저탄소 녹색도시를 위한 태양에너지 이용 선진사례 조사 (Best Practices Research Use of Solar Energy For Low Carbon Green City)

  • 김지수;이응직;이충식
    • 한국태양에너지학회:학술대회논문집
    • /
    • 한국태양에너지학회 2009년도 춘계학술발표대회 논문집
    • /
    • pp.37-42
    • /
    • 2009
  • We are in search for many method at 21th century thinking about the environment internationally. One is among them low carbon green city. Consequently this dissertation put a system solar energy key point of low carbon green city and purpose of low carbon green city Besides system and technique about the solar energy best practices try to do the investigation analysis. It's important of low carbon green city's environmental friendly system such as solar heat system, solar power generation, ecological greening, All these systems are connected each other and organize low carbon green city. A solar energy system uses pure energy of the situation directly most among the environmental friendly system. Energy saving and environment-friendly city in the world must do not a choice. However, recognition conversion and infrastructure of the Korea still has not come true. But South Korea and the international best practices is not the same system. But plan to solar city, the concept of green city in Cheongju, Deagu local government. And many meetings are in progress.

  • PDF

선진 사례 벤치마킹을 통한 국내 모듈러 건축 시공 프로세스 제안 (Modular Building Construction Process Development by Benchmarking International Best Practices)

  • 신현규;안용한
    • 한국건설관리학회논문집
    • /
    • 제17권6호
    • /
    • pp.3-12
    • /
    • 2016
  • 본 연구의 목적은 모듈러 건축 프로젝트를 수행하는데 발생할 수 있는 위험요인을 도출하고, 해외 선진사례 분석을 통해 도출한 관리요소를 벤치마킹함으로써 국내 적용 가능한 모듈러 건축 시공 프로세스를 제안하는 것이다. 본 연구를 수행하기 위해 해외 대표적인 모듈러 건축 사례인 미국 애틀랜틱 야드 B2 프로젝트를 분석하고 내용분석법을 통해 모듈러 건축 시공 단계에서 발생할 수 있는 위험요인을 도출하였다. 본 연구결과인 모듈러 건축 시공 프로세스를 기반으로 모듈러 건축 설계, 제작 단계부터 시공 단계에 발생되는 위험요인을 고려하여 관리한다면, 시공 과정에서 발생할 수 있는 잠재적인 위험요인을 사전에 방지하고, 시행착오를 줄여 모듈러 건축 시공성도 향상시킬 수 있을 것이다. 또한, 모듈러 건축 프로젝트를 효율적으로 관리함으로써 모듈러 공법의 장점인 공기 단축 및 공사비 절감을 실현하고, 결과적으로 시공품질을 확보하여 모듈러 건축 활성화에 기여할 수 있을 것이다.

USING PROCESS MAPPING IN CONSTRUCTION PROCESS TO REDUCE CHANGE ORDERS

  • Sang-Hoon Lee;Carolina Fuzetti;Lingguang Song;Kyungrai Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.616-621
    • /
    • 2009
  • Change orders represent one of the largest sources of cost growth on construction projects, but an efficient change management control system can help the projects steer clear of the constant construction changes. This study was performed to achieve a better understanding of all changes and to develop a new set of Best Practices using process mapping techniques. The project data for this research were collected from case studies of aviation projects implemented in Houston, Texas at Bush Intercontinental Airport. The findings and contributions of this research should help owners and project managers determine and identify major causes that impact project budget and schedule and implement solutions prior to them surfacing.

  • PDF

EVALUATION OF SUSTAINABILITY OF CONSTRUCTION OPERATIONS: A FRAMEWORK FOR THE NEW ZEALAND CONSTRUCTION INDUSTRY

  • Jasper Mbachu
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.550-557
    • /
    • 2009
  • The concepts of 'sustainable development', 'sustainable construction' and 'green building' have been elevated to priority levels in all types and phases of construction project development worldwide. Consultants and contractors are now required to seriously consider the impact of their operations on the natural environment and the society, and consequently adopt sustainable construction practices in the development process to minimize and mitigate the negative impacts of their activities. However, existing sustainability rating tools apply to the design, post-construction and operation phases of a building; no tool exists for the rating of the performance of the contractor or the project team at the construction phase. This study aimed to develop a model for evaluating the sustainability of construction operations, drawing on the global best practice standards on sustainability. Practical applications of the model were carried out through case studies to evaluate the performances of fifteen construction firms in New Zealand. The developed model and the outcomes of the case studies were presented, including potential areas of weaknesses, strengths, constraints to achievement or adoption of sustainable construction practices and areas for improvement in the operations of the firms. The successful application of the developed model in practice shows its usefulness and ease of application. It is therefore recommended for adoption as a simple but effective system for measuring and reporting on sustainability performance or sustainability of construction operations of firms in New Zealand and elsewhere.

  • PDF

Exploring Long-Term Performance in Design-Build Best-Value Evaluation Criteria

  • Calahorra-Jimenez, Maria;Poore, Tanner
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.74-82
    • /
    • 2022
  • Improving long-term performance in highway projects is an imperative goal for public administrations. Project delivery and procurement methods might provide an opportunity to align design and construction processes with this goal. Previous studies have explored whether project delivery methods impact the long-term performance of highway projects. However, these studies did not focus specifically on how core elements within the procurement might relate to long-term performance. Thus, this research aims to fill this gap by exploring to what extent and how long-term evaluation criteria are considered in design-build best-value procurement of highway projects. To this end, content analysis was conducted on 100 projects procured between 2009 and 2019 by 19 DOTs across the U.S. The analysis of 365 evaluation criteria found that (1) roughly 11% of them related to long-term performance. (2) The weight given to these criteria in the overall technical proposal was lower than 30%. (3) Sixty-five percent (65%) of long-term evaluation criteria focused on design while 15% related to materials and technology, respectively. The results of this study are a first steppingstone to initiate a deep exploration of the relationship between procurement practices and actual project performance. Currently, with sustainability and life cycle assessments being top concerns in infrastructure projects, this line of research might be of particular interest to DOTs and highway agencies across the U.S. and worldwide.

  • PDF

Measuring Performance to Engage the Extended Project Team in Construction

  • Bal, Menoka;Bryde, David
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권1호
    • /
    • pp.1-10
    • /
    • 2015
  • In construction, stakeholders of extended project team play a key role in the overall project performance. Successful integration of stakeholders demands for good management practices at strategic, operational and project levels. Targets and measures to improve the stakeholder performance encourage the creativity and willingness of stakeholders of extended project team to develop the better ways to achieve the project objectives. This paper presents a generic descriptive method, showing how stakeholder's ability and influence impacts on project performance in the construction sector. The findings of a series of interviews with key informants are presented and the following main conclusion is drawn: improving project performance through stakeholder's contribution and measuring their performance can strengthen the project performance. This innovative approach which redefines the process of improving the project performance in construction projects will be of interest to those who intend to manage the projects in practice as well as to those who interested in advancing theory.

Building Smarter City through Big Data - Best Practices in Seoul Metropolitan Gov.

  • Kim, Ki-Byoung
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.19-20
    • /
    • 2015
  • Since 2013, Seoul Metropolitan Government (SMG) has introduced big data initiatively in administration and put into practices in transportation, safety, welfare in order to overcome limited resources and conflicting interests. For establishing a new midnight bus service, SMG prepared optimized midnight bus routes by analyzing big data from mobile phone Call Data Record (CDR) through collaboration with a telecommunication company. Despite of limited budget and resources, newly identified routes can cover over 42% of the citizen with 9 routes and less than 1% of buses compare with day time operation. In addition to solve transportation problem, SMG utilizes big data to resolve location selection problem for choosing new facility locations such as life double cropping centers and senior citizen leisure centers. As results, SMG demonstrates big data as a good tool to make policies and to build smarter city by overcome space-time limitation of resources, mediation of conflicts, and maximizes benefit of the citizen.

  • PDF

Conflict Avoidance in Construction Projects: Six 'C' Rescue Factors

  • Acharya Nirmal Kumar;Lee Young-Dai;Kim Sa-Myeong
    • 한국건설관리학회논문집
    • /
    • 제6권6호
    • /
    • pp.193-204
    • /
    • 2005
  • Conflict is aroused when different people having different interest work together for fulfilling same the objectives. As the construction field is large, complex, volatile and requires tremendous capital, there are always greater challenges and possibility of risks of conflicts. Poor management practices in construction site and trying to protect risks and threats by contracting parties are the cited sources of the construction conflicts. The best management practice is to resolve the problems before these cultivate as conflicts. This paper has identified six dispute avoidance factors-Convince, Coordination, Consideration, Compromise, Consolation and Coercion. Six 'C' factors described in this paper are the mantra (formula) to execute a conflict free construction project. The conflict avoidance factors have been verified through a successfully executed project called TEVT development project (Technical Education and Vocational Training) during 1993-1998 in Nepal. The results show that the six 'C' factors 'C' considered during the implementation of the project, construction conflicts would be controlled or minimized effectively.

CM(ConstructionManagement)에의 효율적 BIM활용에 관한 연구 (A Study on the good use of Construction Management Model based on BIM)

  • 민영기;김경준
    • 한국디지털건축인테리어학회논문집
    • /
    • 제10권3호
    • /
    • pp.87-95
    • /
    • 2010
  • The CM(Construction Manager) of D-university has been seeking the advice of my BIM-team to adopt CM(Construction Management) and BIM best practices to improve project delivery results, and has authored best practice reports for spatial validation, BIM, 3D, 4D and 5D performance. Building Information Modeling(BIM) Process, Integration, and Adoption looks at BIM implementation from a company and project level laying out a process for companies to use BIM. Following this studies, participants will be able to: 1. BIM participants has been creating a BIM process diagram for a project, and has been evaluating and selecting process options for a specific BIM project. 2. BIM participants has been describing the roles and responsibilities of participants in the BIM process, and has been communicating the BIM process to management, colleagues, and project stakeholders. 3. BIM participants has been identified consistent factors influencing BIM return on investment at the project level and the company level, and has been outlining a process for BIM adoption on the project level and company level.

DEVELOPMENT OF A FRONT END PLANNING TOOL FOR SUSTAINABILITY

  • Sang-Hoon Lee;Spencer Howard;Lingguang Song;Kyungrai Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.506-513
    • /
    • 2009
  • The Construction Industry Institute (CII) developed the Project Definition Rating Index (PDRI), as a part of their Front End Planning best practices, which helps project managers assess and measure project scope definition risk elements. U.S. Green Building Council are seeing the benefits of sustainable building and Leadership in Energy and Environmental Design certification by positively impacting life cycle costs, building marketability, and organizational productivity. However, there have been no efforts to integrate these two planning tools in construction industry. By applying a supplemental tool which combines the PDRI with the LEED rating system, construction industry can develop and implement a tailored instrument that leads to total project success in sustainability. The objective of this research is to assemble a new front end planning mechanism for green buildings by incorporating the current PDRI and LEED systems.

  • PDF