• Title/Summary/Keyword: construction ability

검색결과 955건 처리시간 0.026초

Time-Profit Trade-Off of Construction Projects Under Extreme Weather Conditions

  • Senouci, Ahmed;Mubarak, Saleh
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권4호
    • /
    • pp.33-40
    • /
    • 2014
  • Maximizing the profitability and minimizing the duration of construction projects in extreme weather regions is a challenging objective that is essential for project success. An optimization model is presented herein for the time-profit trade-off analysis of construction projects under extreme weather conditions. The model generates optimal/near optimal schedules that maximize profit and minimize the duration of construction projects in extreme weather regions. The computations in the model are organized into: (1) a scheduling module that develops practical schedules for construction projects, (2) a profit module that computes project costs (direct, indirect, and total) and project profit, and (3) a multi-objective module that determines optimal/near optimal trade-offs between project duration and profit. One example is used to show the impact of extreme weather on construction time and profit. Another example is used to show the model's ability to generate optimal trade-offs between the time and profit of construction projects under extreme weather conditions.

BIM 프로젝트 시공단계의 설계오류 검토 방안에 관한 연구 (A Study on the Review Methods of Design Errors in Construction Phase of BIM Project)

  • 이세잎;심운준;안용선
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.25-27
    • /
    • 2012
  • The domestic construction industry recognize that review of design and construct-ability has the devastating effects. The way to take advantage of BIM for increase the possibility of discovered the design errors in advance are being discussed a lot recently. Since 2012, Public procurement published that the Turn-key project which is the more than 50 billion won in construction have to let the BIM-based design be mandatory. However, people expected the advent of BIM technology can resolve the existing design errors. But the situation is the connection of design stage and construction stage is very insufficient in domestic. Therefore, in this study understanding the types of design errors in construction phase. according the review of design errors before construction. Then can acceleration the application of BIM to improve the workability in a construction site.

  • PDF

시멘트 액체방수 공사의 작업조 기반 품셈을 위한 생산량 및 노무량 분석 (Analysis of Actual Labor and Productivity for Based Work Crew Standard of Cement Liquid Watertight Construction)

  • 하기주;최민권;이동렬;하민수;하재훈;김외곤
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.171-174
    • /
    • 2009
  • The standard estimation system, used to estimate the predetermined cost of construction work, is measured by the standard and typical construction methods and field conditions. And the standard estimation system is applied to basic data for the measuring of construction cost, such as the consumed quantity of material, labor hours, and machinery cost. However it does not reflect sufficiently for the diversity and reality of constructions work Therefore, this study is recognized the necessity of new cost estimation models for the rational construction cost estimation. To improve estimation technique and construction ability, it was analyzed labor hours, production volume based on the work crew in construction work.

  • PDF

Individual Factors Influence on Client Involvement: the Case Construction Projects in Saudi Arabia

  • Trigunarsyah, Bambang;Al-Solaiman, Sultan
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.578-582
    • /
    • 2015
  • Lack of client involvement in construction of public projects has been identified as the main cause of many operational problems. Clients need to perform their roles and responsibilities effectively and efficiently at the right time and through the use of correct methods in order to have the optimum involvement required during all the construction project phases, namely, the planning, design, construction, handover, and operation and maintenance phase. This paper investigates the influence of clients' individual factors on their involvement in construction project delivery. A questionnaire survey was distributed to various government agencies of the Kingdom of Saudi Arabia (KSA). Explanatory Factory Analysis was performed to group nineteen individual factors. The factor analysis result suggests that the individual factors that can involve clients' involvement in construction projects can be grouped into five, which are: adequacy of knowledge and experience for decision making in the early stage of design; ability to communicate clearly; job satisfaction; personal skills; and expertise in design and construction.

  • PDF

일상적 창의성과 문제해결능력의 관계에서 공학계열 대학생의 팀워크역량과 자기주도학습력의 이중매개효과 분석 (Analysis of Dual Mediation Effect of Teamwork Competence and Self-Directed Learning Ability between Daily Creativity and Problem Solving Ability of Engineering Students)

  • 배성아;옥승용;노수림
    • 공학교육연구
    • /
    • 제23권6호
    • /
    • pp.17-26
    • /
    • 2020
  • In this paper, the effect of daily creativity of engineering students on problem-solving ability is addressed through the dual mediating effect of teamwork competency and self-directed learning ability. To this end, a regression-based statistical mediation analysis has been performed on the dual mediation model in which daily creativity and problem solving ability were treated as independent and dependent variables respectively, and teamwork competence and self-directed learning ability were included as mediation variables. The analysis result confirmed that the daily creativity has direct effect on the problem-solving ability, as well as indirect effects through teamwork competence and self-directed learning ability. In particular, the serial mediating effect of teamwork competency and self-directed learning ability was also confirmed to be statistically significant in the relationship between daily creativity and problem-solving ability. This verifies that problem-solving ability can be improved not only directly by improving daily creativity but also indirectly by improving teamwork competence and self-directed learning ability. In addition, teamwork competency showed greater indirect effect on problem-solving ability than self-directed learning ability, so increasing teamwork competency has a more significant effect on improving problem-solving ability than increasing self-directed learning ability. Therefore, in order to develop better problem-solving ability, it is necessary to identify and improve the learners' teamwork competency first and to strive to create an environment where learners can solve problems based on mutual trust with their teammates.

국내 CM방식의 현황 및 활성화 분석에 관한 연구 (An Analysis on the Current Status of Domestic Construction Management)

  • 윤병식;이정현;유정호;김창덕
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.483-486
    • /
    • 2007
  • 1997년 '건설산업기본법'의 개정으로 CM방식이 도입 된지 10년이 지났고, 관련 연구 또한 활발히 진행되고 있다. 하지만 기존연구에서의 CM방식 적용에 대한 현황 분석은 공공부문에 한정되어 있으며, 활성화 여부를 판단하는 근거 또한 제한적인 자료를 활용하고 있는 것으로 판단되어 2003년부터 실시된 CM능력평가공시자료를 토대로 국내 CM시장 현황을 건수/금액 측면에서 비교, 분석하였다. 국내 건설시장은 2002년 이후 매년 발주건수가 감소하고 있으나 발주금액은 늘어나고 있으며, CM시장은 계약건수, 계약금액 모두 과거에 비해 증가하고 있는 것으로 나타났다. 계약건수 점유율 측면에서 민간, 공공부문 모두 활성화 되고 있었으나, 계약금액 점유율 측면에서는 활성화 정도가 낮은 것으로 나타났다. 하지만 국내 경제성장과 건설시장의 성장에 비해 CM시장의 성장이 더 크게 나타났고, 이는 CM방식이 활성화되고 있다고 판단할 수 있을 것이다.

  • PDF

Deformation Monitoring and Prediction Technique of Existing Subway Tunnel: A Case Study of Guangzhou Subway in China

  • Qiu, Dongwei;Huang, He;Song, Dong-Seob
    • 한국측량학회지
    • /
    • 제30권6_2호
    • /
    • pp.623-629
    • /
    • 2012
  • During the construction of crossing engineering one of the important measures to ensure the safety of subway operation is the implementation of deformation surveying to the existing subway tunnel. Guangzhou new subway line 2 engineering which crosses the existing tunnel is taken as the background. How to achieve intelligent and automatic deformation surveying forecast during the subway tunnel construction process is studied. Because large amount of surveying data exists in the subway construction, deformation analysis is difficult and prediction has low accuracy, a subway intelligent deformation prediction model based on the PBIL and support vector machine is proposed. The PBIL algorithm is used to optimize the exact key parameters combination of support vector machine though probability analysis and thereby the predictive ability of the model deformation is greatly improved. Through applications on the Guangzhou subway across deformation surveying deformation engineering the prediction method's predictive ability has high accuracy and the method has high practicality. It can support effective solution to the implementation of the comprehensive and accurate surveying and early warning under subway operation conditions with the environmental interference and complex deformation.

Construction of sports-educational places using resistant and water-repellent raw materials in concrete

  • Wenbo Xu;Zhiqiang Zhu
    • Structural Engineering and Mechanics
    • /
    • 제86권1호
    • /
    • pp.109-118
    • /
    • 2023
  • Any place where exercise is common, such as a club, sports hall, or school, is considered a place for teaching sports. When doing sports, a very safe environment for sports should be chosen. The athlete should consider the safety of sports facilities and equipment, and if there is a defect, he should refrain from exercising in these places. The safety of sports facilities is very effective in creating people's sports activities, with the benefits of staying away from physical harm, enjoying sports, and having mental peace. Everyone has the right to participate in sports and recreation and to ensure that they enjoy a safe environment. The ability to manage and solve issues that may arise plays the most critical role in creating a safe environment. The quality of construction materials used for the construction of sports facilities is of great importance. In this work, the resistance and water repellency of concrete constituents for the construction of sports buildings have been investigated by nanoscience. Nano-concrete material solves the main problem of concrete surfaces, i.e., the entry of water and humidity into the structure. It also gives it a self-cleaning ability with its water repellency. Nanoparticles are placed between pores and cover the cracks, which causes roughness in the surface structure of concrete. The high roughness of the surface of the coated concrete caused its super-hydrophobicity. In hydrophobic surfaces, the higher the contact angle, the more hydrophobic the surface will be. In order to investigate the hydrophobic properties, silica nanoparticles, silica nanoparticles, and fly ash were prepared on concrete, and their properties were analyzed.

건설기술진흥법 안전관리계획서의 실행방안에 관한 연구 (A Study on the Implementation of the Safety Management Plan in the Construction Technology Promotion Act)

  • 신성수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 추계 학술논문 발표대회
    • /
    • pp.104-105
    • /
    • 2018
  • The purpose of the safety management plan under the Construction Technology Promotion Act is to improve the quality and safety of construction engineers during construction work. To prevent a collapse accident of a facility after completion by preventing a collapse accident of gravel, an earthwork, a river structure or the like. In order to prevent collapses, the purpose of the project is to study measures to improve the ability of construction technology promotion law to ensure the quality of construction materials at the time of construction work.

  • PDF