Traditionally construction has been an industry that favoured ADR over formal litigation due to the complexity of technical issues. However, over the past decade construction arbitration has come under increasing attack for its rising costs and growing delays, and expansion of arbitration processes to the point that those processes are approaching the more complex and formal processes followed to resolve disputes litigation. As a result, parties are looking for new methods of resolving their disputes in a more efficient and economical manner, such as ODR. A review of the history of ODR and the practical applications of ODR in use today lead to the conclusion that the concept of ODR for construction dispute resolution appears to be possible and realistic. The advantages seem to outweigh the disadvantages, especially given the solutions suggested to overcome many of the disadvantages. While ODR may not be a realistic venue for large complex construction cases, it may be just the ideal venue for smaller and simple construction disputes. In conclusion, given the advantages that ODR arbitration does offer, the most realistic use of ODR in the short term would involve disputes consisting of a simple, one-dimensional dispute within which the parties can stipulate to the facts in the case. In such simple disputes ODR may be not only an appropriate vehicle within which the dispute can be resolved; it might be more easily accepted by the parties as the preferred platform for resolution. Hopefully, international institutions of arbitration will be successful in their development of a international standards and platform fir disputes that can be adapted for use in construction and will serve as the first step in developing ways to handle small construction claims, thereby allowing parties to resolve their disputes in a faster and more economical manner.
Proceedings of the Korean Institute of Building Construction Conference
/
2015.11a
/
pp.64-65
/
2015
As construction projects have increased in size and height recently, lifting accounts for increasingly greater portion and tower cranes are used more frequently. At present, the selection and arrangement of tower crane are depend on the experience of experts. However, since the number of experts is fairly limited and a database for tower cranes regarding lifting capacity, operation properties, rent, etc has not been widely employed, tower cranes are often not effectively selected and arranged which can cause cost overruns and delays in the lifting work. To address such issues, this study attempts to perform a basic study for development of automatic arrangement algorithm of tower crane using drawing recognition. If relevant database is established and the algorithm suggested in this study is refined more systematically, even beginning level engineers will be able to plan tower crane arrangement in a way comparable to experienced experts.
PURPOSES : Traffic congestions which occur in the intersections of arterials lead to mobility and environment problem, and then traffic agencies and engineers have been struggling for mitigating congestions with greenhouse gas emissions. As an alternative of solving theses problems, this study is to introduce a low-cost and high-effectiveness countermeasure as unconventional intersections which are successfully in operation in U.S.. The main feature of unconventional intersections is to reroute turning movement on an approach to other approach, which consequently more green time is available for the progression of through traffic. Due to improved progression, this unique geometric design contributes to reduce delays with greenhouse gas emission and provides a viable alternative to interchanges. This study is to evaluate the potential operation and environment benefits of unconventional intersections. METHODS : This study used the VISSIM model with Synchro and EnViVer. Synchro is to optimize signal phases and EnViVer model to estimate the amount of greenhouse gas emissions by each condition. RESULTS : The result shows that unconventional intersections lead to increase the capacity and to reduce greenhouse gas emissions, compared to existing intersections. CONCLUSIONS : Unconventional intersections have the ability to positively impact operations and environments as a low-cost and high-effectiveness countermeasure.
Nam Jae-Woo;Yoon Chang-Min;Ko Dong-Han;Chung Jae-Ho;Kim Chang-Duk
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.548-551
/
2004
In suite of a high supply of multi-family housings, the government's housing policies have only been focusing on the construction of housings and their supply, while being almost indifferent to the maintenance management of them. As a result, a considerable amount of inconvenience to the use of housing resources and habitation of residents occurred. Accordingly, on this paper, the current housing policies and their inspections on the maintenance period are compared and analyzed with suggestions for improvement. Analysis shows that repairing of housings at appropriate time not only significantly delays the deterioration of housings, but also keeps the function of housings to their original condition. Therefore, through an efficient management of repair maintenance, wearing of buildings can be delayed and their functions can be improved.
KSCE Journal of Civil and Environmental Engineering Research
/
v.34
no.4
/
pp.1299-1306
/
2014
Recently, there are many roundabouts installation works which are ordered to provide convenient transportation to road users as well as to eliminate traffic accidents and traffic delays. This study propose an approximate construction cost estimation model for early stages of roundabout construction. The model is designed considering the conditions of the early stage roundabout construction sites in Jeju. The regression equation of approximate construction cost was derived through regression analysis of 25 design data of roundabout construction in Jeju, and it was analyzed to have a high prediction accuracy. Finally, results verifies high prediction accuracy of the derived regression equation. Difference between the estimation cost and the design cost was only 2.3%, 3.7%, and 5.8% that verifies the high accuracy of the proposed approximate construction cost estimation model.
Korean Journal of Construction Engineering and Management
/
v.12
no.6
/
pp.31-41
/
2011
Since the cases of time extension have continuously transpired in the public construction project, the potential of economical loss and claims is increasing because the concerned parties such as an owner or a contractor have not properly performed their own responsibility for time extension. One of the main reasons is that the present planning and scheduling do not support the method to apportion the proper responsibility to the right party. This problem has repeatedly led to time extension and made it difficult for the concerned parties to perform the responsibility for time extension. In order to overcome this problem, a framework of delay administration is required as the method to apportion the proper responsibility to the right party. To solve this problem, this paper aimed to develop the conceptual model and prototype system as the practical method to administrate delay causation. Furthermore, the verification result for the reliability and applicability throughout the case studies on real construction projects shows that the conceptual model and prototype system developed would help efficiently to administrate the delay causation.
Journal of Construction Engineering and Project Management
/
v.2
no.2
/
pp.18-27
/
2012
Despite the rapid development in the construction industry due to the changing new technologies, many projects still fail to meet target deadlines. Shortage in manpower and skilled laborers is one of the main reasons for such delays. Markets with high economic growth and economic expansion (such as Gulf Countries in the Middle East) may have pronounced labor the shortages. Labor subcontracting practices are used sometimes to increase production rates and meet project deadlines. This paper explains and analyses labor subcontracting practices currently being used in many places around the world (and especially in the Gulf Countries) and in particular defines a maximum overtime rate for laborers in the laborer-subcontracting method ensuring that the contractor gains both the time saved during overtime and also reduces the cost per unit produced. The mathematical model used formalizes a closed-form equation for overtime pay in similar situations and as such can be applicable worldwide. Data was collected from representative projects that employed such practices from various trades. Validation of the model and formula has been tested successfully by analyzing historic data. The results prove that contractors often do not reach the optimum use of their practices resulting in a higher cost per unit. The presented model and the analysis should be of interest to many contractors currently involved in the practice or considering its use and to those who wish to find new methods that would help in eliminating as much wastes as possible by allocating their resources in the most efficient way.
Korean Journal of Construction Engineering and Management
/
v.16
no.4
/
pp.80-88
/
2015
In the case of those types of work that are performed outdoor construction work, many non-working days occur due to climatic elements such as low temperature, rainfall, and high wind velocity. In particular, damage incurred construction delays hardly decreases because weather forecasting has become difficult due to global warming. In the present study, time points of drastic changes in annual average temperatures, annual average maximum temperatures, and annual average minimum temperatures were identified through BCP analysis and increasing/decreasing trends of non-working days in summer and winter were compared and analyzed on the basis of the change points. According to the results of the study, annual average temperatures drastically changed in 1988 and 1998. After the two time points, non-working days in summer and winter clearly showed increasing trends and decreasing trends respectively.
Sagong, Myung;Choi, Il Yoon;Lee, Jun S.;Cho, Chung-sik
Geomechanics and Engineering
/
v.21
no.2
/
pp.207-213
/
2020
Umbrella Arch Method (UAM) often employed in the tunnel construction under poor rock mass conditions in Korea. Insertion of steel pipes at the periphery of the tunnel and infiltration of grouts along the pipes into the rock masses increases tunnel stability. There are two major effects of grouts expected at the tunnel face: 1) increase of face stability by enhancing the frictional resistance of discontinuities and 2) decrease of permeability along the rock masses. Increase of resistance and decrease of permeability requires a certain curing time for the grout. In Korea, we require 24 hours for curing of grout, which means no progress of excavation for 24 hours after infiltration of grouts. This step delays the tunnel construction sequences. To eliminate such inefficiency, we propose MTG (Method for Tunnel construction using Grouting technology), which uses extended length of steel pipes (14 m) compared to conventional pipe roof method (12 m). The merit of MTG is the reduction of curing time. Because of the approximately 2 m extension of the length of steel pipe, blasting can be done after infiltration of grouting. For this paper, we conducted experiments on the shear strength behaviors of grout infilled rock joint with elapsing of curing time and blasting induced vibration. The results show that blasting induced vibration under MTG does not influence the mechanical features of grout material, which indicates no influence on the mechanical behaviors of grout, contributing to the stability of tunnels during excavation. This result indicates that MTG is a cost effective and fast construction method for tunneling in Korea.
Journal of the Korea Institute of Building Construction
/
v.20
no.6
/
pp.567-576
/
2020
This study proposes additional items to be recognized as defects in a defect lawsuit through a case analysis of lawsuit cases in apartment housing. Identifying these defects prevents an unexpected increase in litigation costs, delays in the date of litigation, and emotion repercussions or additional lawsuits. In this study, the defects that were not discovered by the existing occupants and construction companies, but were newly discovered in litigation, were defined as defects in lawsuits. Fifteen cases of lawsuits were analyzed and a total of 77 defects were derived. Each item was then reviewed for location, work type, number of occurrences, and cost. The results were yielded 23 defect items, which were validated by appraisers who directly appraised the cases. In addition, the derived defect factors were analyzed. Finally, the 23 defect items were categorized into 10 main factors which include attributes such as causes of occurrence and characteristics. This can provide an overall area of defects to be considered in addition to existing defect items in the life cycle of the housing. The results of this study can contribute to reducing the actual occurrence of defects and minimizing the disputes in the case of defect lawsuits.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.