• 제목/요약/키워드: construction management system

검색결과 4,741건 처리시간 0.037초

WEB-BASED GEOGRAPHIC INFORMATION SYSTEM FOR CUT-SLOPE COLLAPSE RISK MANAGEMENT

  • HoYun Kang;InJoon Kang;Won-Suk Jang;YongGu Jang;GiBong Han
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1260-1265
    • /
    • 2009
  • Topographical features in South Korea is characterized that 70% of territory is composed of the mountains that can experience intense rainfall during storms in the summer and autumn. Efficient planning and management of landscape becomes utmost important since the cutting slopes in the mountain areas have been increased due to the limited construction areas for the roadway and residential development. This paper proposed an efficient way of slope management for the landslide risk by developing Web-GIS landslide risk management system. By deploying the Logistic Regression Analysis, the system could increase the prediction accuracy that the landslide disaster might be occurred. High resolution survey technology using GPS and Total-Station could extract the exact position and visual shape of the slopes that accurately describe the slope information. Through the proposed system, the prediction of damage areas from the landslide could also make it easy to efficiently identify the level of landslide risks via web-based user interface. It is expected that the proposed landslide risk management system can support the decision making framework during the identification, prediction, and management of the landslide risks.

  • PDF

건설공사 공정관리이행의 리스크 감소를 위한 개선방안 (Improvement of Construction Process Control to Reduce Construction Risk)

  • 박홍태;손창백;강인석
    • 한국건설관리학회논문집
    • /
    • 제1권1호
    • /
    • pp.35-44
    • /
    • 2000
  • 효율적인 공정이행관리는 공사관리자에게 공기단축과 공사비절감을 위한 유용한 정보제공이 가능하도록 해야 한다. 그러나 국내의 공정이행관리는 공정관리 전산체계 적용상의 어려움과 내역ㆍ공정 연계가 가능한 공사정보분류체계 및 전산체계 부재 등의 요인들이 복합적으로 어울려져, 공사과정에서 발생되는 정보의 효율적인 관리가 어려운 점이 있다. 본 연구에서는 현재의 공정관리 운영실태와 공정관리 수행을 저해하는 전반적인 문제점을 기술적 측면과 운영상 측면의 항목별로 분석한 후, 문제점으로 인해 발생가능한 리스크를 감소시킬 수 있는 개선방안을 제시하였다. 개선방안은 내역과 공정이 연계될 수 있는 공사정보분류체계 및 전산체계의 구성과 관련된 긍정관리 기술적 방안을 위주로 하였으며, 기타 운영상 측면의 방안으로 구성되어 있다.

  • PDF

BETTER INPUTS FOR KNOWLEDGE MANAGEMENT INFORMATION SYSTEMS: KNOWLEDGE SHARING MODELING AND THE INCENTIVES SYSTEM DESIGN

  • S. Ping Ho;Yaowen Hsu;Szu-Wei Lo
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.564-568
    • /
    • 2005
  • Recently, Knowledge Management (KM) has been applied to construction industry. Surprising, there is few studies that address the most fundamental problem in KM: people may prefer not to share their knowledge so as to preserve their intellectual or unique values in the organization. Without the premise of each individual's willingness to share knowledge, there will be no valuable input for the IT system and, thus, no knowledge management at all. This paper aims to model the behavioral dynamics of knowledge sharing and to design an incentive system that may facilitate knowledge sharing for construction companies. In this paper, a game-theory based model will be developed, and the framework for designing an incentive system will be proposed according to the model.

  • PDF

Life-cycle Management를 활용한 공공시설 유지관리 시스템 개선방안 (A Study on the Improvement of Public Facility Management System Using Life-cycle Management)

  • 전익성;손정락;김경숙;김재준
    • 한국건설관리학회논문집
    • /
    • 제5권2호
    • /
    • pp.55-63
    • /
    • 2004
  • 유지관리 분야는 다른 단계에 비해서 법과 제도가 미비하고, 관계기관 및 건축주가 이에 대한 대비가 충분하지 못하여 건축물의 수명이 물리적인 수명에 훨씬 미치지 못하는 경우가 많이 발생하고 있다. 또한 건설제단계의 Life-cycle을 고려하면 전체 공용수명 중 유지관리단계가 전체의 $70\%$가량을 점유하고 있어서 건설산업의 합리화를 위에서 유지관리에 대한 관리체계의 정립이 필요하다. 그리고 현재 운용 중인 유지관리 시스템은 주로 하자발생시 이를 처리하는 하자대응시스템으로 운영되고 있으며, 다른 단계와의 정보 공유는 낮은 수준에서 이루어지고 있다. 공동주택을 비롯한 건축물과 관련된 우리나라의 기존 제도, 법규 및 정책 등은 신규 건설시장에 초점이 맞추어져 있어서, 기존 시설물을 효율적으로 관리하기 위한 체계는 아직 제대로 정비되어 있지 않고 있다. 따라서 본 연구에서는 공공시설물의 효율적인 $운영\cdot관리\cdot활용$을 위하여 공공시설물 유지관리 체계의 현황을 분석하여 시스템의 구축방향을 제시하며, 나아가 정부주도로 구축되고 있는 건설정보 시스템을 구축에 대응하여, 현행 유지관리 정보시스템의 발전방향과 개선방향을 제시하고자 한다.

정보화된 EVMS 구축을 위한 속성코드 연계모형 구성 연구 (A Study on the Connection Model for Attribute Code of Earned Value Management System)

  • 이우식;강인석
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.362-365
    • /
    • 2004
  • 본 연구에서는 EVM체계의 정보화 활용성 확보를 위해, 각 성과 정보들에 대한 그래픽 정보의 제공과 공정 및 공사비 정보의 효율적 통합을 위하여 필요로 하는 EVM 속성코드의 연계모형구성을 제안하고 있다. EVM 속성코드는 EVM관련 각종 정보들을 유형화하여 EVM정보관리의 활용성을 높일 수 있도록 제안하는 것이며, EVM정보를 구성하는 일반적 데이터들을 속성코드로 구성하였다. 본 속성코드 연계모형을 통해 EVM시스템 구축 시, EVM 관련 상세정보들의 추출, 정렬 및 그룹화가 가능하며 이로써 공사관리자로 하여금 보다 효율적인 실적정보관리가 가능할 것으로 기대된다.

  • PDF

블록체인과 빅데이터 기술을 이용한 건설 조달 관리 기초 연구 (A Basic Study of Construction Procurement Management using Block Chain & Big Data Technology)

  • 김기호;손승현;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.127-128
    • /
    • 2019
  • The cost of procurement in construction projects varies depending on the type of project, but the proportion of the cost component is very large. Therefore, efficient procurement system operation affects the success of the project. However, difficulties arise in procurement management due to problems such as availability of data due to limited information, inaccurate scheduling and integration of costs. Therefore, the purpose of this study is to develop a procurement management system to help efficient communication decision by combining Big Data which can analyze a lot of information and Block Chain technology which can secure information and record reliability to satisfy the above requirements. The results of this study are used to develop a system to develop academically improved procurement management system and practically to develop a system to secure business competitiveness and to facilitate rapid communication among project participants.

  • PDF

디지털 정보화를 통한 현장 자원 및 정보관리 기술에 관한 연구(PRIMA 시스템) (A Study on Project Resource & Information Management with Internet Application(PRIMA system))

  • 김외곤;이동렬
    • 한국건설관리학회논문집
    • /
    • 제2권1호
    • /
    • pp.88-97
    • /
    • 2001
  • 새 천년의 화두로 떠오른 인터넷은 건설업의 위상을 새롭게 정립할 수 있는 도구로 활발히 연구되고 있으며 건설 CALS의 실현을 통해 건설업도 고부가가치 및 첨단산업의 대열에 동참할 수 있을 것으로 여겨진다. 이미 인터넷 입찰체계 및 건설분야 전자상거래 시스템 도입 등 다방면에 걸쳐 건설업에서도 인터넷이 점진적으로 활용되고 있지만 좀 더 다양하고 실질적인 면에서의 인터넷 활용이 요구되고 있는 실정이다. 이에 최근 건설 상황변화에 대처하기 위한 신속한 의사결정 도구 및 효율적인 관리기법의 필요성이 절실히 대두되었고 PRIMA 시스템은 공사관리를 위한 신기술로 개발되었다. 이 시스템은 인터넷을 이용한 Just In Time(JIT) 관리기법, 노무$\cdot$안전$\cdot$작업 관리의 통합 어플리케이션, 실시간 데이터에 의한 의사결정 프로세스 세가지로 구성되어 진다. PRIMA시스템은 대형공사 현장에 적용되어 이미 그 실효성을 입증 받았으며 앞으로 인터넷 환경이 좋아질수록 특정 프로젝트만의 관리 방법이 아닌 범용적 관리 기술로 자리잡게 되어 현장의 규모 및 장소에 관계없이 그 활용은 점점 확대될 것이다.

  • PDF

Competency Level Evaluation for Construction Management in Southeast Asian Countries

  • Kwon, Nahyun;Park, Moonseo;Lee, Hyun-Soo;Son, Bo-Sik;Kim, Junyoung;Kwon, Byung-Gi
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.146-152
    • /
    • 2017
  • Recently, countries in the South-east Asia are making efforts to enhance the construction industry system and introduce the construction management system. However, it is challenging to apply construction management in site due to lack of technology and professionals for CM. This can result in frequent safety accidents, cost overrun, schedule delay, etc. Therefore, it is necessary to carry out a clear evaluation of the overall situation regarding the level of technology and required competency. The objective of this research is to investigate on which management skills and items for CM are required to improve the construction management skills in South-east Asian construction industry. As a result of the questionnaire, most of the officials selected that the design phase and the construction phase are important works, and the engineers evaluated activities during the bidding phase, the design phase and the construction phase as important works for construction management. However, in most of the results, it was observed that the current competency of Vietnam construction is insufficient compared to the evaluated importance of the skills. This can be explained by the fact that they are not capable of managing construction projects effectively as compared to the importance. The results can help to realize the inadequate aspects of local construction industry, which will be the basis of improvements. Also, it is expected to be supportive to improve construction management in the countries and also provide indicators related to work stage or technology that should be acknowledged when establishing the advancing strategy for Southeast Asian countries in the future.

  • PDF

국내 건설공사 현장의 하도급관리 개선방안 - 하도급자의 품질업무 전문화를 통하여 (A Improvement of Sub-contractor Management in Domestic Building Construction Sites - Through Specialized Quality Work of Sub-contractors)

  • 손현덕;이재섭
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.292-295
    • /
    • 2002
  • 하도급관리는 하도급업체를 전문화, 계열화하여 성공적인 건설프로젝트를 수행하는데 있다. 품질관리에서 하도급관리는 하도급업체의 ISO9000시리즈의 품질시스템의 도입에서 그치는 것이 아니라 활성화가 이루어질 수 있도록 하여 효율화를 기하고 체질 개선을 하는 것이 필요하다. 따라서 본 연구에서는 하도급자가 ISO9000시리즈의 풀질시스템을 유지하는데 저해 요인을 TQM(Total Quality Management)의 개념을 응용한 설문조사로 분석하여, 개선을 위하여 하도급관리자인 원사업자의 역할을 모색해 보았다.

  • PDF

IT를 활용한 공조설비의 온라인 유지관리시스템 개발 (A Development of the On-line Maintenance and Management System for the HVAC system Using IT)

  • 이태원;김용기;강성주;우남섭
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2008년도 하계학술발표대회 논문집
    • /
    • pp.48-53
    • /
    • 2008
  • The performances of the building service equipment relay on the individual superintendent's share for the assessment of performance, fault detection, deterioration diagnosis of the building service equipment. A major use of building energy management system(BEMS) is for monitoring plant and building's energy consumption. National building management system (N-BMS) presented in this study links buildings into a network group in order to monitor and control the buildings. How to construct the N-BMS was considered to save energy resource and to conserve performance of building service equipment. The FEMIS, facility, energy/environmental management & information system, for building service offer management process integrated with BAS, FMS and EMS and so on.

  • PDF