Challenges and suggestions of resource planning for standardized concurrent construction

  • Chen, Xingbin;Li, Sining;Kim, Jung In;Fang, Yuan
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.41-49
    • /
    • 2020
  • Concurrent construction offers considerable improvement for shorten the project duration of its production process. Therefore, standardized concurrent construction is widely applied in building construction projects. However, resources planning for standardized concurrent construction project is manually developed by construction manager. This practice is not effective since it is time-consuming and error-prone for managers to identify all project-specific information, distinguish different activity-resource types, interpret these types and analyze how they affect resource allocated on an ad hoc basis. Therefore, this research investigates the opportunity for leveraging activity modeling to enable automated resource planning for standardized concurrent construction during project development, with identifying the characteristics of construction activities under standardized concurrent planning and determining the activity-resources types that affects resource planning. Both will function as a basis for modeling these construction activities in a computer-interpretable manner and for automation in resource planning.

  • PDF

A CONCEPTUAL FRAMEWORK FOR CONCURRENT CONSTRUCTION PLANNING

  • Euysup Shim;Kenneth Reinschmidt
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.440-448
    • /
    • 2009
  • Concurrent construction (or overlapping) is an alternative project delivery process to reduce time-tomarket such that the owner can get higher profits; the increased profits due to shortened project duration would exceed the loss of profits from the increased cost, if any. For more effective concurrent construction, a new conceptual framework for concurrent construction planning is suggested. With multiple work methods available in each activity, the performance of overlapping between two activities in terms of cost is affected by the compatibility between work methods selected and the benefit to the project owner is determined by internal rate of return (RoR). The impact of the compatibility between work methods and the conceptual framework are explained by a hypothetical case study.

  • PDF

공동주택용 외단열 적층시공 공법의 생산성 분석을 위한 시뮬레이션 모델 개발 (Simulation Modeling for Productivity Analysis of Concurrent Construction Method of External Insulation Finishing System in Apartment)

  • 김민주;김태훈;임현수;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.68-69
    • /
    • 2015
  • Traditional External Insulation Finishing System(EIFS) is applied to apartment construction by performing structural framework and insulation finishing work sequentially. Separate execution of the three works increases construction cost and duration. Concurrent construction method of EIFS, which performs framework and insulation finishing work simultaneously, is introduced in order to solve these problems. However, the introduced method is exposed to the risk of construction delay caused by bottlenecks due to interacting processes and resources. Therefore, this paper presents a simulation model suitable for estimating work productivity of the concurrent construction by considering predecessor and successor processes to optimize resource allocation and minimize construction delay.

  • PDF

A SYSTMATIC APPROACH FOR APPORTIONING CONCURRENT DELAY

  • Nie-Jia Yau;Chia-Chi Chang
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.520-529
    • /
    • 2007
  • Apportioning responsibilities of concurrent delay to the owner and the contractor is a difficult task, due to the sophisticate nature both in the schedule and in the factors that cause the delay. This research attempts to develop a simplified yet systematic approach that can be used for a fair apportionment of concurrent delay. A concurrent delay is defined herein as when the contractor and the owner have both caused independent critical path delays during the same approximate time period. Incorporating the concepts of windows analysis and critical path method (CPM), the developed approach has three "windowing of delay" steps to quickly apportion the delay in each of these windows, and a fourth step to sum up those apportioned delays to obtain each party's final responsibilities. This developed approach is found to be simple and effective at this stage; it will be tested against real cases in the near future.

  • PDF

A DECISION MAKING FRAMEWORK FOR REDUCING PROJECT DURATION BY APPLYING CONCURRENT ENGINEERING IN CONSTRUCTION

  • Han, Jin-Taek;Choi, Do-Seung;Lee, Jae-Seob
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1540-1547
    • /
    • 2009
  • Steel frame factories were surveyed in this study in order to explore the possibility of shortening the construction time and save on construction cost through overlapping at the stages of design or construction. In the survey, construction professionals were interviewed in order to collect quantitative data. Hypotheses were then formulated, and the data was thereby analyzed using the simulation technique in order to analyze the effects of the concurrent engineering method on shorter construction time and cost saving. In addition, actual cases were analyzed to determine the overlapping rates of major processes in terms of shorter construction time and cost saving and to analyze the relationship between time and cost due to overlapping.

  • PDF

생산성을 고려한 공기지연 분석방법 (Delay Analysis Method Considering Productivity)

  • 구자민;이재섭
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.438-441
    • /
    • 2003
  • 건설 산업 대부분의 프로젝트에서 공기지연의 발생은 매우 일반적이나 CPM, Bar Chart와 같은 지연분석 기법들로서는 분석하기 매우 어렵다. CPM과 Bar chart를 이용하는 분석기법들은 동시발생과 생산성 손실 지연을 분석하기에 불충분하기 때문이다. 생산성 손실 지연은 동시발생 지연 분석 및 지연 일수 산정에서 중단으로 인한 지연과 다르게 분석되어야 한다. 본 논문에서는 동시발생 공기지연 분석을 포함하여 생산성을 고려한 공기지연 분석방법에 대하여 논하였다.

  • PDF

교랑 공사에 동시공학 적용을 위한 체크리스트 도출 (Checklist for the application of concurrent engineering in bridge construction)

  • 박세만;박태일;김형관
    • 한국건설관리학회논문집
    • /
    • 제14권1호
    • /
    • pp.3-11
    • /
    • 2013
  • 건설프로젝트가 대형화, 복합화, 그리고 장기화됨에 따라, 혁신적인 신공법의 개발과 건설 프로세스의 첨단화에 대한 건설 시장의 요구도 지속적으로 증가하고 있다. 이에 건설 분야에서는, 빠른 상품 개발과 품질향상을 위하여 산업분야에서 널리 쓰였던 동시공학의 건설프로젝트 적용을 고려하게 되었다. 하지만 동시공학의 개념들은 선진화된 관리시스템의 부재 및 개념의 학술적 정립 미비로 인하여, 실제 건설 현장에 충분히 활용되지 못하였다. 이에 본 연구는 대표적인 장기, 대형 프로젝트인 교량공사를 대상으로 성공적인 동시공학 적용을 위한 체크리스트를 도출하였다. 국내 건설 분야에 동시공학 실제 적용 사례와 문헌고찰을 통해 일차적으로 동시공학의 건설 산업적용을 위한 체크리스트를 도출한 뒤, 교량전문가 인터뷰를 바탕으로 이전 단계에 도출된 체크리스트를 교량공사의 특성에 맞게 수정하고 발전시켜 교량공사에 성공적인 동시공학 적용을 위한 체크리스트를 확정하였다. 또한 188 명의 관련 업무 수행자들의 설문조사를 바탕으로 체크리스트의 유용성을 검증하고 중요도 실행도 분석으로 우선적인 관리가 요구되는 필수요소를 확인하였다. 본 연구를 통하여 도출된 체크리스트는 교량건설 프로젝트의 진행에 있어 체계적인 사전검토와 건설 단계별 프로세스의 종합적 분석을 가능케 하여, 동시공학의 실무 활용성을 증대시킨다는 점에서 그 의의가 높다고 판단된다.

공동주택용 외단열 적층시공 공법 개념모델 개발 (The Conceptual Framework of Concurrent Construction Method for EIFS in Apartment)

  • 임현수;김태훈;조훈희;강경인
    • 한국건축시공학회지
    • /
    • 제15권4호
    • /
    • pp.413-423
    • /
    • 2015
  • 공동주택의 에너지 의무 절감률이 현재 40%에서 2017년에는 60%까지 단계적으로 상향 조정되면서 에너지 절감을 위해 외단열 공법이 주목받고 있다. 그러나 기존 외단열 공법은 내단열 공법에 비해 추가되는 공사비와 공사기간으로 인해 활성화가 미흡한 실정이다. 따라서 본 연구는 외단열공사와 골조공사를 연속적으로 시공함으로서 공사기간을 단축하고 공사비를 절감할 수 있는 외단열 적층시공 공법의 개념모델을 개발하고 사례적용을 통해 공법의 타당성을 검증하였다. 연구결과 외단열 적층시공 공법은 기존의 외단열 공법에 비해 6.7%의 공기절감 효과와 13%의 외단열 공사비 절감효과가 있는 것으로 나타났다. 본 연구의 결과인 적층시공 공법은 외단열 공법적용의 저해요소를 해결하여 향후 외단열 공법 활성화에 기여할 것으로 기대된다.

동시공학 및 LOB를 사용한 반복 프로젝트 공기단축 방법론 (Crashing Method for Repetitive Project hybridizing concurrent engineering and LOB)

  • 민규태;이홍철;리현군;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.41-42
    • /
    • 2018
  • Various methods that crash the project completion time have been studied. Line-of-Balance (LOB) is well accepted as a useful method that enables steady resource utilization without frequent hire-and-fire of resources for a project having repetitive units. Existing studies involved in LOB-CPM focuses on thesis such as resource leveling and optimization in construction scheduling community. However, crashing methods are not arrived at a full maturity in LOB scheduling, because no one handles steady resource utilization while keeping activity-relationships. This paper proposes a method that crashes project completion time by hybridizing concurrent engineering and LOB scheduling without using additional resources.

  • PDF

Integrated CAD System for Ship and Offshore Projects

  • Suh, Heung-Won;Lee, Sung-Geun
    • International Journal of CAD/CAM
    • /
    • 제6권1호
    • /
    • pp.41-48
    • /
    • 2006
  • Nowadays major shipbuilding companies are trying to expand their business not only to shipbuilding but to offshore projects as well. DSME is one of them. DSME is trying to set up a flexible design and construction environment for shipbuilding and offshore construction in a single shipyard. The shipbuilding and offshore projects, however, have their unique technology but they need to be designed and constructed in one site. To support this new requirement, DSME has developed an integrated CAD system for ship and offshore projects. In this integrated design environment, the designers can design commercial ships and offshore projects in a flexible manner. Concurrent design is very important for ship and offshore design. As compared to the complexity of the product, the design period is quite short. In effect, the design system for the ship and offshore project has to support concurrent design. One essential point of concurrent design environment is a product model based design system. DSME has developed and implemented the 3D product model concurrent design environment based on Tribon M3. Tribon is a widely used CAD system in shipbuilding area that is developed by Tribon Solutions. DSME has both customized the Tribon system and developed in-house application systems to support its own design and production procedures. All the design objects are modeled in one common database to support concurrent design and accurate production. The major in-house development focused on the modeling automation and automatic drawing generation. During the drawing generation process many of the additional production information are also extracted from the 3D product model. In addition, several applications and functionalities have been developed to apply the shipbuilding based Tribon M3 system to offshore projects. The development of shape nesting, tubular connection, isometric drawing, grating nesting systems are the typical.