Strategy and Technology for Digital Transformation of Design and Construction of RC Structures (철근콘크리트골조 설계와 현장관리 디지털전환 전략과 기술개발)

  • Chee Kyeong Kim
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.36 no.4
    • /
    • pp.265-272
    • /
    • 2023
  • This paper presents a conceptual strategy and technologies for the digital transformation of design and construction of reinforced concrete (RC) structures. The development of an automated detail design strategy for RC structures is described. Integrated digital platform based on 5D BIM concept is proposed for the replacement of the current technology environment-based 2D CAD. Generally, the detail design development is labor-intensive and iterative. Effective automation of relevant aspects can dramatically improve productivity and accuracy. The proposed solutions for the automated BIM modeling based on the rebar and formwork detail design automation achieves the productivity and accuracy sufficient for site application. The platform integrates and manages the information flow between each solution or application and provides it to all participants of the project. Finally, it is expected that the proposed strategy and technologies can be further enhanced to achieve the productivity and accuracy needed for widespread site application and digital transformation.

기획단계에서의 최적 개산견적산정의 방법론 고찰

  • Kim Chan-Joong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.120-125
    • /
    • 2003
  • The estimated construction costs derived at the Planning stage of a project are utilized as important data determining the feasibility of overall project. Therefore the clients usually expect to have estimations of the construction cost as precise as possible and there has been extensive studies carried out by the cost specialists worldwide to satisfy this client's specific need whereas the local estimators still heavily rely on producing quantities and detail quotations only. This paper is to introduce a case study where elemental/functional area cost analysis is incorporated into a database system for the improved accuracy in cost estimations.

  • PDF

A study on the problem and Counter measure of plant Construction project. -Based on tile work of both civil engineering and steel structure in the plant construction project of On-San Refinery- (PLANT 건설공사의 문제점과 대책에 관한 고찰 (온산동련소 건설의 토건공사및 철골공사 사례를 중심으로))

  • 유광수
    • Journal of the Korean Professional Engineers Association
    • /
    • v.16 no.1
    • /
    • pp.13-19
    • /
    • 1983
  • As one of staff members participated in the full course of the plant construction project of On-san Refinery to its successful completion. I had my past expierence that the plant construction project was so complicated, and a Long period required, and thus there were so money problems to be solved. Among the problem, I mainly noticed that the following listed points were solved and improved. 1. Each drawing should be in every accuracy possible. 2. Contract should be specified in every detail possible. 3. All invoiced prices of breack down list should be coped with the current market prices. 4. All execution of work should be in the most accuracy. A. Planing execution of work. B. Coordination with supervisor group. C. Economical method for execution of work. D. Safety control. 3, Calculation work field should be established seperately 6. Each staff members should be work at the best of his pride.

  • PDF

Economic Analysis of Economic Steel beam method. (ES 빔 공법의 경제성 분석)

  • Choi, Tae-Ho;Woo, Jong-Yeol;Hong, Seong-Wook;Seo, Yong-Chil;Shin, Chan-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.133-136
    • /
    • 2011
  • This study concerned with the steel beam of bonding method and bonded steel beams by this method and both ends of different height, steel beams and steel beams in the center makes the junction. Both ends and the central part of steel beams connecting the lower flange by additional combining steel plates to convey stress, the stress to focus on the beam connections are passed to both ends of steel beams, and strength of beam connections is improved and steel structural beams is proposed to minimize the loss by Incision. If you use the developed method, the construction period is shortened, and reducing the amount of material can decrease the cost and reduction in floor height can be maximized business feasibility.

  • PDF

A Case Study on the Shallow Overburden Tunnelling with a Frame Slab Method (프레임 슬래브 공법을 적용한 천층터널의 시공법 연구)

  • Jung, Myung-Keun;Park, Chi-Myeon;Lee, Ho;Kim, Seung-Ryull
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.03a
    • /
    • pp.113-120
    • /
    • 2001
  • A frame slab method has been proved as a possible and profitable construction solution for the urban tunnels with very shallow overburden and the excavation from the surface Is strictly limited. Since this method allows only a small amount of construction activities in the ground surface, the disturbances to the public and the surface traffic can be drastically reduced compared with the ordinary cut-and-cover method. The construction sequences of the method and the some of critical cautions needed are described in detail. Also a comprehensive numerical analysis including 2-D and 3-D analysis have been performed to verify the stability of the ground during the construction. It is revealed from this study that the frame slab method can be a quite successful solution for the shallow overburden tunnelling in urban area.

  • PDF

Preliminary Study on the Factors Analysis of Change Order-Claim in Design-Build Project (설계시공일괄입찰공사의 설계변경 클레임요인 분석에 관한 기초 연구)

  • Ryu, Hyeok-Jun;Park, Byung-Ju;Yoo, Seung-Kyu;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.129-130
    • /
    • 2012
  • Although the order of Design-Build is being expanded by increasing construction scale and demanding hybrid function, the suitable regulation of the contracts is not settled. Design-Build is way by government because there are big construction of much government leading in contract relation high position occupy. So, case that prebendary's claim institution develops by litigation is very rare. But, recently Design-Build is magnified. So, these dispute factors is becoming visualization gradually. The contract system is needed to be consistent by international standard to deal with the problem. This study suggests the useful solutions in detail concerned with the main factor of change order claim by each Design-Build phases through practical sorting and analysis of the causes of Change Order-Claim.

  • PDF

Copy Raising Construction in English: A Usage-based Perspective

  • Kim, Jong-Bok
    • Language and Information
    • /
    • v.16 no.2
    • /
    • pp.1-15
    • /
    • 2012
  • In accounting for the so-called copy raising (CR) in English, the movement perspective has assumed that the embedded subject of the CR verb's sentential complement is raised to the matrix subject, leaving behind its pronominal copy. This kind of movement-based analysis raises both empirical and analytical issues, when considering variations in the pronominal copy constraint. This paper investigates the actual uses of the construction, using online-available corpora. Based on this corpus search, we classify two different types of copy raising predicates (genuine and perception), and discuss their grammatical properties in detail. We suggest that the simple copying rule couched upon movement operations is not enough to capture great variations in the uses of the construction, and show that interpretive constraints, e.g., perceptual characterization condition, play an important role in licensing the construction.

  • PDF

Quantity Takeoff for Non-Selection Work Items based on BIM (BIM 기반 비선정 작업항목 물량산출 방법에 관한 연구)

  • Park, Sang-Hun;Yoon, Sun-Jae;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.92-93
    • /
    • 2019
  • Estimates based on BIM makes it possible to perform from quantity take-off to construction cost estimates by using model, which is made in the phase of design and construction. As the BIM models are made up of the units of element, there an advantage of the automative quantity take-off, if the correction or change of element occurs. Work items, not included in the elements of the BIM model, are excepted from bill of quantity. Level of detail(LoD) of the BIM model can be improved for detailed estimates, but an excessive modeling for estimates is inefficient. This study presents the measure for selection and quantity take-off of work items, those are not expressed in the BIM model. The proposed method avoids the creation of excessive BIM Models and enables quantity take-off in conjunction with the element.

  • PDF

RELIABILITY-BASED COMPONENT DETERIORATION MODEL FOR BRIDGE LIFE-CYCLE COST ANALYSIS

  • Rong-yau Huang;Wen-zheng Hsu
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.386-397
    • /
    • 2007
  • One major development in bridge life cycle cost analysis (LCCA) in recent years is to develop deterioration model for bridge components so that the times of repair/replacement throughout a component's life span can be properly determined. Taiwan also developed her own bridge LCCA model in 2003, integrating with the bridge inspection database in the local bridge management system (T-BMS). Under the framework of the local LCCA model, this study employs the reliability method in developing a deterioration model of bridge components. A component deteriorates through time in its reliability, which represents the probability of a component's condition index exceeds a user specified threshold. Model assumptions and rationale are described in the paper. The steps for applying the developed model are explained in detail. Results and findings are reported.

  • PDF

SERVICE QUALITY EVALUATION INDICATORS FOR ASP-BASED PROJECT MANAGEMENT INFORMATION SYSTEM

  • Lee, Seul-Ki;Yu, Jung-Ho;Kim, Chang-Duk
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1453-1462
    • /
    • 2009
  • It is very important for performance of information system that we make an effort to raise user's satisfaction by continuously grasping user's requirement by evaluation of PMIS based on ASP service quality and reflecting this to information system. However, It is lack that developments of suitable evaluation index of PMIS based on ASP service quality. Hereupon, In this study, we propose the evaluation indicators. First, The evaluation area is classified by form the foundation of D & M IS Success Model (2003); system quality, information quality, service quality. Second, The detail evaluation item which include considerations which are gotten through investigation of the construction industry and PMIS based on ASP is grouping by form the foundation SERVQUAL which is a service quality evaluation tool proposed PZB(1988). It is suitable to evaluate PMIS based on ASP service quality in construction industry and able to evaluate various aspects.

  • PDF