The 8th International Conference on Construction Engineering and Project Management
/
pp.41-49
/
2020
Concurrent construction offers considerable improvement for shorten the project duration of its production process. Therefore, standardized concurrent construction is widely applied in building construction projects. However, resources planning for standardized concurrent construction project is manually developed by construction manager. This practice is not effective since it is time-consuming and error-prone for managers to identify all project-specific information, distinguish different activity-resource types, interpret these types and analyze how they affect resource allocated on an ad hoc basis. Therefore, this research investigates the opportunity for leveraging activity modeling to enable automated resource planning for standardized concurrent construction during project development, with identifying the characteristics of construction activities under standardized concurrent planning and determining the activity-resources types that affects resource planning. Both will function as a basis for modeling these construction activities in a computer-interpretable manner and for automation in resource planning.
The 3th International Conference on Construction Engineering and Project Management
/
pp.440-448
/
2009
Concurrent construction (or overlapping) is an alternative project delivery process to reduce time-tomarket such that the owner can get higher profits; the increased profits due to shortened project duration would exceed the loss of profits from the increased cost, if any. For more effective concurrent construction, a new conceptual framework for concurrent construction planning is suggested. With multiple work methods available in each activity, the performance of overlapping between two activities in terms of cost is affected by the compatibility between work methods selected and the benefit to the project owner is determined by internal rate of return (RoR). The impact of the compatibility between work methods and the conceptual framework are explained by a hypothetical case study.
Traditional External Insulation Finishing System(EIFS) is applied to apartment construction by performing structural framework and insulation finishing work sequentially. Separate execution of the three works increases construction cost and duration. Concurrent construction method of EIFS, which performs framework and insulation finishing work simultaneously, is introduced in order to solve these problems. However, the introduced method is exposed to the risk of construction delay caused by bottlenecks due to interacting processes and resources. Therefore, this paper presents a simulation model suitable for estimating work productivity of the concurrent construction by considering predecessor and successor processes to optimize resource allocation and minimize construction delay.
The 2th International Conference on Construction Engineering and Project Management
/
pp.520-529
/
2007
Apportioning responsibilities of concurrent delay to the owner and the contractor is a difficult task, due to the sophisticate nature both in the schedule and in the factors that cause the delay. This research attempts to develop a simplified yet systematic approach that can be used for a fair apportionment of concurrent delay. A concurrent delay is defined herein as when the contractor and the owner have both caused independent critical path delays during the same approximate time period. Incorporating the concepts of windows analysis and critical path method (CPM), the developed approach has three "windowing of delay" steps to quickly apportion the delay in each of these windows, and a fourth step to sum up those apportioned delays to obtain each party's final responsibilities. This developed approach is found to be simple and effective at this stage; it will be tested against real cases in the near future.
The 3th International Conference on Construction Engineering and Project Management
/
pp.1540-1547
/
2009
Steel frame factories were surveyed in this study in order to explore the possibility of shortening the construction time and save on construction cost through overlapping at the stages of design or construction. In the survey, construction professionals were interviewed in order to collect quantitative data. Hypotheses were then formulated, and the data was thereby analyzed using the simulation technique in order to analyze the effects of the concurrent engineering method on shorter construction time and cost saving. In addition, actual cases were analyzed to determine the overlapping rates of major processes in terms of shorter construction time and cost saving and to analyze the relationship between time and cost due to overlapping.
건설 산업 대부분의 프로젝트에서 공기지연의 발생은 매우 일반적이나 CPM, Bar Chart와 같은 지연분석 기법들로서는 분석하기 매우 어렵다. CPM과 Bar chart를 이용하는 분석기법들은 동시발생과 생산성 손실 지연을 분석하기에 불충분하기 때문이다. 생산성 손실 지연은 동시발생 지연 분석 및 지연 일수 산정에서 중단으로 인한 지연과 다르게 분석되어야 한다. 본 논문에서는 동시발생 공기지연 분석을 포함하여 생산성을 고려한 공기지연 분석방법에 대하여 논하였다.
건설프로젝트가 대형화, 복합화, 그리고 장기화됨에 따라, 혁신적인 신공법의 개발과 건설 프로세스의 첨단화에 대한 건설 시장의 요구도 지속적으로 증가하고 있다. 이에 건설 분야에서는, 빠른 상품 개발과 품질향상을 위하여 산업분야에서 널리 쓰였던 동시공학의 건설프로젝트 적용을 고려하게 되었다. 하지만 동시공학의 개념들은 선진화된 관리시스템의 부재 및 개념의 학술적 정립 미비로 인하여, 실제 건설 현장에 충분히 활용되지 못하였다. 이에 본 연구는 대표적인 장기, 대형 프로젝트인 교량공사를 대상으로 성공적인 동시공학 적용을 위한 체크리스트를 도출하였다. 국내 건설 분야에 동시공학 실제 적용 사례와 문헌고찰을 통해 일차적으로 동시공학의 건설 산업적용을 위한 체크리스트를 도출한 뒤, 교량전문가 인터뷰를 바탕으로 이전 단계에 도출된 체크리스트를 교량공사의 특성에 맞게 수정하고 발전시켜 교량공사에 성공적인 동시공학 적용을 위한 체크리스트를 확정하였다. 또한 188 명의 관련 업무 수행자들의 설문조사를 바탕으로 체크리스트의 유용성을 검증하고 중요도 실행도 분석으로 우선적인 관리가 요구되는 필수요소를 확인하였다. 본 연구를 통하여 도출된 체크리스트는 교량건설 프로젝트의 진행에 있어 체계적인 사전검토와 건설 단계별 프로세스의 종합적 분석을 가능케 하여, 동시공학의 실무 활용성을 증대시킨다는 점에서 그 의의가 높다고 판단된다.
공동주택의 에너지 의무 절감률이 현재 40%에서 2017년에는 60%까지 단계적으로 상향 조정되면서 에너지 절감을 위해 외단열 공법이 주목받고 있다. 그러나 기존 외단열 공법은 내단열 공법에 비해 추가되는 공사비와 공사기간으로 인해 활성화가 미흡한 실정이다. 따라서 본 연구는 외단열공사와 골조공사를 연속적으로 시공함으로서 공사기간을 단축하고 공사비를 절감할 수 있는 외단열 적층시공 공법의 개념모델을 개발하고 사례적용을 통해 공법의 타당성을 검증하였다. 연구결과 외단열 적층시공 공법은 기존의 외단열 공법에 비해 6.7%의 공기절감 효과와 13%의 외단열 공사비 절감효과가 있는 것으로 나타났다. 본 연구의 결과인 적층시공 공법은 외단열 공법적용의 저해요소를 해결하여 향후 외단열 공법 활성화에 기여할 것으로 기대된다.
Various methods that crash the project completion time have been studied. Line-of-Balance (LOB) is well accepted as a useful method that enables steady resource utilization without frequent hire-and-fire of resources for a project having repetitive units. Existing studies involved in LOB-CPM focuses on thesis such as resource leveling and optimization in construction scheduling community. However, crashing methods are not arrived at a full maturity in LOB scheduling, because no one handles steady resource utilization while keeping activity-relationships. This paper proposes a method that crashes project completion time by hybridizing concurrent engineering and LOB scheduling without using additional resources.
Nowadays major shipbuilding companies are trying to expand their business not only to shipbuilding but to offshore projects as well. DSME is one of them. DSME is trying to set up a flexible design and construction environment for shipbuilding and offshore construction in a single shipyard. The shipbuilding and offshore projects, however, have their unique technology but they need to be designed and constructed in one site. To support this new requirement, DSME has developed an integrated CAD system for ship and offshore projects. In this integrated design environment, the designers can design commercial ships and offshore projects in a flexible manner. Concurrent design is very important for ship and offshore design. As compared to the complexity of the product, the design period is quite short. In effect, the design system for the ship and offshore project has to support concurrent design. One essential point of concurrent design environment is a product model based design system. DSME has developed and implemented the 3D product model concurrent design environment based on Tribon M3. Tribon is a widely used CAD system in shipbuilding area that is developed by Tribon Solutions. DSME has both customized the Tribon system and developed in-house application systems to support its own design and production procedures. All the design objects are modeled in one common database to support concurrent design and accurate production. The major in-house development focused on the modeling automation and automatic drawing generation. During the drawing generation process many of the additional production information are also extracted from the 3D product model. In addition, several applications and functionalities have been developed to apply the shipbuilding based Tribon M3 system to offshore projects. The development of shape nesting, tubular connection, isometric drawing, grating nesting systems are the typical.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.