• Title/Summary/Keyword: construction case

Search Result 6,334, Processing Time 0.035 seconds

The method for the classification according to their kinds and the estimation of unit generation rate for promoting recycling of construction and demolition(c&d) debris (건설폐기물 재활용촉진을 위한 종류별 분류 및 발생원단위 산정 방안)

  • Lee, Hi Sun;Kim, Dong Sik
    • Journal of the Society of Disaster Information
    • /
    • v.4 no.1
    • /
    • pp.86-100
    • /
    • 2008
  • It is needed to classify the kinds of construction and demolition(c&d) debris to 6 catagories of waste concrete, waste asphalt concrete, waste wood, scraps, combustible waste and incombustible waste in order to properly do a separate discharge and to estimate unit generation rate in construction site. Also, in this case, the unit treating cost for mixed wastes should be applied with the unit treating cost for combustible waste. The construction standard materials estimation data is used for basic data for estimating unit generation rate. The mixed wastes in this data should be classified to waste wood, combustible waste and incombustible waste, and their ratio is obtained by using the unit generation rate of Asia Pacific Environment and Management Institute and Seoul Metropolitan Development Institute. The waste amounts generated from newly-built construction can be obtained from multiplying the loss rate by the amount of materials used from construction standard estimation data. Also, those from dismantling construction can be obtained by subtracting waste amount generated during newly-built construction from total input amount of materials in newly-built construction. Those in two cases can be used in construction site. It can be used for estimating the amount generated and establishing the treating plan in the case of setting up the policy of waste management and doing the environment impact assessment.

  • PDF

Development of a methodology for analysing and quantifying the impact of delay factors affecting construction projects

  • Shebob, Abdulhamid;Dawood, Nashwan;Shah, Raj K.
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.3
    • /
    • pp.17-29
    • /
    • 2012
  • Delays are one of the biggest problems facing by the construction industry and they have significant financial and social impact in construction projects. The paper presents a framework of Delay Analysis System (DAS) with the aim of analysing the impact of delay factors in Libyan construction projects. The system has designed by integrating the possible delay factors, critical activities of a project using@risk simulator. A case study of building project was demonstrated to identify the impact of delays and the sensitivity of delay factor. The case study result showed that the project might be delayed by 97 to 103 days in comparison to the planned duration. The developed DAS is a tool for analysing and identify the impacts of delay factors and assist to construction manager to take necessary measure in reducing the delay impact. The paper provides a methodology for analysing the possible delay impact in a construction project and informing to construction manager in advance of the possible delay factors.

The Visual Impact Assessment in Dam Construction Using Visual Impact Assessment Method (경관영향평가 기법을 통한 댐건설에 대한 경관영향평가)

  • 김대현;구본학
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.27 no.4
    • /
    • pp.80-86
    • /
    • 1999
  • The purpose of this study was to suggest a case study and anlaysis of the visual impact in dam construction through visual impact assessment method in Dong-sang river. The results can be summarized as follows; 1) For the evaluation of the visual impact of dam construction, five steps such as field analysis of visual status, finding visual sensitivity area and visual control point, making visual simulation material and evaluation, and visual impact analysis and assessment were suggested as desirable. 2) In the case study, the visual impact of dam construction was evaluated to be simple, unique, modern, static, cool and unfamiliar. 3) There was a few difference between the pre-construction and post-construction in statistical test. Especially, The dam in Man-Jee area was evaluated to be artificial, unique and destroyed in statistical difference, and then we design dam structure with visual friendliness. 4) In conclusion, there was high correlation between pre-construction landscape and post-construction landscape through semantic differential scale method using eleven adjectives. Therefore, we state that there is no visual impact for the dam construction for the moment.

  • PDF

Risk Analysis of Lifting Work for Risk Assessment of Modular Construction (모듈러 건축 현장의 위험성평가를 위한 양중작업 위험요소 분석)

  • Jun, Young-HUN;Kim, Kyoon-Tai;Jeon, Eun-Bi
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.291-292
    • /
    • 2021
  • In modular construction, it is insufficient for safety management of workers, and workers are still exposed to the risk of accidents due to work at high places for lifting and assembly work in modular construction sites. Therefore, it is necessary when preventive safety management through risk management of workers on modular construction sites. This study is a basic study for the risk assessment(checklist) of modular construction, and the purpose of this study is to analyze the risk factors of the module lifting work at the modular construction site. It is intended to identify the hazard risk factors and improvement measures of the existing lifting operation, by analyzing the case of the risk assessment of the existing RC method, and to identify the risk factors for each work process when lifting the module. In the future, the results of this study are expected to be utilized in the development of checklists for risk assessment as safety management plan for modular construction sites.

  • PDF

SAFETY MANAGEMENT ON CONSTRUCTION MANAGEMENT: A CASE STUDY REVIEW

  • Eric Chan
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.249-255
    • /
    • 2011
  • Poor safety management in construction management may adversely affect cost, schedule and quality of a project. Heavy fines upon safety offence becomes a burden to the budget; losing working hours as a result of safety incident impacts on the schedule, and compromising quality is always an indirect consequence when workers perform duties in an unsafe site environment. Therefore, promotion of safety management becomes the top priority in any construction manager's agenda. Working safely will benefit construction project and lead to a "real" success. This paper is a case study, based upon "Geller's 10 principles for achieving a total safety culture", reviewing how a Hong Kong leading construction company fosters the safety culture and possesses a pleasant safety record over years. Its safety performance is not only well ahead the local industry, but also ranges top within the Asia Pacific region and comparable to those mature Western industries. The review concluded that safety culture is one of the major components in construction management and collaboration is the essence to realize this positive culture within an organization. Safety management is not merely a "top down" approach, but requires the positive "bottom up" actions from the other end. The successful story of this company can demonstrate the contribution of safety management in construction management.

  • PDF

A Case Study on the Application of T.B.M Tunnelling in Hard Rock (HARD ROCK에서의 T.B.M 공법 적용사례)

  • 박용운;박홍조
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1993.10b
    • /
    • pp.103-118
    • /
    • 1993
  • The application of T.B.M tunnelling has been progressively increased since the first entrance into Korea in 1985 and especially, its higher performance and safety is widely proved as a generalized tunnelling in hardrock tunnel construction, comparing wi th conventional method. This case announcement will be much helpful for your general understanding of T.B.M tunnelling and the development of tunneling technology by introducing the brief methods and construction results from the actual application cases of T.B.M tunnelling in Ulsan Water Supply Tunnel Project, the longest tunnel in Korea under construction by YOU ONE. Co.

  • PDF

Case Study on Facility Management for an Internation School (국제학교의 시설관리 사례연구)

  • Jang, Myung-Houn
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.97-98
    • /
    • 2016
  • It is important to manage an educational facility used by many students. The office of education has responsibility to manage public school facilities instead of most elementary, middle, and high schools. Some school or university outsources facility management and maintenance. An international school in Jeju is established by BTL (Build-Transfer-Lease) that includes construction and maintenance. This research objective is to analyze the case of facility management in the international school, and to provide improved method for school maintenance.

  • PDF

A Case Study on Social Conflicts Of high speed Rail Construction Projects (고속철도건설사업의 사회적 갈등에 관한 사례 연구)

  • Choo, Jun-Sup;Oh, Ju-Hwan;Kim, Si-Gon
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.2442-2447
    • /
    • 2008
  • Concept of conflict management system and necessity of introducing it into the executing process of public projects have been subjects of any previous studies. Those systems are, however, not practically applicable to rail projects given the unique nature of rail industry. In this context, the author presented cases of conflicts emerged during the process of the Gyung bu High Speed Rail Construction Project and mapped out realistic case study applicable to construction sites.

  • PDF