Identifying Potential Opportunities of BIM for Construction Risk Management (BIM을 이용한 건설리스크 해결 가능성 도출)

  • Won, Jongsung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.201-202
    • /
    • 2019
  • This paper aimed to identify potential opportunities of building information modeling (BIM) utilization for construction risk management. Construction risk factors and BIM functions were derived through conducting in-depth literature review. Nineteen construction risk factors could be resolved by various BIM functions. Phase planning, site analysis, design authoring, and 3D design coordination were identified as the most efficient BIM functions for construction risk management.

  • PDF

A Case Study on Value Improvement through applying VE Method in Stage of Railway Construction (시공 VE기법을 적용한 철도구조물의 가치향상 사례 연구)

  • Cho, Ki-Yon;Park, Mi-Yun;Kim, Sung-Hun;Seo, Jong-Won
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.23-29
    • /
    • 2008
  • Most VE operation related to construction project is progressed in stage of planing or design phase, especially in case of domestic. It is encouraging fact and if you have VE process in stage of planning and design, you'll have experience a reduction of about 70% of total saving cost in which total construction process may occurred. However, recently the work of construction in overseas increase and almost is only construction-work, except planning and design process. As this reason, VE process for construction-work phase only is demanded in high necessity. VE in construction phase comes to accomplish intensively in the part which the design change does not follow, through know-how, equipment operating method and method of temporary-structure erection at the established construction-site learned, builders will be the possibility of reduction from 3% to 10% in constructive expense. This paper describes VE performing example in OO company's construction-work phase, and propose the methodology of VE performance in the phase of construction. And also it is aimed to extending VE applications into the overseas construction enterprise.

  • PDF

Methodology of Developing Design Information IETM for Construction Project (건설공사 설계정보 전자매뉴얼 개발방법론 연구)

  • Kang Leen-Seok;Kwak Joong-Min;Moo Hyoun-Seok;Han Joo-A;Kim Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.358-361
    • /
    • 2004
  • The objective of establishing IETM (Interactive Electronic Technical Manual) is not the just making into on-1 me system of technical manuals such as specifications. It is to produce construction standard documents in an electronic manual system to turn technical contents such as construction methods in technical manuals into multimedia information. Also, it is to maximize real-time information delivery by using visual data of construction sites. IETM enables to check not only design standards in the design but also applied situation of a construction method based on proper design standards and historical construction data on a real time basis. This study suggests a modeling method of IETM applicable to design and construction phase. The study includes a framework and a scenario for developing design IETM for construction project.

  • PDF

Global Construction Competitiveness Evaluation in 2016

  • Park, Hwanpyo;Han, Jaegoo
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.1-7
    • /
    • 2017
  • Korea's domestic construction market and overseas construction order environment are experiencing a decreasing trend, and this trend is expected to continue. Therefore, domestic construction companies are seeking to enter the global construction market. This study analyzes the global construction market and the global competitiveness for global construction companies and provides the results. To this end, this study has developed a model to evaluate the global construction competitiveness level and to evaluated global construction competitiveness in 2016. The evaluation of global construction competitiveness was analyzed based on the competitiveness of construction infrastructure by country, and the evaluation results of competitiveness of construction companies. These assessments were based on 20 detailed international statistics (ENR, Global Insight, Compass, etc.). The evaluation results are as follows. First, in regard to the comprehensive global construction competitiveness by country, America ranked first among 20 countries, followed by China. European countries like Spain, Germany and the Netherlands ranked third to fifth, respectively. Korea ranked sixth, one rank higher than that of the previous year. America and European countries remain strong. Second, in regard to the comprehensive building infrastructure competitiveness by country, America ranked first followed by Germany. Korea ranked twelfth, which is the same rank as that of the previous year. When it comes to stability in the construction market, China ranked first and Korea eighth. For construction systems, Sweden ranked first and Korea thirteenth, and for infrastructure, Japan ranked first and Korea tenth. Third, according to the construction company's capability evaluation by country, America ranked first followed by China. Korea ranked fourth, two ranks higher than that of the previous year because of its building competitiveness (fifth → fourth) and design competitiveness (eleventh → eighth) which has improved. When it comes to building competitiveness, China ranked first and Korea fourth. For design competitiveness, America ranked first and Korea eighth, and for price competitiveness, India ranked first and Korea seventh. However, Korea is still in the middle of the pack rank among the 20 countries considered when it comes to design competitiveness. It is ranked eleventh for design productivity and thirteenth for foreign sales against the total sales (internationalization). Thus, Korea needs to improve technical power and tap into new markets for improved competitiveness, including increased productivity. To do so, more R&D investment is required.

  • PDF

Consideration on the Creation of Construction Cost by Calculating the Quantity at the Planning Design Stage - Focusing on Construction Cost Management Vases and Work Methods - (초기 설계단계에서 개산 견적의 수량산출에 의한 건축공사비 작성에 대한 고찰 - 공사비 관리 사례 및 작업 방법을 중심으로 -)

  • Hyun, Dong-Myung;Jeon, SangHoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.329-330
    • /
    • 2021
  • The calculation of the correct construction value in the construction should be investigated after the quantity is calculated. In order to calculate the quantity requires a lot of cost and time, and the initial accurate quantity calculation is not possible. Therefore, in the planning step in order to successfully complete the project to demonstrate the practicality of the difference between the construction cost by the construction design by presenting a method for calculate the quantity through the estimate with the construction open, floor plan, surface view, section.

  • PDF

Individual Factors Influence on Client Involvement: the Case Construction Projects in Saudi Arabia

  • Trigunarsyah, Bambang;Al-Solaiman, Sultan
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.578-582
    • /
    • 2015
  • Lack of client involvement in construction of public projects has been identified as the main cause of many operational problems. Clients need to perform their roles and responsibilities effectively and efficiently at the right time and through the use of correct methods in order to have the optimum involvement required during all the construction project phases, namely, the planning, design, construction, handover, and operation and maintenance phase. This paper investigates the influence of clients' individual factors on their involvement in construction project delivery. A questionnaire survey was distributed to various government agencies of the Kingdom of Saudi Arabia (KSA). Explanatory Factory Analysis was performed to group nineteen individual factors. The factor analysis result suggests that the individual factors that can involve clients' involvement in construction projects can be grouped into five, which are: adequacy of knowledge and experience for decision making in the early stage of design; ability to communicate clearly; job satisfaction; personal skills; and expertise in design and construction.

  • PDF

Development of the Low Noise Design Program for Construction Equipment's Muffler under the High Velocity Flow (유동 소음을 고려한 저소음 머플러 설계 프로그램 개발)

  • Kim, Hyung-Taek;Joo, Won-Ho;Bae, Jong-Gug
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2008.11a
    • /
    • pp.483-488
    • /
    • 2008
  • The exhaust system, including a muffler, is one of the major sources to generate the radiated noise of construction equipment. In general, the muffler is applied to construction equipment in order to reduce the exhaust noise. Sometimes, however, the higher exhaust noise can be experienced due to the flow effect inside a muffler. So, it is required to consider the flow effect to reduce the exhaust noise level of construction equipment. In this paper, various tests were performed to calculate the flow noise effect inside a muffler. Through a series of tests with respect to a variety of design parameters, a new design program for low noise muffler was developed and applied to reduce the exhaust noise of the construction equipments. These results make it possible to understand the dynamic characteristics of the flow noise and to design the low noise muffler for the construction equipments.

  • PDF

Analysis of structure stability of Golf structure of truss (골프장 트러스구조 구조안전성 검토사례)

  • Kang, Dong-Gyun;Yoon, Sung-Won;Hong, Hyun-Pyo
    • 한국공간정보시스템학회:학술대회논문집
    • /
    • 2004.05a
    • /
    • pp.275-278
    • /
    • 2004
  • This paper focused on problems of design, construction, and maintenance caused by construction implementation processes. They were analyzed through case study of structure safety diagnosis projects. From the case study, it is expected that the introduction of Construction Management from the first stage of procurement will improve construction cost increase or burden on small design company. It strengthens coherent management from design and source contractor selection to build review of responsibility. The coherency will prevent changes in designing or infirm unreliable construction. It is desirable that expert opinions are considered when structure changes and establishment occur and that, if necessary, actions such as source selection, periodic audits, and diagnosis arc checked and fed back to maintenance.

  • PDF

A Basic Study on the Development of Simulation Systems for Supporting the Pre-design Phase of Construction Projects (건축 기획 지원 시뮬레이션 시스템 개발에 관한 기초 연구)

  • Min, Kyung-Min;Ham, Nam-Hyuk;Kim, Joo-Hyung;Kim, Jae-Jun
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.176-181
    • /
    • 2007
  • The widespread of IT technology caused a remarkable change in many industries and the construction industry is also one of them being influenced in the form of CIC(Computer Integrated Construction) and BIM(Building Information Modeling). Construction projects have many participants from various disciplines involved throughout the entire process. Therefore the success of the project greatly depend on the efficiency of decision-making using the information generated from each process stage. Looking from this aspect, the greatest potential value lies in the planning and pre-design stage when considering the construction life cycle. In this paper, we propose a project on developing a 3D object oriented simulation system for supporting the pre design phase. We define the needs for such system through previous case studies and suggest a to be process model. Finally we anticipate the effects that the project will eventually contribute to the construction industry.

  • PDF

A Study on Construction Drawing Data Exchange Model for Information Interoperability Based on International Standards (국제표준기반의 건설도면정보 교환 모델에 관한 연구)

  • Kim, I.H.;Kim, G.
    • Korean Journal of Computational Design and Engineering
    • /
    • v.6 no.3
    • /
    • pp.147-156
    • /
    • 2001
  • In the construction industry, construction process includes a variety of design stages with cooperation and regulation by many related disciplines. In addition, the construction market is growing and becoming more complex. With this characteristic, design information has become more and more complicated and difficult to manage by the simple and traditional data management methodology. In the practical field, although CAD has been widely available for the last ten years, related disciplines have not shared digital information efficiently. This paper suggests a construction CAD data exchange model that has been developed through investigation and analysis of Korean construction CAD practices and foreign CAD standards. Moreover, this paper investigates a CAD data exchange model using STEP to improve information availability and overcome the limit of CAD systems.

  • PDF