A Study on the Software Development to Automate the Calculation for the Landscape Architecture Construction Cost Estimation. (조경 공사 내역서 계산 자동화를 위한 소프트웨어 개발에 관한 연구)

  • 이규석;황국웅
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.20 no.2
    • /
    • pp.106-118
    • /
    • 1992
  • The landscape architecture construction cost estimation includes the repeated calculation and updating. Thus, it is time-consuming, and one of the jobs which needs to be automated first. In Korea, the IBM compatible personal computer(PC) is the most widely used one in the landscape architecture firms. However, the software for landscape architecture construction cost estimation is not being used in the PC environment. Therefore, the purpose of this study is to develop the software which can be used to automate the calculation for the landscape architecture construction cost estimation, and runs in the IBM compatible personal computers(PC). The clipper '88 summer is one of the DBMS software packages, and it has many commands and functions and functions which reduces program lines and makes the programing efficient, especially in the programing work whose total source code lines do not exceed over 10,000 lines. So, it was used in this study. The software developed in the this study was tested using the real data, and it was found that it can be efficiently used in the following jobs. They are: (1) to calculate exactly and rapidly. (2) to use resources repeatedly. (3) to print out the results. (4) to store data files for the future use. The software, as discussed in this paper, reduces the time and efforts to be spent in the calculation for the landscape architecture construction cost estimation compared with the traditional approach using the pocket calculator.

  • PDF

Analysis of Cost Estimate Method Based on Engineering 3D Model for Nuclear Power Plant Construction Project (엔지니어링 3D모델 기반 원전 건설사업비 산정방안 분석)

  • Lee, Sang-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.294-295
    • /
    • 2018
  • Nowadays, the construction industry utilizes 3D models in the designing process, on which research is being conducted to establish an automated system for project cost estimation in connection with information related to construction such as material unit costs and wages, beyond the level of design interference review and construction quantity estimation. In this process, the project cost is estimated in connection with unit price data after takeoff the quantity based on the 3D model attributes and data types. A way to reduce cost and risk would be first developing prototypes of some of essential buildings and works, comparing and validating the outcomes, and then extending to the whole scope, because estimates differ on the basis of the scope and level of 3D design models as well as the data accuracy. This study analyzes case studies of project cost estimation by computing the quantity on the basis of 3D model in the construction industry and explores methodologies and management measures applicable for estimating nuclear power plant construction project costs.

  • PDF

A Study on the Factors for Revision of the Reinforced Concrete Construction Cost Estimation Standard (철근콘크리트 공사비산정기준 개정요인에 관한 연구)

  • Song, Tae-seok;Ahn, Bang-yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.198-199
    • /
    • 2022
  • Reinforced concrete is the most widely used construction method for constructing structures. There is a lot of process for constructing Reinforced concrete structures such as installing rebars, molds and support, mixing and placing concrete, and curing. So the reinforced concrete work accounts for a large part of the total construction cost for constructing structure. For this reason a reasonable standard for estimating the cost of reinforced concrete construction has to be established and it will be possible to secure appropriate costs for construction work. In this study, we analyze the revision factors of the standard for estimating the cost of reinforced concrete construction and present them to secure reasonable construction costs.

  • PDF

A Study on the Construction of Computerized Algorithm for Proper Construction Cost Estimation Method by Historical Data Analysis (실적자료 분석에 의한 적정 공사비 산정방법의 전산화 알고리즘 구축에 관한 연구)

  • Chun Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.192-200
    • /
    • 2003
  • The object of this research is to develop a computerized algorithm of cost estimation method to forecast the total construction cost in the bidding stage by the historical and elemental work cost data. Traditional cost models to prepare Bill of Quantities in the korea construction industry since 1970 are not helpful to forecast the project total cost in the bidding stage because the BOQ is always constant data according to the design factors of a particular project. On the contrary, statistical models can provide cost quicker and more reliable than traditional ones if the collected cost data are sufficient enough to analyze the trends of the variables. The estimation system considers non-deterministic methods which referred to as the 'Monte Carlo simulation. The method interprets cost data to generate a probabilistic distribution for total costs from the deficient elemental experience cost distribution.

Development of Construction Cost Estimation Model for Elementary, Middle and High School Facilities (초·중·고등학교 시설물별 추정공사비 산정모델 개발)

  • Jung, Eui-Hyun;Yeom, Dong-Jun;Kim, Jun-Sang;Kim, Young Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.69-78
    • /
    • 2021
  • Estimated construction cost is an important index to secure an optimal budget which needs to go into construction projects in the previous of basic design phase. In order for public institutions to calculate the estimated construction cost, the cost per unit area of public buildings is used. However, the current calculation method of the estimated construction cost in public buildings is impossible to reflect the characteristics of many facilities and combinations. The purpose of this study is to develop an estimation model in the previous of basic design phase for the elementary, middle and high school facilities. it is expected that it is possible to estimate the construction cost of the elementary, middle and high schools in a reasonable and reliable manner through the estimation model developed in this study.

The Predetermined Amount Estimation for the Standardization of Construction Cost Estimating System Focusing on the School Work (실적공사비 적산제도 표준화를 위한 예정가격 산정 -학교공사를 중심으로-)

  • Park, Keum-Soon;Jung, Sung-Gwan;Park, Kyung-Hun;You, Ju-Han
    • Current Research on Agriculture and Life Sciences
    • /
    • v.26
    • /
    • pp.31-43
    • /
    • 2008
  • Introduction of construction cost estimating system is necessary to promote appropriate reflection of construction cost and simplified and efficient amount work. The results of this study are as follows. In the results of considering the basic concept and composition of a construction type estimating system, an example orders are concentrated on an apartment house in the country. The building appurtenant work of extension work is high(1.52) as compared with others. In regression analysis for a construction cost, the models are as follows. In a new construction work, (construction cost)=$12,004.8+4.09{\times}$(building area), and in extension work, (construction cost)=$-121.9+4.50{\times}$(building area). Accordingly, this study wishes to compare and analyzes main contents of original cost method and results cost method, and propose predetermined amount estimation device through existent literature study investigation for accumulation of the construction cost.

  • PDF

A Study on Design Additional Fee Estimation by Change Order - Focused on Design Stage - (설계변경에 따른 설계추가용역비 산정에 관한 연구 - 설계단계 중심으로 -)

  • Park, Won-Ho;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.155-158
    • /
    • 2009
  • During the construction project period, a lot of change orders happen in the design and construction stage Especially, The change order during construction stage causes the huge construction cost increase and duration delay. Accordingly, research on the change order of the construction stage is being progressed relatively active in the design stage, but the design changes are rarely made. In the design stage, the owner has to pay a design addition cost when change order due to the demands of owner happens. However Korea has not the specific standard about design additional cost in design stage. Therefore, this study analyzes problems of design additional cost estimation methods through the case study, and then indicates the method that the ratio distributes to details dividing design tasks and the method of the PM(Project Management). Eventually, this study expects to minimize claim related the design additional cost in design stage.

  • PDF

Application of Probabilistic Risk Analysis for Profitability-Evaluation of Apartment Reconstruction Projects (아파트 재건축사업의 수익성평가에 대한 확률적 위험도 분석 모형 적용방안)

  • Woo, Kwang-Min;Lee, Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.167-176
    • /
    • 2006
  • It was found that Korean Standard of Estimate which has been used as the only basis of cost estimate of public construction projects had some side effects such as jerry-build construction and over-estimation because it failed to reflect the current price and the state-of-the-art construction methods in a changing construction environment. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004. This paper presents analytic criteria and a process model for deducing more current and reasonable historical construction cost for contract items from not only previous contract prices but also all of the other bid prices that were not contracted. The procedure of estimating actual unit cost proposed in this paper focuses on the removal of abnormal values including strategically too low or high prices and the time correction. In addition, basic research is conducted for the correction of actual unit cost through the analysis of fluctuation of bid price depending on bidding types and rates of successful bid. It is anticipated that the effective use of the proposed process model for estimating actual unit cost would make the cost estimation more current and reasonable.

Analysis and Realistic Estimation of Maintenance Cost of Construction Equipment Expenses (건설기계 경비의 관리비 구성 분석 및 현실화)

  • Kim, Kyung-A;Huh, Young-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.503-508
    • /
    • 2007
  • The Equipment Expenses section of the Poom-Saem, that is used for Construction Cost Estimation on public sectors in Korea, has been rarely revised, and so does not reflect changes of construction equipment technology and construction methods, since it was established based on data from Japan and the U.S in the early 1960s. In order to make reasonable estimation of maintenance costs(Interest, Storage, Insurance, Tax), the equipment expenses section of the Poom-Saem and the domestic and overseas documentary records were investigated. Further, 16 construction sites were visited, and 20 Construction Equipment leasing services were surveyed. Based on results from analysing figures related with the estimation of maintenance costs, the maintenance cost is redefined. Then, construction equipment was classified into 6 exclusive construction equipment and general one, and realistic figures of the maintenance cost, which consists of interest, storage, insurance, tax, are suggested respectively. The optimum level of each item which consists of equipment costs was revealed based on the result of the analysis on the figures of equipment costs calculation from the Poom-Saem and the collected data. The research will be the foundation that helps to estimate appropriate construction costs and the ground work of related studies.

  • PDF

Cost Analysis Study : Development of HVAC&R System Cost Estimation and Prediction Methodology for Office Buildings (사무소 건물의 HVAC&R 시스템 공사비 분석방법 및 예측에 관한 연구)

  • Cho, Jinkyun;Shin, Seungho;Kim, Jonghurn
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.26 no.3
    • /
    • pp.115-121
    • /
    • 2014
  • HVAC&R system costs can often be one of the most expensive components, representing approximately 15% of the total construction cost for office buildings. Despite their significant importance, there is a lack of a consistent and homogeneous framework to approximate the estimate research. This research deals with the prediction methodology of HVAC&R system cost with the aim of establishing a common idea for the analysis of the construction cost estimate. Our approach deals with the concept of an HVAC&R set that is composed of subsystems. The matrix combination analysis is examined, and total 960 HVAC&R system cost estimation can be implemented to large scale office buildings.