• Title/Summary/Keyword: completion inspection

Search Result 56, Processing Time 0.02 seconds

A Study on Issues and Improvements Plan for National Safety Assessment (국가안전대진단의 문제점과 개선방안)

  • Shin, Jae-Hun;Kim, Sang-Woon
    • Journal of the Society of Disaster Information
    • /
    • v.14 no.3
    • /
    • pp.334-342
    • /
    • 2018
  • Purpose: The purpose of this study is to examine and improve the issues related to National Safety Inspection currently operation and reform the system for response to various disasters. Method: For the completion, this study established theoretical background using materials related to National Safety Inspection and identified the issues using the open statistical data for National Safety Inspection to suggest the improvement plans. Results: National Safety Inspection has been operating a complete large-scale inspection on risk factors in cooperation with the central government, local governments, and citizens since 2015 to remove various disaster factors neglected in people's daily lives. Operation of National Safety Inspection had positive influence in preventing major disasters. However, inefficient activity is pointed out due to issues related to cooperation with other institutes, limitation for citizen's positional role, and superficial inspection. Conclution: To solve this issue, this study proposed strengthening of communication activity with disaster institutes, strengthening of efficiency through citizen participation by type, and actualization of checklist used in National Safety Inspection.

The Effect of a Periodic Visiting Education Program on Food Safety Knowledge of Cooks in Children's Foodservice Facilities (위생순회방문지도를 통한 어린이 급식소 조리원 대상 위생 지식의 변화 평가)

  • Kim, Jinah;Lee, Youngmee
    • Journal of the Korean Dietetic Association
    • /
    • v.20 no.1
    • /
    • pp.36-49
    • /
    • 2014
  • This study evaluated the effectiveness of a visiting inspection and knowledge-based food safety education program for cooks in child care facilities provided by the Center for Children's Foodservice Management (CCFSM). The research was conducted among cooks at 91 child care facilities; 56 existing facilities had been enrolled since 2011 and provided with the inspection and education program for 2 years and 35 new facilities were enrolled in 2012 and provided with the program for 1 year. The food safety knowledge of the cooks of the two groups were compared by the presence and duration of inspection and education programs provided by the CCFSM. The total mean score for food safety knowledge was $18.48{\pm}3.09$, with a group score of $19.34{\pm}2.68$ for the existing facilities and $17.11{\pm}3.25$ for the new facilities (P<0.001). There was no significant difference between groups in the knowledge of the personal sanitation. According to a post-test for food safety knowledge in the two groups after the completion of a one-year program on food safety by CCFSM, the mean score of food safety knowledge increased by 2.92 to 20.03 for cooks of the new facilities and both groups had significantly higher mean scores than pre-test (P<0.001). There was no significant difference in the mean score of each group by post-test. Thus, the one-year continuous program by CCFSM was effective in improving food safety knowledge of the cooks of the child care facilities.

Analyses of Structural Performances for Reinforced Concrete Middle-Rise Residential Building under Construction (중층 규모 철근콘크리트 주거형 건물의 시공 중 구조성능 분석)

  • Ko, Jun-Young;Kim, Jae-Yo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.5
    • /
    • pp.96-103
    • /
    • 2019
  • Middle-rise reinforced concrete residential buildings account for a large portion of the Korea, and structural performance analysis are needed for problems that could occur during the construction of such buildings. Thus, a middle-rise reinforced concrete residential building with 25 stories are selected as a sample model for structural performance analysis. The structural analyses are performed by dividing a sample model into the construction stage models of the 5th, 10th, 15th, 20th and 25th floors and the completion stage models with the design completed. For the comparisons of structural performances, Eigenvalue analysis results and lateral-load-resisting capabilities and structural design performances of structural members are analyzed. As a result of analyses, it was confirmed that both the construction and completion stage do not exceed KBC criteria limits at the lateral displacement and story drift ratio, and structural design performances of structural members confirm structural safety in all components except for some members of the wall. Therefore, it was concluded that if structural stability is obtained during the completion stage of a middle-rise reinforced concrete residential building, structural stability is secured under construction.

A Study on the Method of Feasibility Study for Remodeling Apartment House (공동주택 리모델링 사업성 평가방법에 관한 연구)

  • Yoo, In-Geun;Kim, Chun-Hag;Yoon, Yer-Wan;Yang, Keek-Young
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.9 no.2
    • /
    • pp.163-172
    • /
    • 2005
  • This study aims to evaluate the feasibility of remodeling business by predicting the future price of apartment house after remodeling using Hedonic Price Model. The data concerning such 9 independent variables as location, unit size, unit plan, landscape, parking, the number of elapsed years after completion, number of units, mechanical performance, interior from 25 regions in Seoul metropolitan city were collected and evaluated by established evaluation criteria. The coefficients affecting the price of apartment unit were made by way of linear multi-regression and put into Hedonic Price Model. The feasibility evaluation model for apartment was made and verified by data of remodelled apartment. The predicted results using suggested evaluation model coincide with actual apartment market situations.

Health Monitoring of High-rise Building with Fiber Optic Sensor (SOFO)

  • Mikami, Takao;Nishizawa, Takao
    • International Journal of High-Rise Buildings
    • /
    • v.4 no.1
    • /
    • pp.27-37
    • /
    • 2015
  • Structural health monitoring is becoming more and more important in the domain of civil engineering as a proper mean to increase and maintain the safety, especially in the land of earthquakes like Japan. In many civil structures, the deformations are the most relevant parameter to be monitored. In this context, a monitoring technology based on the use of long-gage fiber optic deformation sensor, SOFO is being applied to a 33-floors tall building in Tokyo. Sensors were installed on the $2^{nd}$ floor's steel columns of the building on May 2005 in the early stage of the construction. The installed SOFO sensors were dynamic compatible ones which enable both static and dynamic measurements. The monitoring is to be performed during the whole lifespan of the building. During the construction, static deformations of the columns had been measured on a regular basis using a reading unit for static measurement and dynamic deformation measurements were occasionally conducted using a reading unit for dynamic measurement. The building was completed on August 2006. After the completion, static and dynamic deformation measurements have been continuing. This paper describes a health monitoring technology, SOFO system which is applicable to high-rise buildings and monitoring results of a 33-floors tall building in Tokyo from May 2005 to October 2010.

A Case Study on the Failure of Intake and Exhaust Valves for Marine Diesel Engines

  • Kim Jong-Ho
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.29 no.7
    • /
    • pp.801-807
    • /
    • 2005
  • Any failure of intake and exhaust valves of marine diesel engine must be regarded as serious, and any steps which can be taken to prevent such failure are desirable. The purposes of this study is to investigate and to analyse the failure causes of intake and exhaust valves for marine diesel engine during sea trial after completion of overhauling. In this study, to analyse the failure causes, we have carried out on board inspection, fractography test and discussion based on the specimen and repairing report provided by the ship owner. From the results of above inspection, test and discussion, it has been considered reasonable to conclude that the causes of damaged valves of the ship are as follow ; 1) During operation, the stick or seizure of valve spindle occurred and hence the movement of exhaust valve spindle was to be resisted and subsequently the engine was to be operated under an unappropriated valve timing and the exhaust valve sustained the repeated loads exceeding the fatigue strength of valve material. 2) By the loads above described, the fatigue fracture was initiated at the structural noncontinuous part of exhaust valve spindle, and then the valve head was finally fractured and dropped in the cylinder. 3) The fractured exhaust valve head impacted the intake valve at various direction to be bent or damaged.

A Study on Revise the Rule of Safety Controllers of Hazardous Substances (위험물 안전관리 제도의 개선에 관한 연구)

  • Park, Kyong-Jin;Shin, Soo-Kyung;Lee, Bong-Woo
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.3
    • /
    • pp.473-480
    • /
    • 2020
  • In this study, I analyzed problems of safety management system of hazardous substances and proposed improvement measures. By statistics of Korea National Fire Agency it shows that hazardous substances of not less than a designated quantity were 2,180 factorys, 24,732 handling places and 85,218 storing places in 2018. also It has been conformed that Fire accidents break out year after year in factory, etc. so In this study, I analyzed the safety controllers of hazardous substances of the present law and fire statistics. therefore I has been found out the problems that the first, safety controllers' status. the second, There is no laws related design, installation, installation supervision. the third, fire safety inspection. This study will be used a basic data for preventing of extensive hazazardous substances-related accident that is very difficult handling.

Improvement Method of Hazardous Materials Facilities Installation License of Manufacturer (위험물시설의 설치허가제도의 개선방안)

  • 이종영;이수경;김태환
    • Fire Science and Engineering
    • /
    • v.15 no.3
    • /
    • pp.21-35
    • /
    • 2001
  • By rearing private experts to design hazardous facilities, Safety property is obstained. So it is necessary to limit within the designer of hazardous materials facilities who has some degree skill. After permission progress about the inspection of the design ascertain whether it is safety property Mayor/Do governor permits within the laws and their qualification. Accordingly, Korea Fire Equipment Inspection Corporation be come specialization about the design, inspection of construction completion. A inquire purpose of Fire Service Act be considered fitness. Subject by which the Korea Fire Equipment Inspection Corporation is entrusted, subject by which the a non-probit corporation in The Civil Law be possible to entrusted in separate. In this case, because of the level of one's technique and facilities are important, to limit as a nonprobit corporation in The Civil Law give rise to trouble. Consequently; established a business corporation, which the level of one's technique and facilities, in accordance with The Commercial Law can assign inspection of construction completion. The contents of the Fire Services Act is caused by the historic growth of hazardous facilities's safety management. Because we decide on a course about completed inspection of hazardous substance, it is needed that adjust the task performed by a corporation of the exert skill and the duty performed by the task that a authorized corporation on the civil law or the commercial law To adjust the duty, the Fire Service Act, that is suitable to the purpose and principle, should constitute a measure of the duty. With the object of insure the safety of the hazardous substance, when the fire survice act establish a corporation of the expert skill. There is the will of lawmakers that need organization to have the power of the professional technology. The state excise the will that insure the safety of hazardous materials facilities on the basis of the professional technology and facilities, and construct to establish a corporation of the expert skill. Therefore as concentrate on the technology to need to insure the safety of the facilities of hazardous substance to be suitable on the purpose of laws and take responsibility and reports to a corporation of the expert skill. The task to be given to the state will be done.

  • PDF

A Study on Improvement Measures for the Design Documents Delivery System in Public Road Construction Projects (공공 도로건설사업에서의 설계도서 납품체계 개선방안에 관한 연구)

  • Ok, Hyun;Kim, Seong-Jin;Kim, Tae-Hak;Ju, Ki-Bum
    • International Journal of Highway Engineering
    • /
    • v.20 no.2
    • /
    • pp.45-55
    • /
    • 2018
  • PURPOSES : This study aims to survey and analyze the status of the design and completion documents output delivery system in public construction projects in order to assess the problems of the Ministry of Land, Infrastructure and Transport (MOLIT)'s electronic delivery system, with a focus on roads and rivers, and to offer improvement measures. METHODS : This study first surveys and analyzes laws and existing study trends with regard to the design and completion documents output delivery system in public construction projects. It further analyzes the status of the output delivery system in public construction projects, including roads, rivers, expressways, water resources, and railroads. In addition, a comparative analysis of the current electronic delivery system of MOLIT and Korea Expressway Corporation in the road field is conducted, and the problems and improvement measures for MOLIT's electronic output delivery system are presented. This study seeks to analyze problems and prepare improvement measures with regard to road and river public construction projects, as ordered by MOLIT's five regional offices. RESULTS : This study sought to prepare the electronic output delivery system with regard to public construction projects and present the analysis of its major problems and improvement measures in four categories: "the preparation of electronic design documents output delivery system improvement measures including inspection and delivery," "preparation of guidelines, systems, etc., concerning electronic design documents," "preparation of improvement measures for the construction project management system and electronic design document support tools", and "linking of MOLIT's electronic output delivery system with relevant agencies and the expansion thereof to local governments." CONCLUSIONS : This study analyzed the current status and problems of the MOLIT's electronic output delivery system in the field of road and river construction projects, and presented corresponding improvement measures. This study is expected to address the problems of the MOLIT's electronic output delivery system, and to provide the foundation for the preparation of an efficient electronic output delivery system for design and completion documents. In addition, this study is expected to boost the quality and utilization of the electronic design documents output, and to exchange, share, and link construction information among relevant agencies so as to prepare the foundation for sharing construction information.

A Study of the Proper Control-Interval through Comparative Analysis on Bridge Maintenance System (교량 적정 점검 주기에 관한 비교 연구)

  • Lee Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.113-118
    • /
    • 2001
  • Bridge Control and Inspection ensures the safety, utility, and durability of Bridge in use. This Paper compares Control-interval of Germany with that of Korea, which was described in the special law recently revised concerning the Safety Checkup of Facilities, and analyzes Period of Damage Discovery that the Damage report of other countries showed. According to a result of the analysis, damage requiring structure repair and reinforcement more frequently been discovered even in less than a decade after the completion of construction. The paper, therefore, suggested the reregulation on the Korean Control Interval on the basis of the result.

  • PDF