• Title/Summary/Keyword: construction facilities

Search Result 2,712, Processing Time 0.029 seconds

A Study on modular construction method in military facilities (모듈러 공법을 적용한 군시설공사의 개선방안에 관한 연구)

  • Park, Jae-Sig;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.642-647
    • /
    • 2006
  • Recently Ministry of National Defense is reconstructing old facilities using modular construction method for enhancing soldiers' quality of living. In the future, the use of modular construction method is expected to be increased. But in beginning stage as ROK military facilities that was built by modular was not designed and constructed efficiently, problems for pilot projects need to be analyzed by phases and construction methods should be improved. For the maximized efficiency, design should be made to minimize on-site works, factory automation in an assembly plant should be installed for the better productivity, roads that will be used for transportation should be checked, and joint and connection methods between modules in on-site assembly should be improved for a better quality.

  • PDF

A Study on the Analysis and Estimation of the Construction Cost by Using Deep learning in the SMART Educational Facilities - Focused on Planning and Design Stage - (딥러닝을 이용한 스마트 교육시설 공사비 분석 및 예측 - 기획·설계단계를 중심으로 -)

  • Jung, Seung-Hyun;Gwon, Oh-Bin;Son, Jae-Ho
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.25 no.6
    • /
    • pp.35-44
    • /
    • 2018
  • The purpose of this study is to predict more accurate construction costs and to support efficient decision making in the planning and design stages of smart education facilities. The higher the error in the projected cost, the more risk a project manager takes. If the manager can predict a more accurate construction cost in the early stages of a project, he/she can secure a decision period and support a more rational decision. During the planning and design stages, there is a limited amount of variables that can be selected for the estimating model. Moreover, since the number of completed smart schools is limited, there is little data. In this study, various artificial intelligence models were used to accurately predict the construction cost in the planning and design phase with limited variables and lack of performance data. A theoretical study on an artificial neural network and deep learning was carried out. As the artificial neural network has frequent problems of overfitting, it is found that there is a problem in practical application. In order to overcome the problem, this study suggests that the improved models of Deep Neural Network and Deep Belief Network are more effective in making accurate predictions. Deep Neural Network (DNN) and Deep Belief Network (DBN) models were constructed for the prediction of construction cost. Average Error Rate and Root Mean Square Error (RMSE) were calculated to compare the error and accuracy of those models. This study proposes a cost prediction model that can be used practically in the planning and design stages.

The Hydro-Environmental Characteristics of Port Facilities around the Sea of Cheju Island (제주해역 항만시설물의 수리환경적 특성에 관한 연구)

  • 정태욱;김종인;류청로
    • Journal of Ocean Engineering and Technology
    • /
    • v.14 no.3
    • /
    • pp.1-10
    • /
    • 2000
  • In order to effective manage the construction, disaster prevention plan and the harbor tranquility control, meteorological and sea-state characteristics around Cheju Island have been analyzed. Using results and damage examples of the port facilities under severe sea conditions, a reasonable construction control plan considering the regional characteristics of the sea-state and winds was proposed. That is, in northern part of Cheju Island, the construction work is affected mainly by the winter storms, while the typhoon mainly affects the southern part port facilities during summer to Autumn. Considering their typical characteristics, it is strongly suggested that the main construction work should be carried out during April to July in the northern part, and it should be made during October to next July in the southern part of the island. A permeable TTP mounded breakwater was constructed to protect severe waves as a temporal structure under the long-term development plan in Sogipo port. The transmission characteristics of the structure was discussed using the experimental results. The results show that the transmission coefficient $K_{t}$ is over 20% of incident waves, which cause many problems in the cargo handling in relation to harbor tranquility. In conclusion, this kind of permeable structure can be used only as a temporal structure for the disaster prevention under the construction process. It causes many problems in harbor tranquility if it is used as a permanent harbor structures.s.

  • PDF

A Study on development of Assesment System for BTL Project;Prediction of Reasonable Construction and Maintenance Cost in Education Facilities. (합리적 교육시설물 유지보수 및 공사비 예측을 위한 BTL 적격성 평가 시스템 개발에 관한 연구)

  • Son, Jae-Ho;Kim, Jae-On
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.111-116
    • /
    • 2006
  • The objective of this research is to develop an assesment system for BTL Project. A new method for the prediction of construction and maintenance cost in the educational facilities has been considered and under development by the authors. This paper explains the current BTL assesment method used by most local district office of education and lists its potential problems. Main conceptual modules in the new Assesment System are shown in this paper. Also, viable results of each module are discussed in this paper.

  • PDF

A Disaster precaution and efficiency improve of labor by promotion of Emotional Safety Culture of laborer (근로자의 감성안전문화조성에 의한 작업능률 향상 및 재해 예방)

  • Kim, Joon-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.473-477
    • /
    • 2006
  • In domestic construction site, convenient facilities for worker are much lacking up to now. These things exert negative influences in the occurrence of construction disaster because a safety-aware of worker-self is been lacking ultimately, and 3D(Dirty Dangerous Difficult) evasion phenomenon for construction site spreads more to workers and actuality that is going through manpower problems may be heavier. This research applied sensitivity safety cultural institutions that make aware of worker's sensitivity in spot to search solution way of these problems from resource of human original nature. By the result, there were affirmative sides that sensitivity safety cultures facilities make created a safety-aware during work to worker-self. Also, these facilities gave as member of a constituent by workers, it examined that become many helps in operation efficiency.

  • PDF

A Study of Planning and Application of Fire Protection Facilities in Remodeling (리모델링시 소방시설의 계획 및 적용에 관한 연구)

  • Jung, Jin-Ho;Yun, Myung-O;Je, Jin-Ju
    • Fire Science and Engineering
    • /
    • v.22 no.5
    • /
    • pp.90-98
    • /
    • 2008
  • There are diverse barriers such as limits to space, time, economy, technology, institution, and etc. in remodeling construction compared to new construction and it needs to overcome such limits. Consequently, for effective performance of construction, planning and application fit for remodeling characteristics shall be made available in time and various studies into remodeling for each construction category are necessary to achieve this. Taking these into account this study conducted research of the followings to draw out necessary steps for planning and application of fire protection facilities in remodeling, to overcome various barriers that may arise during any project operations, and to provide useful materials for construction of reasonable and effective fire protection system.

Life Cycle Cost Evaluation Index Enhancing of Public Facilities (공공시설물의 LCC 평가기준 개선방안)

  • Gu, Bon-Hak;Kim, Tae-Hui;Kim, Ok-Gyu;Park, Tae-Keun;Lee, Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.412-415
    • /
    • 2007
  • Recently advanced nations utilize evaluation system about LCC, and KOREA begin to introduce the system to reduce construction expense. And Introducing "Technical proposal type bid" that is new government construction order mode made needs for valuation of price to evaluate facilities LCC. These days LCC is evaluated by BTL and turnkey project in KOREA, but it is suffering from difficulty in evaluation. because evaluation element and standard are indefinite. In addition LCC evaluation of public construction business except BTL and turnkey is not consisting. Therefore, in this research we present LCC evaluation Index for systematic and objective evaluation.

  • PDF

A Case Study on the Serious Accidents of Construction (건설중대재해 사례 연구)

  • 장동일;이명구
    • Journal of the Korean Society of Safety
    • /
    • v.11 no.1
    • /
    • pp.108-120
    • /
    • 1996
  • It is a problems in industrial accidents that the knowledge for industrial accidents is obtained by experience, not by experiment. This experiential knowledge is obtained by Investigating accident cases and utilizing those for safety education. Therefore, in this paper, the situation about the serious accident of construction is analyzed by occupation, a kind of construction, time group, season, type of accident, and accidental cause. And the mutual · relations of these factors are studied. The most frequent type of the serious accidents of construction Is the falling accident. It happenes most frequently at apartment construction among kinds of construction and to structural worker, finishing worker, normal worker in order among occupations. And it is found that the most critical causes of the falling accident are the imperfection of safety facilities and unwearing of protection equipments, so a number of accidents can be reduced by the expansion of safety facilities and wearing of protection equipments absolutely. The counterplan of prohibition of accidents and the direction of government policy are presented by a series of nalyses for accident cases.

  • PDF

Revision of related Regulations and Construction Standards for the Use of Information on Underground Facilities Quality Level (지하시설물 품질등급 정보의 활용을 위한 관련 규정 및 건설기준 개정 방안)

  • Park, Joon Kyu;Kim, Tae Hoon;Kim, Won Dae
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.40 no.4
    • /
    • pp.343-350
    • /
    • 2022
  • The computerization project for underground facilities in Korea began in earnest after the city gas explosion in Seoul in 1994, and the Daegu subway explosion in 1995. As such a large-scale gas explosion accident caused enormous economic loss including human casualties and potential benefits, the need for computerized for efficient management of underground facilities was greatly emphasized in society. Meantime, computerization of underground facilities has been carried out according to the basic plan for building national geographic information system. In this study, problems were identified based on the current status of construction and management of underground facility information, as well as laws and regulations, and directions for establishing quality standards were presented. In addition, construction work standards such as 「Public Survey Work Regulations」, design standards, standard specifications, and technical specifications, gas technology standards, design standards, and communication works so that underground facility information can be linked and utilized in construction work by examining the linkage of the underground facilities, the targets that can be used for quality level information on underground facilities were derived, and a proposal to revise the construction standards was presented. In the future, if the quality standards are established, it is expected that the accuracy and utilization in the construction field will be increased.

Case Study for the Stability of Temporary Shoring Facilities at Inchon International Airport (가시설 안정성 검토에 관한 인천국제공항 시공 사례 연구)

  • 최인걸;조현모;류승철
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.03a
    • /
    • pp.97-104
    • /
    • 1999
  • This case study has been prepared to provide the practical data about construction of temporary shoring facilities (i.e. braced sheet pile excavation) and to utilize the case study information effectively for design and construction of future facilities. This case study includes information such as 1) installing measurement devices to monitor the deformation of the sheet pile walls and the subsoil in the vicinity after establishing the criteria for the sheet pile deflection; 2) monitoring the actual movement of the temporary facility after setting up the survey control standard (due to the movement of the temporary facility) : 3) inspecting the suitability of the temporary facility construction: and 4) analyzing and studying the result of the tension test after installing ground anchors.

  • PDF