• Title/Summary/Keyword: construction detail

Search Result 772, Processing Time 0.024 seconds

A Study on the Fatigue Design of Joint Detail of Vertical Stiffener in Two-Girder Bridge (2거더교의 수직보강재 연결상세부의 피로설계에 관한 연구)

  • Kwon, Soon Cheol;Kyung, Kab Soo;Park, Jin Eun
    • Journal of Korean Society of Steel Construction
    • /
    • v.21 no.1
    • /
    • pp.93-103
    • /
    • 2009
  • Two-girder bridge is composed of primary members such as deck slab and main girder, and secondary member such as cross beam, vertical and horizontal stiffeners etc,. Two-girder bridge is prescribed as a non-redundant load path structure in the ASSHTO and the Korean Highway Bridge Design Code. Such structure is that if one girder is damaged, problems of function and safety of the bridge are caused. From the reasons, fatigue cracks in two-girder bridge can affect safety of the bridge seriously. Therefore, in this paper, fatigue evaluation was performed at connection parts of vertical stiffener and web with radius of curvature of scallop of vertical stiffener and thickness of web as variables. Such joint is known as a detail which has high possibility of fatigue crack in the bridge. Based upon the analytical results, preferable joint detail in terms of fatigue and simple empirical formula for fatigue evaluation of the detail were suggested.

A Study on the Automated Estimating System using BIM based Library (BIM 기반 토목 라이브러리를 통한 견적자동화시스템에 관한 연구)

  • Han, Jung-Hoon;Nam, Sang-Hyeok
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.12-18
    • /
    • 2011
  • The BIM techniques which manages information over the life cycle of construction project based on the 3-dimensional model are developing in the direction of integrated construction management including planning, design, analysis, estimation, 3D simulation and so on. The estimation model based on the BIM has different detail level and model information. In this study, the LOD of estimation model is catched for the bridge structures. The library classes are defined with construction information classification system, and the quantities of resources are calculated by class parameter using Microstation API. Finally, the automated estimation system using BIM based library is verified by the integrated model for adjustments of level of detail.

Utilization of Failure Examples in Detail Design for Oil and Petrochemical Plant Project (석유화학 플랜트 프로젝트 상세설계 실패사례활용방안에 대한 연구)

  • Kang, Tae-Young;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.2
    • /
    • pp.62-67
    • /
    • 2009
  • The capability of design and engineering of global EPC companies has long been equalized through past similar construction experiences. Among various key factors in the success of EPC project, the capability of engineering is considered to be the most important factor since the engineering is preceding activities of EPC contract. The failure of engineering may adversely affect the subsequent procurement & construction activities and in turn may cause cost overrun or schedule delay. Therefore, an EPC company needs to continue to improve the engineering capabilities for the success of project. The engineering capabilities can be further improved if the EPC company should prevent recurrence of similar design faults that were previously committed. This study is intended to present how to make the most of the failure examples from previous projects towards a success of project. Failure is but a stepping stone to success. The EPC company can obtain useful lessons from the analysis of past failure examples.

  • PDF

Analysis of finishing details to Prevent leakage of PC Apartment Joints in Korea (국내 PC 아파트 접합부 누수 방지를 위한 마감상세 분석)

  • Kim, Tae-Ho;Ko, Hyo-Jin
    • Journal of Korean Association for Spatial Structures
    • /
    • v.21 no.4
    • /
    • pp.81-89
    • /
    • 2021
  • Recently, interest in OSC(Off Site Construction) is increasing due to the trend of a decrease in skilled workers and an increase in labor costs. In this regard, PC(Precast Concrete) is being reviewed for apartments, the most common type of housing in Korea. As the biggest concern for PC apartment houses, civil complaints such as inter-floor noise and leakage were presented. In this study, the details of the joints were reviewed based on the past cases of PC apartments, and the details of the recently constructed or planned PC apartments were investigated. Through this, the leakage path in the past was analyzed through the existing research literature and data. And wall type RC and PC apartment joint leakage test was performed and we found the needs for a detail of waterproof steps, sealant. Also, joint details were investigated for a rahmen type apartment housing under construction. At last, A discussion was conducted on the direction for a detailed proposal of an improved joint in the future.

Long-Term Wildfire Reconstruction: In Need of Focused and Dedicated Pre-Planning Efforts

  • Harris, William S.;Choi, Jin Ouk;Lim, Jaewon;Lee, Yong-Cheol
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.923-928
    • /
    • 2022
  • Wildfire disasters in the United States impact lives and livelihoods by destroying private homes, businesses, community facilities, and infrastructure. Disaster victims suffer from damaged houses, inadequate shelters, inoperable civil infrastructure, and homelessness coupled with long-term recovery and reconstruction processes. Cities and their neighboring communities require an enormous commitment for a full recovery for as long as disaster recovery processes last. State, county, and municipal governments inherently have the responsibility to establish and provide governance and public services for the benefit and well being of community members. Municipal governments' comprehensive and emergency response plans are the artifacts of planning efforts that guide accomplishing those duties. Typically these plans include preparation and response to natural disasters, including wildfires. The standard wildfire planning includes and outlines (1) a wildfire hazard assessment, (2) response approaches to prevent human injury and minimize damage to physical property, and (3) near- and long-term recovery and reconstruction efforts. There is often a high level of detail in the assessment section, but the level of detail and specificity significantly lessons to general approaches in the long-term recovery subsection. This paper aims to document the extent of wildfire preparedness at the county level in general, focusing on the long-term recovery subsections of municipal plans. Based on the identified challenges, the researchers provide recommendations for better longer-term recovery and reconstruction opportunities: 1) building permit requirements, 2) exploration of the use of modular construction, 3) address through relief from legislative requirements, and 4) early, simple, funding, and the aid application process.

  • PDF

Computer-Aided Drawing and Manufacturing of Rebars for RC Buildings (RC 건축물 철근 배근 상세도 및 가공도 작성 자동화)

  • Choi Dong-In;Kim Chee-Kyeong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2006.04a
    • /
    • pp.508-513
    • /
    • 2006
  • In construction of RC buildings, the quality of shop and detail drawings is very essential for the quality and safety of buildings. Nevertheless, most of thess works are left to site workers and the requirements about bar detailing such as anchorage and splice have been done without rational design and engineering. The purpose of this research is to develop a computer-aided drawing system of rebars for RC buildings. The system is based on an integrated structural design system, that is SDP. SDP manages an engineering database for structural design information. It provides all the information needed to draw rebar drawings. The drawing system consists of three modules, 1) Structual Plan Drawing System, 2) Shop Drawing System, and 3) Detail Drawing System. It is expected that not only the productivity of detail drawing works but also the quality and safety of buildings will be improved using the rebar drawing system developed in this research.

  • PDF

Design and Implementation of Rebar Detailing DB and System in RC Buildgings (철근배근상세 DB 및 도면작성 시스템 설계와 구현)

  • Choi, Dong-In;Park, Eui-Dong;Kim, Chee-Kyeong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.763-768
    • /
    • 2007
  • In construction of RC buildings, the quality of shop and detail drawings is very essential for the quality and safety of buildings, Nevertheless, most of thess works are left to site workers and the requirements about bar detailing such as anchorage and splice have been done without rational design and engineering. The purpose of this research is to develop a computer aided drawing system of rebars for RC buildings. The system is based on an integrated structural design system, that is SDP. SDP manages an engineering database for structural design information. It provides all the information needed to draw rebar drawings. The drawing system consists of three modules, 1) Structural Plan Drawing System, 2) Shop Drawing System, and 3) Detail Drawing System. It is expected that not only the productivity of detail drawing works but also the quality and safety of buildings will be improved using the rebar drawing system developed in this research.

  • PDF

STUDY OF NEW CAST-IN-PLACE MORTAR WALL FOR HOUSE CONSTRUCTION COMPARED TO BRICK AND MORTAR-BLOCK SYSTEM (A SIMULATION IN DIFFERENT AREAS)

  • Arief Setiawan Budi Nugroho;Shin-ei Takano
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.196-202
    • /
    • 2009
  • Study from Yogyakarta earthquake reconstruction program, cast-in-place wall using fix-size formwork system (Old-CIP) has offered a good alternative for house construction. A simulation has also confirmed that this system using mortar as the main material can provide cheapest cost and lowest total man power compared to conventional wall construction technique: brick or mortar-block wall. This paper presents the new wall construction technique: full size cast-in-place wall (New-CIP). The detail of how this new technique implemented is described. In addition, considering that material and labor cost in one area is different to others, cost analysis for different resources prices and wages of three cities are taken into a simulation. The analysis is aimed to distinguish the implementation feasibility of New-CIP system compared to the four common wall systems. Finally, its implementation resistance is also discussed.

  • PDF

Ensuring safety of temporary structures through on-site real-time structural analysis Construction Sites (가설구조물 구조검토의 실시간 현장 반영을 통한 안전성 확보)

  • Mo, Seung-Un;Moon, Seong Oh
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.19-20
    • /
    • 2022
  • Based on the survey analysis of safety accidents at construction sites that occur every year, most of them are caused by temporary structures. While analyzing in detail, it is confirmed that the main factors for such accidents are the quality problem of temporary equipment, unstable construction, and arbitrary change. As temporary structure is installed only for the construction of main structure, the reality is that no attention is paid to the construction of temporary structures.

  • PDF

A STUDY ON SPACE ZONING BY COMPUTING IDLE-TIMES IN CONSTRUCTION PROCESSES

  • Sang-Min Park;Won-Suk Jang;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.509-512
    • /
    • 2013
  • An inappropriate space zoning plan causes the unnecessary transportation of construction material and equipment among work areas and increases the disorder of work space. Space zoning is an essential operation management technique which contributes to reduce the process and/or operation idle-time. This paper introduces a method that computes the idle-times between construction operations (or processes) by using Web-CYCLONE. It allows computing with idle-times that affect the construction productivity. Using the idle time between operations and between processes, it computes the optimal number of zones and finds the optimal combination of zones that minimize the idle times. The method contributes to minimize the idle times relative to the operation schedule using complete enumeration. This paper presents the system prototype in detail. A case study is presented to demonstrate the system and verifies the validity of the model. It allows a project manager to establish space zoning plan that effectively segregates a project into optimal number of construction zones and to assign the constrained resources (e.g., laborer, equipment).

  • PDF