• 제목/요약/키워드: construction expenses

검색결과 291건 처리시간 0.032초

건설안전관리비 산정 프로그램 개발 (Program development for composition of construction safety management expenses)

  • 홍성만;이정기;박범
    • 대한안전경영과학회지
    • /
    • 제4권2호
    • /
    • pp.23-32
    • /
    • 2002
  • The small-and-medium sized construction sites are in weak state of safety management because of the variable working environments, the lack of safety techniques and the weak economic conditions, and industrial accidents of these sites were occupied 60% of the total construction accidents. Recently, the safety engineer's number are not to be enough at the small-and-medium sized construction sites. Therefore, the safety engineer's works are addition to more and more. This paper is a development of the integrated program which using composition of construction safety management expenses. It is an management tool which helps to saving time of construction safety engineer. A method of development composition, to used Brain Storming for a place of meeting to construction safety management counselors.

원심성형 중공 PC기둥의 경제성 평가 (Economic Evaluation of the Centrifugal Formed Shell PC Columns)

  • 박진영;양원직;유홍식;이원호;오상훈
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2009년도 춘계 학술대회 제21권1호
    • /
    • pp.163-164
    • /
    • 2009
  • 본 연구는 최근 건설현장에서 쓰이는 부속공정으로 많은 공사비와 공사기간을 필요로 하는 철근 콘크리트 공법과 접합부의 보강문제에 있어서 많은 노력을 요구하는 PC공법의 단점을 보완하기 위하여 중공PC공법의 도입을 제안하며, 본 공법의 현장 적용성에 대한 경제성 평가를 하고자 한다.

  • PDF

일제강점기 「고건축물」 보존수리 공사비용 운용시스템에 관한 연구 - 「보존비공사」와 「보존비보조공사」 분류체계에 대하여 - (A Study on Operation Systems of Preservation & Repair Expenses for Architectural Heritage in Japanese Colonial Era - Focused on Classification of Preservation Cost Construction & Preservation Cost-Aided Construction -)

  • 서동천
    • 헤리티지:역사와 과학
    • /
    • 제50권4호
    • /
    • pp.82-103
    • /
    • 2017
  • 일제강점기 고건축물 보존수리 공사에 관한 공사비를 운용하는 시스템은 크게 둘로 나뉜다. 고건축물의 소유권에 따라 보존비 공사와 보존비보조공사로 구분된다. 보존비 공사는 관유 건축물, 즉 조선총독부가 소유권과 관리권을 갖는 고건축물에 대한 보존 수리를 의미하며, 보존비보조공사는 사찰 등의 개인이 소유권을 가지고 있는 사유 건축물의 보존수리를 의미한다. 관유 건축물 보존수리의 경우, 조선총독부가 주체가 되어 보존수리를 시행하였으므로 예산집행과 관리감독의 주체가 동일하다. 왕릉 및 유물, 구 관청, 향교, 일부 서원 등이 여기에 속한다. 반면 사유 건축물의 보존수리는 사유재산을 대상으로 하는 만큼 조선총독부는 보존수리의 허가에 대한 권한이 있을 뿐이다. 소유자 측에서 보존수리를 요청하면 조선총독부는 보존수리비를 지원할지 결정하고 이를 관리 감독하는 역할을 하게 된다. 사찰이 소유하는 불당 및 탑, 그리고 개인 및 문중이 소유하는 사원 및 사당이 여기에 해당한다. 따라서 관유 고건축물은 조선총독부의 예산 안에서 지출되므로 보존비 공사로 분류되고, 사유 고건축물은 조선총독부의 보존보조비 예산 안에서 지출되므로 보존비보조공사로 분류된다. 보존비공사와 보존비보조공사는 주체가 다르므로 공사시행 절차에서 다소 차이가 드러난다. 제출하는 서류의 종류, 현장감독의 역할 등 행정 절차상의 차이가 두드러진다. 이러한 양분된 시스템은 일제강점기 내내 개선되지 않은 채로 남게 된다. 조선총독부는 식민지 정부였으므로 일본 정부의 영향을 많이 받았다. 일본은 대부분의 건축 문화재가 사찰과 신사 소유였고, 관유 건축문화재가 거의 없었으므로 조선총독부와는 달리 일원화된 체제였다. 조선총독부의 고적 및 유적 관련 시스템은 당시 한국의 정황에 맞게 형성되기보다 일본의 영향 하에서 형성되었다. 따라서 문화재 보존수리 비용의 양분된 체계 속에서도 조선총독부는 뚜렷한 해결방식을 제시하지 못하였다. 이는 당시 식민지 정부인 조선총독부의 한계가 보이는 부분이라 할 수 있다.

설계도서 변경에 의한 실 공사비의 책정에 관한 연구 (The Research About Suitability of The Cost of Work According to The Alteration of Design Literature)

  • 임칠순;이규철
    • 한국건축시공학회지
    • /
    • 제3권3호
    • /
    • pp.113-120
    • /
    • 2003
  • The purpose of this thesis is to provide an appropriate trade-off information for the conflicting interests caused by the various factors between building owner and contractor during selecting the contractor and performing the construction work, in which the construction was contracted by open bidding from the government or private organizations. In order to propose the legitimate evidence, the differences between the domestic contract sheet of drawing change and the process of drawing change and those of the foreign countries were compared and analysed. The number of construction ordered in Youngdong area in 2001 whose construction expenses are more than 100,000,000 won is 218 items and 147,005,000,000 won in total cost. Among them, the number of 218 items whose total cost amounts to 16,705,000,000 (11.36%) is in case of increase of construction expenses due to the drawing changes, and the number of 48 items whose total cost amounts to 2,009,000,000 won (1.37%) is the case of decrease. In conclusions, the contractor could have more benefits than the building owner in case they submit the detailed estimate sheet without eliminating the increasing expenses of construction. It is shown that the building owner's loss is increasing whenever the labor cost is higher than material cost. Therefore, this thesis proposes a proper standards for the harmonious compromise between the contractor and the building owner for the problems caused by the drawing changes when the contract agreement is occurred.

THE EFFICIENT ESTIMATE OF ENVIRONMENTAL MANAGEMENT COSTS IN THE CONSTRUCTION SITES

  • Hyuk Moon;Sung-Jin Kim;Jae-Jun Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.437-446
    • /
    • 2005
  • Recently as people's values are changing from development phase into running stage after quality of life, so that the needs of environmentally friendly construction are gradually increasing. Also populace discontent about the pollution during construction process such as the noise and vibration caused by construction machinery is increasing. Even though it is impossible to eliminate the construction pollution fully, it is necessary to make efforts to reduce construction pollution to a minimum. In terms of construction site operating, the first possible step for solving these matters directly is that the necessary sum of expenses must be secured as the environmental management costs in the conceptual phase. However, in fact, the environmental management costs have not been secured in the budget. Generally it is the major reason not arising proper activities to prevent the pollution in the construction site. The purpose of this research is to suggest the efficient budgeting method regarding Environmental management costs to ensure the necessary sum of environmental management expenses. To provide an efficient budgeting method, interviews with the person in charge of environment management was conducted. 78 construction sites was surveyed and environmental management costs were analyzed through their historical data from the survey. According to the results of analysis, the ratio of environmental management costs is revealed 0.45% of construction cost as average comparing 0.2% of legal limit. And usually the environmental management cost was appropriated into the safety management budget. So it is needed to isolate environmental management budget securely and modify the ratio of Environmental conservation Costs in Construction Technology Management Act.

  • PDF

공공임대주택 시설물 유지관리비 영향요인 실증분석 (An Empirical analysis of the Effect of Variables on Maintenance Expenses of Public Rental Housing)

  • 강현규;한충희
    • 한국건설관리학회논문집
    • /
    • 제7권6호
    • /
    • pp.185-192
    • /
    • 2006
  • 공공임대주택의 경과연수가 증가함에 따라 시설물의 노후화로 인한 유지관리비용이 급격히 증가하고 있다. 이에 효과적으로 대처하기 위해서는 우선 비용에 대한 정확한 예측을 하고 필요한 재원을 확보하는 일이 무엇보다도 중요하다 따라서 시설물 유지관리비에 영향을 미치는 요인들을 분석하고, 이를 고려한 비용 예측방법의 개발이 필요하다. 공공임대주택 운영관리비의 약 60%를 국가에서 지원하고 있는 미국의 경우는 수년간의 실적데이터를 바탕으로 운영관리비를 효과적으로 예측할 수 있는 방법을 개발하여, 공공임대주택이 적정한 수준에서 잘 운영될 수 있도록 하고 있다. 그러나 아직까지 국내에서는 공공임대주택을 대상으로 운영관리비 영향요인이나 예측 툴에 관한 연구 실적은 매우 미흡한 실정이다. 본 논문은 최근 5년간 공공임대주택에 실제 지출된 운영관리비를 바탕으로, 시설물 유지관리비용에 미치는 영향요인과 요인별 영향력 등을 밝혀냄으로써, 향후 객관적이고 정확한 비용예측 도구를 개발하는데 일조 하고자 한다.

건설공사 안전투자비용 최적화 연구 (A Study of Pertinent Safety Investment Reckoning by Economic toss Analysis of Industry Calamity in Construction Work)

  • 김연희
    • 한국안전학회지
    • /
    • 제19권4호
    • /
    • pp.117-122
    • /
    • 2004
  • The investment for industrial disasters prevention can not help but get accomplished in negative way. At this point, the most effective way to diminish industrial disaster outbreak is the very subject should strive to prevent it by itself However, it's still the times that we place more weight on economic development no economic subject would not positively self-participate in it for the investment for industrial disasters prevention without my effect of numerical reduction. In this view, this study will tv to entirely analyze and grasp the economic toss due to industrial disasters at construction sites, and will present the most suitable safety-investment. As a result, in domestic construction sites, averagely $1.6\~2.6\%$ of the entire construction expenses had been invested for safety expense. The according to the result of the analysis, basically this safety investment expenses should be spent $2.4\%$ over to reduce the saffey-accidents stably.

건설.운영비를 고려한 수도권 전철의 운임체계 및 승차권제도 개선방안 (The Improvement Plan on Fare and Ticketing System of Seoul Metropolitan Subway Considering Construction and Operational Costs)

  • 이태식;류종원;정철;이동욱
    • 한국철도학회논문집
    • /
    • 제10권3호
    • /
    • pp.327-336
    • /
    • 2007
  • Operation a subway company requires high amount of early construction, operation and maintenance costs. Seoul Metro, one of the public subway companies in Seoul, Korea, has undergone operational deficit from its establishment, and the main reason is that the early construction and operation cost exceed the total revenue. Therefore, detailed researches on current operation system and possible alternatives are conducted to settle down finance trouble of the company. In particular, problems on operation and ticketing systems are analyzed, and based on that, necessity and detailed plan of railroad pass for one day are introduced and analyzed.

잔여지 감가보상에 관한 연구 (The study on the depreciated compensation system for residual land)

  • 박용한
    • 한국전자통신학회논문지
    • /
    • 제8권2호
    • /
    • pp.307-312
    • /
    • 2013
  • 우리나라의 잔여지 보상제도는 크게 잔여지 매수 보상, 잔여지 감가보상, 잔여지 공사비 보상 등 세 가지로 나눌 수 있으며, 이 중 매수보상에서는 매수대상 요건이 주로 문제가 되고, 공사비보상에 대해서는 별도로 문제가 되는 부분이 거의 없다. 본 연구에서는 현행 잔여지 감가보상제도의 내용과 문제점을 살펴보고, 미국과 일본의 제도를 비교 분석하여 우리나라의 보상제도와의 차이점을 알아보고 잔여지 감가보상에 대한 정책적 대안을 마련하고자 한다.

금속용사 방식공법의 경제성 평가에 관한 연구 (A Study on the Economic Evaluation of Thermal Spray Methods for the Corrosion Protection of Steel)

  • 정성호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2005년도 춘계 학술기술논문발표대회 논문집
    • /
    • pp.13-16
    • /
    • 2005
  • Generally, as corrosive protection processing of a steel structure, zinc galvanizing and heavy duty coating paint are applied. However, zinc galvanizing has the difficulty of restriction of a size, or on-site construction. Moreover, heavy duty coating paint has a problem with many administrative and maintenance expenses with short problem of adhesion, corrosion generating of a damage portion, and maintenance management cycle. In this study, a salt water spray test, CASS test, and the electrochemistry examination were carried out for the thermal metal spray method of construction for corrosive protection performance evaluation. Moreover, the corrosive protection life of a thermal metal spray method of construction was quantitatively calculated on the basis of this experiment. in consideration of LCC, the economical efficiency of a general corrosive protection method of construction and a thermal metal corrosive protection method of construction was compared. Consequently, although initial construction expense was estimated 16 to $30\%$ high, as for a thermal metal spray method of construction, it turns out that the administrative and maintenance expenses for 100 years became cheap 9.3 to 13 or more times.

  • PDF