• Title/Summary/Keyword: construction expenses

Search Result 291, Processing Time 0.028 seconds

Daegu Urban Railroad Line No.3 Vehicle System Selecting (대구도시철도 3호선 차량시스템 선정)

  • Jeon, Bae-Un;Yoo, Je-Nam;Lee, Ung-Hee
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1105-1114
    • /
    • 2007
  • Recently the urban railroad which is under plan and construction in domestic is under consideration Light Rail Transit mostly with the alternative against excess of working expenses of Midium Rail Transit(subway), inefficient transportation problem etc. It come to a conclusion that the application of the light rail transit is proper from reserve feasibility study and approval process of Master plan in Daegu urban railroad Line No.3 Based on hereupon, carried out the detail investigation for optimum system selection which suitable for Daegu urban circumstance in process of master plan can satisfy the working expenses decided in national expenditure support project.

  • PDF

- A Study on Construction of Production Logistics Information System in the Small Business - (중소기업형 생산물류정보시스템 구축에 관한 연구)

  • 양광모;박진홍;강경식
    • Journal of the Korea Safety Management & Science
    • /
    • v.5 no.2
    • /
    • pp.155-164
    • /
    • 2003
  • In this regard, the newly focused logistics information system makes reducing the expenses of whole logistic available by cutting down the expenses of materials, transportation and stock and also, it allows the company to cut down the procurement expense through the reduced lead-time and rationalize producing plans by eliminating the uncertain orders and fluctuation in procurement. It further more optimizes the efficiency of over all productions by meeting the dead line for delivery to the customers. In the recent environment of globalization where fierce competitions exist between manufacturers, logistics plays important role in the strategies of companies, and managements of companies try their best efforts in establishing the strategy to accomplish the innovative relationship between supply chain channels. Therefore, in this study, we try to suggest the model of consolidated logistics system that is integrated logistics information system with suggesting the better way of logistics and comparative analysis with logistics system to resolve the difficulties numbers of companies face after realizing what logistics information system is in Korea.

A Study on Construction of Production Logistics Information System using APS(Advanced Planning & Scheduling) (APS(Advanced Planning &Scheduling)를 활용한 생산물류정보시스템 구축에 관한 연구)

  • 김동진;양광모;박재현;강경식
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2003.11a
    • /
    • pp.93-96
    • /
    • 2003
  • In this regard, the newly focused logistics information system makes reducing the expenses of whole logistic available by cutting down the expenses of materials, transportation and stock and also, it allows the company to cut down the procurement expense through the reduced lead-time and rationalize producing plans by eliminating the uncertain orders and fluctuation in procurement. It further more optimizes the efficiency of over all productions by meeting the dead line for delivery to the customers. In the recent environment of globalization where fierce competitions exist between manufacturers, logistics plays important role in the strategies of companies, and managements of companies try their best efforts in establishing the strategy to accomplish the innovative relationship between supply chain channels. Therefore, in this study, we try to suggest the model of consolidated logistics system that is integrated logistics information system with suggesting the better way of logistics and comparative analysis with logistics system to resolve the difficulties numbers of companies face after realizing what logistics information system is in Korea.

  • PDF

An Empirical Approach Study on Construction Cost Estimation in Public Work Projects (공공사업 예정공사비에 대한 실증적 접근)

  • Yoo, Chang-Kyu;Song, Jeong-Gyu;Lee, Yun-Sun;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.1
    • /
    • pp.65-73
    • /
    • 2009
  • Looking at current construction costs estimations of publicly declared public works, there are many instances where estimation criteria are ambiguous and doesn't imply the reality. Up to date, estimation criteria for calculating construction cost estimations are simply by unit area multiplication and stochastic construction cost estimation. However, possibility of making errors are high due to using uniform data that excludes each public work's specifications and environmental conditions. Further, on the aspect of cost management, there is certain limitation in the efficiency of cost management in order-placing stage and commencing-work stage; while efficient cost management and reduction of expenses are highly possible during initial stages of the project. In this respect, the paper adopts positive approach with regards to construction cost estimations of public works and draws common elements from calculation tables of the construction cost estimations from 3 completed domestic construction works; after which, the paper analyzes whether business exposition, construction guide and publicly-declared estimated construction costs that the orderer issued are calculated economically and properly; deducing problems in the process, the paper seeks to recommend rational calculation method on this.

A Study on Evaluation of Optimal Construction Method of BTL Projects - Focused on Educational Facilities - (BTL 적용 교육시설의 최적 건축공법 평가에 관한 연구)

  • Park, Yoo-Young;Cho, Bong-Ho;Kim, Ki-Hyun;Lee, Chun-Kyong;Park, Tae-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.22-31
    • /
    • 2009
  • In the buildings of educational facilities ordered by BTL projects, the competent authorities, private business, and users of school get to have a deep conflict, due to extra expenses resulted from shortening of construction period and establishment of temporary school building, and inconveniences users of school have to undergo during semester. This study aims at solving immediate problems in the aspect of construction method, proposing several alternative plans, including RC construction method generally applied to construction of the existing school, and modular construction method that is emerged as an alternative method for educational facilities lately, along with the method of construction appropriate for BTL projects of educational facilities, calculating cost of construction required for each alternative plan, analyzing and evaluating period of construction.

A Status Analysis on the Field Management of Professional Construction Firms after Abrogation of Construction Participants System (시공참여자제도 폐지 이후 전문건설업체의 현장관리 실태분석)

  • Park, Kyoung-Hun;Kim, Hwa-Joong;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.199-203
    • /
    • 2009
  • After the construction participants system is abolished, expectations are high for its consequences such as liquidating paper-companies, holding back low price contracts, and improving multi-stepwise subcontract structure. However, the professional construction firms have been took responsibilities and obligations as businessmen employing the chief workmen and construction workers. For this reason, it is expected that they will be charged a great deal of expenses such as increase in labor management services and laborers, the occurrence of an retirement grants, insurance fees, etc. Since the hold on power of field managers are getting weaker toward the construction workers, it is most likely to have loss in efficiency of production in the long term. Therefore purpose of this research is to analyze difficulties and the point at issues with which professional construction firms are undergoing after abolishing the construction participants system by investigating on the actual condition in the field management. For this research, we got a grip on the actual condition and analyzed the rise of a primary factor on reinforced concrete construction.

  • PDF

A Study on the Remodeling Construction Execution Strategy of General Hospitals in Korea (국내 종합병원의 리모델링 공사수행전략에 관한 연구)

  • Kim, Ha-Jin;Yang, Nae-Won
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.11 no.1
    • /
    • pp.33-41
    • /
    • 2005
  • The construction can proceed in different ways according to the acquired profitability of the hospital during the construction and to the features of departments or areas. This study is an analysis of remodeling construction processes to resolve major tasks of remodeling. The remodeling strategies gained from this study can be summed up as follows: 1) Remodeling work in hospitals involves the acquire relocation of space through extensive area renovations and then moving back to the space, and lastly working on the empty space. Thus, it is more advantageous in terms of construction work to demolish the existing buildings than to acquire the relocation space through extensions or renovations. That is, demolition after the maximum utilization of the existing buildings is the most desirable in terms of space availability. 2) The construction methods for remodeling are two: a method of carrying out construction by dividing the plane areas into several individual ones and of working on it floor by floor. In case of ward areas, and the outpatient area, the construction proceeds after securing the relocation space and partially setting construction areas in order to minimize the decrease in profitability due to the smaller number of beds and treatment rooms during construction. If the outpatient diagnosis/ treatment area and the supply area relocate together with the ward areas, there may be extra expenses. Thus, doing construction by area, while partially operating those areas or after relocating the whole areas.

  • PDF

A Study on Safety Management Indicators for Landscape Construction Field (조경시공현장 안전관리 항목에 관한 연구)

  • Park, Jae-Young
    • Journal of Environmental Science International
    • /
    • v.31 no.7
    • /
    • pp.653-663
    • /
    • 2022
  • Research activities and discussions on specialized areas reflecting the specificity of landscape construction are necessary. Therefore, this study was conducted with the purpose of presenting basic data for efficient field management by deriving items necessary for safety management in landscape construction fields through experts' opinions. A survey was conducted using Delphi analysis to derive "management items" and "safety management items according to landscape type" for landscape construction field safety for a total of 15 landscape construction specialists. The survey results showed that four top items were derived from the "management items" for the safety of landscape construction fields; they include: "safety and health management organization and education," "industrial safety and health management expenses," "payment of personal protection," and "establishment of safety measures." In addition, two to five items for each higher item appeared and resulted in a total of 13 lower items. Personnel, organization, budget, etc. for safety management are always required in the field, and the monitoring part of whether these elements are working was also taken up as a management item. In the "Management items according to each landscape construction" a total of eight landscape type were distinguished, they include: 'Reinforced concrete work', 'Masonry work', 'Plaster's work', 'Waterproof work', 'Stone masonry work', 'Pavement work', 'Facilities work', and 'Planting work'. Furthermore, two to seven sub-items for each construction type were derived, and a total of 35 management items were presented.

Analysis of the Work and Cost of Supervisor in the Public Construction Corporation (공공발주처의 공사감독 업무영역과 비용 분석)

  • Cho Seong-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.146-152
    • /
    • 2003
  • In the construction project, construction supervisor influences greatly the construction managements such as process management, quality management, safety management, and cost management. Therefore, from the first stage of the project, the managing activities of the supervisor are consistently needed. But the assesment of supervisor's work and cost has not been made enough in the public construction project. And there have been doubts as to whether a supervisor can take a consistent managing activity from the early stage of the project. Accordingly, the works between Korean supervisor and foreign supervisor in their public corporations are analyzed and compared in this paper. And the evaluation is made each of the cost for supervisor and the cost for engineer as a substitute of supervisor in construction project. This study is believed to contribute to improving the supervisor's work and reducing the personnel expenses and construction indirect cost.

The Predetermined Amount Estimation for the Standardization of Construction Cost Estimating System Focusing on the School Work (실적공사비 적산제도 표준화를 위한 예정가격 산정 -학교공사를 중심으로-)

  • Park, Keum-Soon;Jung, Sung-Gwan;Park, Kyung-Hun;You, Ju-Han
    • Current Research on Agriculture and Life Sciences
    • /
    • v.26
    • /
    • pp.31-43
    • /
    • 2008
  • Introduction of construction cost estimating system is necessary to promote appropriate reflection of construction cost and simplified and efficient amount work. The results of this study are as follows. In the results of considering the basic concept and composition of a construction type estimating system, an example orders are concentrated on an apartment house in the country. The building appurtenant work of extension work is high(1.52) as compared with others. In regression analysis for a construction cost, the models are as follows. In a new construction work, (construction cost)=$12,004.8+4.09{\times}$(building area), and in extension work, (construction cost)=$-121.9+4.50{\times}$(building area). Accordingly, this study wishes to compare and analyzes main contents of original cost method and results cost method, and propose predetermined amount estimation device through existent literature study investigation for accumulation of the construction cost.

  • PDF