• Title/Summary/Keyword: construction and management

Search Result 11,604, Processing Time 0.077 seconds

An Empirical Study on Top Management's Leadership in Construction Quality Management Activities and Construction Quality Management Performance (최고경영자의 리더십이 건설품질경영활동과 건설품질경영성과에 관한 실증연구)

  • Cho, Jin-Ho
    • Journal of Korean Society for Quality Management
    • /
    • v.45 no.3
    • /
    • pp.403-426
    • /
    • 2017
  • Purpose:?The purpose of this study is to analyze the causal relationship between top management 's leadership and construction quality management activities that affect construction management performance based on construction quality management. Methods:?As its method, the causal relationship between the leadership of top management and the key management factors of construction quality management activities affecting management performance is analyzed by using the structural equation model. The construction companies used in the analysis sample conducted surveys on companies that are conducting ISO, KOSHA, OHSAS, DQC, and so on. Results:?It was revealed that top management's leadership has a great influence on management performance and all management factors of construction quality management activities. However, safety management does not affect the management performance of construction quality management activities. And top management's leadership on management performance are explained by the mediating effect of cost, time, quality and communication among management factors of construction quality management activities. Conclusion:?In the previous study, the quality management activities and the ISO - based integrated total quality management system (TQM) applied in the manufacturing or service industries were presented as empirical results. However, this study presents the results of different studies by presenting empirical study results by selecting time, cost, quality, safety and communication as key management factors of quality management activities of construction companies through reviewing and analyzing previous studies in construction field.

CONSTRUCTION MANAGEMENT KNOWLEDGE IN PREPARING AND RESOLVING CONSTRUCTION CLAIMS

  • Ting-ya Hsieh
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.681-686
    • /
    • 2005
  • This paper discusses the role of construction management (CM) profession in claims management. It reviews the attitudes, psychology and practices relevant to CM knowledge. It is the purpose of this paper to highlight CM profession's knowledge in this area as this profession's core competence in contemporary construction.

  • PDF

A FRAMEWORK FOR ACTIVITY-BASED CONSTRUCTION MANAGEMENT SIMILATION

  • Boong Yeol Ryoo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.732-737
    • /
    • 2009
  • Due to various project delivery methods and the complexity of construction projects in the construction industry, developing the framework of construction management for critical, highly complex projects in the construction industry has become problematic. Currently, a set of construction manuals play a pivotal role in planning and managing construction projects as subcontractors try to complete their scope of work according to the instructions of a general contractor. It is challenging for general contractors to write a construction management procedure manual to cover various types of project delivery methods and construction projects. In construction, the construction procedure manuals describe specific actions to be taken through the project. In reality a few contactors own such manuals and their construction schedules include more construction operation activities. Thus, it is hard to estimate the workload and productivity of construction managers because the manual and the schedule do not present the amount of management efforts required to complete a project. This paper proposes a framework to present construction management tasks according to project delivery methods which can be applied to various construction projects. Actions for management tasks were mapped and were integrated with construction activities throughout the project life cycle. The framework can then be used to give specific instructions to project participants, collect management actions, and replicate management actions throughout the project life cycle. The framework can also be can used to visualize complete construction project to analyze and manage construction management activities in each phase of a project in order to enhance productivity and efficiency. The studies of existing construction manuals were carried out to identify construction managers' responsibilities. An artificial intelligence program, CLIPS (C-Language Integrated Production System) was used to search for appropriate actions for impending tasks from a set of predefined actions to be performed for a given situation. The framework would significantly help construction managers to understand interrelations among management tasks or actions within a project. Furthermore, the framework can be embedded into Building Information Modeling (BIM) or Facility Management Systems (FMS) so that designers and constructors would execute constructability review before construction begins.

  • PDF

Project Cost Management in Construction Industry in Ho Chi Minh City

  • Kim, Soo-Yong;Tuan, Kiet Nguyen;Luu, Van Truong;Le, Tam Thuong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.70-71
    • /
    • 2015
  • Cost management always being the matters for project manager as well as other entities involved the construction projects. Vietnam is emerging country, many construction works were carried out and lot of construction projects will be developed in the near future with a huge investment capital come from outside and inside Vietnam. In recent years, international project management firms enter the Vietnam construction market, some issues emerged need to be solved. In which cost and schedule of the construction project was put in a thoroughly consider of not only project management team but also stakeholders. The research attempts to identify and assess the relationship of factors affecting the construction cost in construction phase in Ho Chi Minh City, Vietnam. Five main factor groups Owners/clients; Consultants; Contractors; Resource and Other were identified to propose the solution for cost management.

  • PDF

A CASE STUDY OF CONSTRUCTION ENGINEERING FOR CABLE SUPPORTED BRIDGE BY COLLABORATIVE SYSTEM

  • Jung-Min Nam;Sung-Ho Kim;Jae-Hong Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.586-590
    • /
    • 2011
  • This paper presents the case study of the CE by collaborative system and proposes a model of the CM group for the cable supported bridge. The cable supported bridges have a large project scale and need a high level of construction method. Therefore an advanced construction management system is required for successful completion of project. The construction management (CM) group which control design management, construction plan, subcontract, technical support and R&D is organized for the cable supported bridge project. The CM group established a collaborative system with construction site and drew an effective management of cost, process, quality, safety for each project. Furthermore, the CM group established the procedure of construction management based on the construction engineering (CE) items and performed the project management on the construction phase. Efficiency of cost reduction and site control is maximized by using a collaborative system.

  • PDF

CONSTRUCTION MATERIAL MANAGEMENT USING SMART MOBILE COMPUTING

  • Kwang-Pyo Lee;Hyun-Soo Lee;Moonseo Park
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.221-228
    • /
    • 2011
  • As construction works have become larger and more complex, improving productivity by introducing Information Technology (IT) is pursued and more effective construction management is needed in construction industry. In this circumstance, many different kinds of project management system is being introduced, and various IT technologies are applied such as Personal Digital Assistant (PDA), Bar Code, Radio Frequency Identification (RFID), Web Camera, and so on. However, these kinds of technologies might cause re-processing of information and ineffectiveness of project because of lack of real time information processing technology or separation between construction sites and management offices. Meanwhile, these technologies rather decrease the construction productivity except for the data saving and database function. Therefore, this research aims to develop Application that can be applied efficiently for construction material management, by understanding problems of former management system with questionnaires and extracting functions with analysis of requirements. In virtue of the construction material management Application which will be developed in this study, it will be possible to input information automatically, to process and check material information in real time, and to identify the location of necessary material. Then, the problem of separation between construction sites and management offices are solved, and as a result, more efficient management of materials in construction sites will become possible. At the same time, this study will investigate the possibility and applicability of new IT device, Smart Phone to construction sites.

  • PDF

THE EFFICIENT ESTIMATE OF ENVIRONMENTAL MANAGEMENT COSTS IN THE CONSTRUCTION SITES

  • Hyuk Moon;Sung-Jin Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.437-446
    • /
    • 2005
  • Recently as people's values are changing from development phase into running stage after quality of life, so that the needs of environmentally friendly construction are gradually increasing. Also populace discontent about the pollution during construction process such as the noise and vibration caused by construction machinery is increasing. Even though it is impossible to eliminate the construction pollution fully, it is necessary to make efforts to reduce construction pollution to a minimum. In terms of construction site operating, the first possible step for solving these matters directly is that the necessary sum of expenses must be secured as the environmental management costs in the conceptual phase. However, in fact, the environmental management costs have not been secured in the budget. Generally it is the major reason not arising proper activities to prevent the pollution in the construction site. The purpose of this research is to suggest the efficient budgeting method regarding Environmental management costs to ensure the necessary sum of environmental management expenses. To provide an efficient budgeting method, interviews with the person in charge of environment management was conducted. 78 construction sites was surveyed and environmental management costs were analyzed through their historical data from the survey. According to the results of analysis, the ratio of environmental management costs is revealed 0.45% of construction cost as average comparing 0.2% of legal limit. And usually the environmental management cost was appropriated into the safety management budget. So it is needed to isolate environmental management budget securely and modify the ratio of Environmental conservation Costs in Construction Technology Management Act.

  • PDF

Strategies for Facilitating Post-Construction Evaluation and Management System (건설공사 사후평가 제도 활성화 방안 수립)

  • Lee, Kang-Wook
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.379-380
    • /
    • 2023
  • The Post-Construction Evaluation and Management System has been operated over the past 20 years not only to analyze the performance of large-scale construction projects, and but also to provide useful reference data for future similar projects. Although the Post-Construction Evaluation and Management Center has been legally designated and operated since 2020, various problems have been occurring in the operation of the system. Accordingly, this study proposes strategies for facilitating Post-Construction Evaluation and Management System in terms of the following three aspects: (1) improving the implementation rate of post-construction evaluation; (2) improving the information management system related to post-construction evaluation; (3) improving the utilization of post-construction evaluation outcomes. Based on the results of this study, a specific action plan will be prepared, which is expected to contribute to the efficiency of construction project performance management in the future.

  • PDF

Application of Construction Management techniques in Small Construction Projects (소규모 프로젝트의 효율적인 공사관리방안)

  • Lee, Sang-Beom;Lee, Dong-Un
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.4
    • /
    • pp.95-102
    • /
    • 2003
  • A construction project's period is limited by the order manufacture. And a construction project is requested a specific place, and has the characteristic to be irregular. Today, construction is to be representative high-cost and low-efficiency. This kind of problems appears in small construction projects more often than large construction projects. According to this facts, we recognized necessity of making practical application in methods of construction management. Also, we suggest application and establishment of integrated responsibility management department, PMIS(Project Management Information System) and Data Base. From now on, methods of construction management could be good opportunities for small construction projects and local construction companies. Therefore, small and local construction companies should try to improve their abilities. Likewise, the countries systematize to constitute the relation laws.

Selection of Frontier Green Construction Product

  • Hyounseung Jang;Seokin Choi;Boknam Lee;Wooyoung Kim;Chulki Chang;Younghwan Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1426-1432
    • /
    • 2009
  • Green growth is summarized as the national growth strategies to enhance the quality of life as a whole by converting not only the lifestyle but the economic and industrial structures into the low carbon and eco-friendly environments with the green growth industries with low carbon as the momentum for new growth, based on green technologies including renewable energy technologies, energy and resource efficient technologies, converging technologies related to technologies to reduce the environmental pollution. Roles of the construction industry along with other industries are very important in securing justifications for the cooperation between our government and industries for challenges to this green growth as well. The national effects of economy are very large from leading the construction industry to the green construction from the national level. Accordingly, this study suggested responsive plans for both government and companies for the activation of green construction by selecting 15 frontier green construction products and analyzing them by the type of strategy in Korea, as well as analyzing recent trends of overseas green construction.

  • PDF