damage which is caused by with electric equipment of conventional markets is introduced the electric safety monitoring system which is suitable in conventional markets. Investigate the actual conditions about electrical equipment of conventional markets, electrical safety monitoring system was constructed. Electrical safety monitoring system to verify the performance of the experiment was to build a test bed. Research results will be used with the data for the reliability security of the electric safe system operation which follows in the conventional markets actual proof equipment construction which will be advanced.

A Study on the Economic Analysis of LNG Combined Cycle Thermal Power Plant in Cost Based Pool Electricity Markets (변동비반영 발전경쟁시장에서 LNG-복합 화력발전소의 경제성 분석에 관한 연구)

  • Lee, Cheon-Ho;Han, Seok-Man;Chung, Koo-Hyung;Kang, Dong-Ju;Kim, Bal-Ho H.
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.8
    • /
    • pp.1327-1333
    • /
    • 2008
  • Since Cost Based Pool markets has been continued to power markets, Genco. needs economic analysis about investment in power plants. Particularly most Private Genco.s have presently a construction plan about LNG combined cycle thermal power plants. In this paper, we propose a economic analysis method of LNG combined cycle thermal power plants using Economic Dispatch and Optimal Power Flow in CBP markets. Also we develope computation model using it for decision making to build a plant. This method can consider a variation of power facility like power plants and transmission lines in CBP markets. Finally, this dissertation provides a relevant case study to confirm the effect of cost factor to economical efficiency.