• Title/Summary/Keyword: construction facilities

Search Result 2,712, Processing Time 0.027 seconds

Risk Assessment of Mechanical Parking Facility during Construction based on AHP Analysis (AHP 분석을 이용한 기계식 주차설비 건설 중 위험성 평가방안 연구)

  • Lee, Jeong Han;Kim, Yong Gon;Lee, Jae Won;Kim, Jong Hoon
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.5
    • /
    • pp.33-41
    • /
    • 2022
  • As the number of automobile registrations increases yearly, parking spaces that are located in downtown areas are increasing, and mechanical parking facilities are also increasing. Therefore, there is a high risk of accidents when installing and repairing a mechanical parking facility. In the preceding six years (from 2012 to 2018), the statistics that pertain to accidental disasters indicated that a total of 137 disaster victims were generated by the construction sector, 33 accidents occurred, and 10 people died. However, only the safety management items pertaining to accidents that occur during maintenance work and the use of the installed mechanical parking facilities are being studied; furthermore, there is no ongoing research with respect to the risk management that is conducted at the construction site. In 2017, the Korea Occupational Safety and Health Agency (KOSHA) announced the "Guidelines for Safe Installation and Maintenance of Mechanical Parking Equipment"; however, it is a safety guideline that is limited to the installation of basic protective equipment and to facility installation. There is no model for mechanical parking facilities that is indicated in the "Risk Assessment Model by Construction Industry Type", which is issued by the Safety and Health Corporation and is widely utilized for risk assessment in the construction industry; moreover, elevator installation work CODE N0: 22 is the only major example of a disaster. In this study, "risk assessment through a focus group interview" was performed, and data was derived from the "risk assessment of Article 41 (2) of the Industrial Safety and Health Act", which reflects the characteristics of the construction industry based on AHP analysis. The results of this study can be utilized for the risk assessment that is conducted during the construction stage of mechanical parking facilities.

An Example of Ordering a Bid of Design and Construction as One Package - A new construction of graduate students' dormitory and foreigner.researchers' house of Seoul National University - (설계.시공(設計.施工) 일괄(一括) 입찰(入札)(턴키방식(方式)) 발주(發注) 사례(事例) - 서울대학교(大學校) 대학원기숙사(大學院寄宿舍) 및 외국인.연구원숙소(外國人.硏究員宿所) 신축(新築) 공사(工事) -)

  • Chung, Jae-Sung;Choi, Jung-Hee
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.7 no.4
    • /
    • pp.66-71
    • /
    • 2000
  • PDF

A Study on the Improvement of Asset Management System for Education Facilities (교육시설물 자산관리시스템 개선방안)

  • Moon, Hyun-Seok;Kwon, Bang-Sung;Hong, Tae-Hoon;Hyun, Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.227-232
    • /
    • 2008
  • Recently, Operators of Facilities perform Asset Management for extending life-cycle of Facilities. Moreover government recommend Asset Management for educational facilities through the statute as promotion law for educational facilities business, regulations of operating educational facilities business. Operators of Education Facilities also have recognized Asset concept of the educational facilities, and established and operated each systems. However, OO university isn't performing Asset Management efficiently because of absence of own structure system and Asset Management system. Therefore, this study analysed the present condition of Asset Management of OO university, and offered basic references that efficiently improve the present Asset Management and suggest not only the reasonable operation but also management organization.

  • PDF

A Basic Study on the Development of Filling Material using Seismic Retrofit of Masonry Architectural Wall Systems in Educational Facilities. (교육시설물의 조적치장벽체 내진보강에 적용 가능한 충전재 개발 기초연구)

  • Lee, Joo-Hyeong;Oh, Jun-Seok;Jeon, Sang-Sub;Son, Ki-Young;Na, Young-Ju
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.180-181
    • /
    • 2019
  • South Korea has long been without major earthquakes. But 317 public facilities have been damaged by Po-Hang earthquake. Among them, 103 educational facilities suffered 25.6 billion won worth of damage. This is the most damaging of public facilities. The earthquake damage was mainly centered on non-seismic retrofit educational facilities and masonry architectural wall systems installed on the outer walls of buildings. Therefore, the purpose of this study is to develop a filling material that can be applied to the non-seismic retrofit of masonry architectural wall systems installed on the outer walls of educational facilities. To achieve the objective, first, set the filling material requirements. Second, set the sequence model of experiments and prepare for the experiment. Third, after the experiment, analyze the results obtained through the experiment. Forth, the optimal filling material is selected by comparing the analyzed results with the requirements. As a results, E-S-X sample using epoxy resin were selected for the seismic retrofit of masonry architectural wall systems in educational facilities. In the future, this study can be used as a basic material for developing seismic reinforcement methods guidelines in domestic existing educational facilities.

  • PDF

Development of Configuration Management Methodology for Rocket Development Test Facilities (발사체 개발 시험시설의 형상관리 방법론 개발)

  • Jeon, Chanmin;Choi, Minchan;Park, Taekeun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.31-41
    • /
    • 2023
  • This study is a study to develop a configuration management methodology for efficient and systematic management in the event of configuration changes such as deformation, explosion, and remodeling of launch vehicle development test facilities, which are emerging as important national facilities in the era of full-scale space competition. Through the analysis of international standards for configuration management, a configuration management process framework to be applied to launch vehicle development test facilities is extracted, a survey was conducted on experts who performed life cycle engineering of launch vehicle development test facilities, and a configuration management methodology optimized for operation/management of domestic launch vehicle development test facilities was proposed. Identify the configuration for launch vehicle development test facilities, the configuration management manager, configuration management organization, and configuration management board approve/process the configuration changes, and after construction is completed according to design requirements, launch vehicle development test facilities try to manage the configuration in a controlled state.

3-D Temporary Facility Visualization Using BIM(Building Information Modeling) Technology

  • Kim, Hyun-Joo;Ahn, Hong-Seob;Kim, Woo-Young
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.2
    • /
    • pp.37-42
    • /
    • 2011
  • The key role in safety management is to identify any possible hazard before it occurs by identifying any possible risk factors which are critical to risk assessment. It is well known that falsework (temporary facilities) in construction projects is fundamentally important. This planning/assessment process is considered to be tedious and requires a lot of attention due to the following reasons: firstly, the installation and dismantling of those facilities are one of the high risk activities in the job sites. Secondly, temporary facilities are generally not clearly delineated on the building drawings. Therefore, it is our strong belief that safety tools have to be simple and convenient enough for the jobsite people to manage them easily and be flexible for any occasions to be occurred at various degrees. In order to develop a safety identification system of temporary facilities, this research utilizes the BIM technology in retrieving important information by importing data from BIM models and use it in the safety planning stage.

Integration Technique of Smart Infra Management for Smart City Construction

  • Yeon, Sangho;Yeon, Chunhum
    • International Journal of Contents
    • /
    • v.15 no.2
    • /
    • pp.75-78
    • /
    • 2019
  • The Integration technique of combining the measurement method with the fine precision of the sensor collecting the satellite-based information to determine the displacement space is available to a variety of diagnostic information. The measurement method by a GNSS with the sensors is needed since there will always be occasional occurrence of natural disasters caused by various environmental factors and the surroundings. Such attempts carried out nationally by distributed torsional displacement of the terrain and facilities. The combination of the various positioning analysis of mm-class for the facility of main area observed is required constantly in real time information of the USN/IoT Smart sensors and should be able to utilize such information as a precisely fine positioning information for the precisely fine displacement of the semi-permanent main facilities. In this study, for the installation of the receiving system, the USN/IoT base line positioning are easily accessible for the target bridges. Transmitting hourly from the received data is also executed in real time using the wireless Wi-Fi/Bluetooth bridges and related facilities to automatically process a fine position displacement. The results obtained from this method can be analyzed by real-time monitoring for a large structure or facilities for disaster prevention.

Management Method in the Education Facilities of the Construction Process through Value Engineering(VE) Case Study (VE 사례분석을 통한 교육시설 건축공사 단계별 관리방안)

  • Kim, Hag-Joo;Mun, Gwang-Bae;Go, Seong-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.129-132
    • /
    • 2012
  • Value Engineering(VE) process is going to make a series of improvements for the effective construction project management or optimal proposal to improve quality, performance improvement, cost reduction and customer satisfaction. For making the quality model based on better than the architecture that is required in the VE, such a project promoting creative plan, functionality and constructability reflecting the materials and improved construction methods and building life cycle for reviewing the smooth progress of the construction projects may be necessary for management techniques. This study is to establish a management plan in the educational facilities construction process through education institution's recent orders completed by VE case study.

  • PDF

Acquiring the International Availability of Construction Manager System in the Global Environment (세계화시대에서의 감리기술자제도의 국제통용성확보에 관한 연구)

  • Moon, Haeng-Kyu;Yang, Jae-Soo
    • Journal of The Institute of Information and Telecommunication Facilities Engineering
    • /
    • v.8 no.4
    • /
    • pp.163-169
    • /
    • 2009
  • Recently, the concern of the FTA (Free Trade Agreement) have shifted to the promotion of the professional service's trade via the bilateral and reciprocal agreement of its professional laws. In the construction industry, this policy has intended to make the standardization of the construction manager's profession in the world. The purpose of this paper is 1) first to define the general model of professions in the U.S., UK and Japan, 2) then to declare the construction manager's model of the profession in them to apply the general model of professions, and 3) finally to analyze the identity of Korean construction managers and acquirement of its construction manager's law comparing with construction manager's model of the profession in the U.S., UK and Japan.

  • PDF

A Basic Study for Finding Methods to solve the Crisis of Construction Industry caused by Deterioration of Liquidity (유동성 악화에 따른 건설산업 위기극복 방안 모색을 위한 기초연구)

  • Kim, Eun-Sung;Lee, Sang-Hyo;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.131-135
    • /
    • 2009
  • Domestic construction industry is facing big difficulties by a worldwide financial crisis. Especially the deterioration of liquidity by the reject of banks for project financing and unsold housing project made a big problem on financing for the ongoing and new projects. To solve this, it is critical for construction companies. banking facilities and public organizations to cooperate and support each other. In this study, the methods which each part can do are investigated. Construction companies can do a price reduction, finance condition improvement for deposit and down payment, asset sale and cost reduction. And Public organizations can buy the assets of construction companies with proper price and ease the regulation to activate transactions of real estate. In the case of Banking facilities, they can support arrangement and liquidation of insolvent projects and so on.

  • PDF