• 제목/요약/키워드: coffer dam

검색결과 10건 처리시간 0.025초

FINITE ELEMENT MODELING FOR HYDRODYNAMIC AND SEDIMENT TRANSPORT ANALYSIS (II) : SEDIMENT TRANSPORT STUDY

  • Noh, Joon-Woon
    • Water Engineering Research
    • /
    • 제4권2호
    • /
    • pp.99-109
    • /
    • 2003
  • Since bed elevation changes are mainly dependent on the flow velocity and corresponding shear stress, it is possible to predict bed elevation numerically using velocity components. For the scour analysis due to channel contraction, a bed load transport model is developed and applied to estimate scour depth around coffer dam in the Mississippi River. During Phase I of the Lock & Dam No. 26 replacement project, a coffer dam was constructed to reduce the flow area approximately by 50%. Flow velocity increases due to the flow area reduction yields significant lowering (erosion) of the channel bed elevation. The proposed numerical model solves the sediment continuity equation using the finite element method to evaluate scour process in the vicinity of the coffer dam

  • PDF

P.R.D. 공법을 활용한 가물막이 설계 (The design of coffer dam utilized P.R.D. method)

  • 박철숙;이규탁;염경택;김윤구;강봉권;이재원;임석산;정지열
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.869-887
    • /
    • 2008
  • Coffer dam for tunnel type spillway in inflow section of Dae-am dam was originally planned as 2 lines sheet piles with Water Zet method. But, the result of pilot test was caused of some problems that vibration during installation of pile could pollute water and water leakage could the lower part. So, sheet piles was not satisfactory for faculty of coffer dam. Structural instability of sheet pile system need to reinforcement. Characteristic of Dae-am dam was small reservoir capacity but wide drainage area, of which it was judgment that security of leakage and stability was difficult during excavation of inlet part. So, we consider that water curtain method utilized with in site pouring concrete pile method was designed at weir part of spillway. We were known about basement rock that geological boring was carried out in weir part. After taking a deep consideration, PRD method was accepted as a new method. Concrete pile by PRD was installed to below country rock. CJM method was carried out with PRD. After making concrete wall using Top-down method, earth anchors were installed for supporting it. According to the result of numerical analysis, as water level rises, wall is stable.

  • PDF

댐 건설 기간 수위변화가 하반림 일대 습지 식생에 미치는 영향 -한탄강댐을 사례로- (Effects of Water Level Change on Wetland Vegetation in the Area of Riparian Forest for Dam Construction Period -Focused on the Hantan River Dam-)

  • 박현철;이정환;이관규
    • Journal of Forest and Environmental Science
    • /
    • 제30권1호
    • /
    • pp.76-84
    • /
    • 2014
  • This study was performed to monitor the effects of water level change on changes of landscape, vegetation community, and species diversity of riparian forest. Hantan river dam, study area, has been constructed in the area of Chansoo-myeon, Pocheon-si and Yeoncheon-eup, Yeoncheon-gun, Gyeonggi-do, which is a dam for flood control only in flooding season. Landscape changes were notable after the construction of coffer dam, and the changes were caused by water level increase in areas of riparian forests which consisted of mainly withered willow as a dominant species in the flooding season. It changed vegetation communities of riparian forest from Phragmites japonica and Salix koreensis to Phragmites japonica. Species diversity index was lowest in 2010 when the coffer dam was constructed and showed an increasing trend later. Thus, this study is well in agreement with a previous report that plants of the genus Salix wither by muddy water during flooding and also suggests, controlling water level of river and prediction of water level change's effects should be considered when any facilities are planned.

해안매립지반에서의 토류가시설 시험시공 및 변경사례 (A Field Case on the Pilot Constructions and Changes of a Braced Cut Wall in a Coastal Filled Land)

  • 황영철;김기림;김연정
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2006년도 추계 학술발표회
    • /
    • pp.46-55
    • /
    • 2006
  • There are many kinds of braced cut wall methods as the sheet pile, SCW, CIP and slurry wall which is adoptable for a deep excavation construction in a coastal filled land. The braced cut wall which has a strong stiffness is very stable but it has the weak point that the construction cost is high. Thus when a braced cut wall is designed, the geotechnical engineers choose the braced cut wall which has more safe and economic in the consideration of surrounding buildings near the construction site. Especially, when the sheet pile method as a braced cut wall is cheesed, the layer order and consistence of a coastal deposit stratum are considered and the pile driving method is also considered. This paper introduces the case that the originally box-type sheet pile wall was changed to U-type and high strength material after the pilot test at the subway construction site in a coastal filled land. This paper also introduces the case that the sheet pile's driving method was changed to special method in the section of the temporary coffer dam which had made when the present coastal filled land was formed.

  • PDF

석축 산성의 계곡부 체성과 못(池)에 관한 연구 - 거창 거열성과 함안 성산산성을 중심으로 - (A Study on the Wall and Reservoir at the Valley Part of Stone Fortress - Focused on the Fortress of $Geoyeol-seong$ and $Seongsan-seong$ -)

  • 권순강;이호열;박운정
    • 건축역사연구
    • /
    • 제20권3호
    • /
    • pp.7-22
    • /
    • 2011
  • With the accumulations of outcomes from archaeological excavations of mountain fortress of three kingdoms period, there have been studies about time-periodic territory range of mountain fortress, difference in the way(method) of construction, defence system and so on from various points of view. This is an empirical study on the construction method of the valley part of stone fortress. First of all, it is required to secure large quantity of fresh water for those who lived at mountain fortress. Especially when builders of fortress construct a fortification at the valley part of stone fortress, in advance they must sufficiently consider several options including the establishment of sustainable water resources. First, when it comes to build a fortification on a ridge[or a slope] of a mountain, you have only to consider a vertical stress. However, when it comes to build a fortification at the valley part of a mountain, You must have more sufficient preparations for the constructing process. Because there are not only a vertical stress but also a horizontal pressure simultaneously. Second, a fortification of mountain fortress built by using unit building stone is a structure of masonry construction like brick construction, and the valley part of it is where the construction of the fortification begins. Third, when it comes to build a fortification at the valley part of a mountain, it seems that they use a temporary method such as coffer dam in oder to prevent the collapse of the fortification due to heavy rain. Furthermore, in response to a horizontal pressure a fortification is built by the way of its plane make an arch, or by piling up the soil with the plate method(類似版築) and earthen wall harder method(敷葉) they increase cross-sectional area of the fortification and its cutoff capacity. In front direction they put the reservoir facility for the fear that the hydraulic pressure and earth pressure are directly transmitted to the fortification. The process of constructing the fortification at the valley part of a mountain is done in the same oder as follows; leveling of ground(整地) ${\Rightarrow}$ construction of coffer dam ${\Rightarrow}$ construction of the fortification between the both banks of the valley ${\Rightarrow}$ construction of the fortification at bottom part of spill way(餘水路) between the both banks of the valley ${\Rightarrow}$ construction of spill way(餘水路) & reservoir facility ${\Rightarrow}$ construction of the fortification at upper part of spill way between the both banks of the valley. Coffer dam facility seems to be not only the protection device on occasion of flood but also an important criterion to measure the proper height of spill way or tailrace(放水路). This study has a meaningful significance in that it empirically examines the method of reduction of the horizontal pressure which the fortification at the valley part of a mountain takes, the date the construction was done, and wether the changes in climate such as heavy rainfall influence the process of construction.

강널말뚝을 이용한 국내.외 시공 사례 (A Case study of steel sheet pile)

  • 여병철;김광일
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1994년도 가을 학술발표회 논문집
    • /
    • pp.111-118
    • /
    • 1994
  • The use of steel sheet pile walls as barrier walls have the temporary for coffer dam, retaining wall in excavation, etc., but also permanent of semi-permanent for harbor construction, containment systems, vertical barrier systems for waste disposal (landfill) or subway in excavarion. In all these applicaions the resistance of the structure to seepage plays an important role. Also the stability and longevity of the construction, the possibility of permanent control and survey make the steel sheet pile wall a nearly perfect vertical barrier from a technical and economical point of view.

  • PDF

성덕 다목적댐 가물막이댐의 수화열 해석 (Hydration Heat Analysis of Seongdeok Cofferdam)

  • 김진근;추인엽;장봉석;하재담;박병국;김정수
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2008년도 추계 학술발표회 제20권2호
    • /
    • pp.481-484
    • /
    • 2008
  • 콘크리트 구조물의 온도균열은 타설 초기 시멘트의 수화열에 의한 온도상승 및 강하에 따라 생기는 체적변화가 내부 또는 외부적으로 구속을 받아 발생하는 것으로, 댐과 같은 매스콘크리트 구조물일수록 온도균열 발생가능성은 높아진다. 성덕 다목적댐은 경상북도 청송군에 건설 중인 중력식 다목적 댐으로, 분할 타설고 설정 및 수화열계측을 통한 균열유무 조사 등의 목적으로 가물막이댐 시험시공이 이루어졌다. 본 연구는 성덕 다목적댐 가물막이댐의 수화열 해석을 수행하여 분할 타설고에 따른 수화열 비교, 수화열에 의한 온도균열 발생 유무, 현장 계측 결과 값과의 비교 분석을 하고자 한다.열 비교, 수화열에 의한 온도균열 발생 유무, 현장 계측 결과 값과의 비교 분석을 하고자 한다.

  • PDF

FEM에 의한 필댐의 응력해석(應力解析) (Stress Analysis of Fill Dam by FEM)

  • 강예묵;조성섭;양해진
    • 농업과학연구
    • /
    • 제19권1호
    • /
    • pp.79-90
    • /
    • 1992
  • 화강토가 축조재료(築造材料)인 안동(安東)댐에 대하여 FEM에 의한 침하(沈下) 및 응력(應力)을 고찰(考察)해본 결과 다음과 같은 결론(結論)을 얻었다. 1. 안동다목적(安東多目的)댐의 층별(層別) 수직침하는 FEM에 의한 값과 실측치(實測値)가 잘 일치하며, 최대침하(最大沈下)는 중앙부분(中央部分)인 표고(標高) 130m 부근에서 40cm가 발생(發生)했으며 해석치(解析値)는 42cm를 나타냈다. 2. 중심(中心)부근에서의 침하(沈下)크기도 해석결과(解析結果)와 계측치(計測値)가 대체로 일치하며, 심벽부가 가장 크고 다음으로는 투과부(透過部), 안정부(安定部), 석괴부 순으로 나타났다. 3. 수평방향(水平方向)의 변위(變位)는 상류측(上流側)보다 하류측(下流側)에서 더 크게 나타났으며, 이는 상류(上流) 가물막이와 저수위(貯水位)의 영향(影響)으로 인한 결과(結果)로서 하류측(下流側)은 최대(最大) 21cm, 상류측은 17cm 정도가 일어났다. 4. 안동(安東)댐의 응력(應力)은 강성도(剛性度) 차이에 의해서 역(逆)아아칭작용이 발생했으며 이는 여과부(濾過部)의 강성(剛性)이 심벽부(心壁部)의 강성(剛性)보다 적기 때문이라고 판단된다. 5. Zone별(別) 주응력(主應力)값의 비(比)인 Load Transfer Ratio는 1.06 수준(水準)으로 역 아아칭작용이 발생하고 있음을 나타내고 있다.

  • PDF

낙동강유역 시멘트혼합토의 강도특성 (Strength Characteristics of Cemented Sand of Nak-dong River)

  • 김영수;정우섭;석태용;임안식
    • 한국지반환경공학회 논문집
    • /
    • 제7권4호
    • /
    • pp.43-52
    • /
    • 2006
  • 최근 이상기후 및 집중호우로 인해 낙동강유역의 많은 지역이 재산 및 인명손실을 크게 입고 있다. 이러한 재해 대책의 일환으로 본 연구에서는 일본에서 본댐공사시 가물막이댐으로서 많이 활용하고 있는 CSG공법의 제방축조재료로서 적용성을 평가하기 위해 낙동강 유역의 하상재료인 빈입도의 모래를 시멘트와 혼합한 시멘트혼합토의 강도특성을 파악하고자 한다. 이를 위하여 낙동강유역 2지점의 모래와 시멘트의 혼합율을 2~8%까지 변화시키면서 다짐 및 CBR시험, 일축압축시험 그리고 중형삼축시험을 실시하여 시멘트혼합율과 재령에 따른 압축강도, 탄성계수, 그리고 변형에 따른 응력의 특성등을 검토함으로서 제체재료의 적합성 검토, 설계 및 해석에 필요한 기초자료를 제공하고자 한다.

  • PDF

물막이댐 주변에서의 국부세굴현상 모의 (Numerical Modeling of Local Scour Around a Coffer Dam)

  • 노준우;김우구
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2004년도 학술발표회
    • /
    • pp.419-423
    • /
    • 2004
  • 하상변동은 유속에 의해 얻어지는 전단력에 직접적으로 영향을 받게 된다. 특히 교대나 교각, 그 밖에 수제공 등을 비롯한 수공구조물의 설치에 의하여 흐름단면이 급격히 감소되는 구간에서는 이러한 현상이 매우 활발하게 일어나게 되는데 이는 국부세굴의 직접적인 원인이 되기도 한다. 본 논문에서는 단면축소에 기인한 유속증가에 의해서 발생되는 국부세굴현상을 2차원 유한요소 모델을 사용하여 모의하고 주변의 전반적인 하상변동현상을 규명해 보았다. 먼저 2차원 흐름모형으로부터 유속성분을 구하고 전단력을 구한 다음 소류사 이동공식을 적용한 하상토 보존방정식을 풀이함으로써 국부세굴에 따른 하상의 변동을 수치모델로 예측할 수 있게 된다. 본 논문에서는 유한요소법을 이용, 하상토 보존방정식을 계산한 다음 일정시간동안 모델수행을 통해서 변동이 거의 없을 때까지 하상의 변동사항을 순차적으로 모의하고 예측해 보았다. 적합한 구간을 선정하여 단면축소에 기인한 유속증가로 인한 국부 세굴을 모의하기 위하여 본 모델을 개발, 적용하였다. 미국 미시시피 강에서 Lock & Dam No. 26을 교체하는 제 1단계 작업 중 물막이댐 건설로 인하여 흐름단면이 약 $50\%$ 감소하게 된다. 주로 단면축소 구간을 적용대상으로 선정하여 물막이댐 주변의 하상변동을 모의한 다음 실제 관측치와 비교하여 본 모델의 효용성을 입증하였다. 모형은 기본적으로 유한요소법을 이용해서 하상토 보존 방정식을 풀이한 것으로 van Rijn 소류사 이동공식을 적용하였다. 세굴현상에 기인한 수심증가로 인한 전단력 감소현상도 흐름의 연속조건을 도입하여 모의가능 하게끔 작성하였다.. 상대적으로 적은 것으로 분석되었다. 이번 연구를 통하여 WEP 모형이 유역 물순환 해석에 적절한 모형임을 확인할 수 있었으면, 향후 청계천 유역의 물리적 특성에 대한 매개변수와 인공계 물순환 자료의 보완을 통해 보다 향상된 모의가 가능할 것으로 판단된다. 하였던 Cd과 Mg이 Ca 및 Ca과 vitamin D의 동시(同時) 급여(給與)로 감소(減少)하였고 Cu는 전체적(金體的)으로 변화(變化)가 없었으며 Zn은 Cd 급여(給與)로 감소(減少)하였으나 Ca과 vitamin D의 급여(給與)에 의하여 증가(增加)하였고 Ca은 Ca과 viamin D의 급여(給輿)로 유의(有意)하게 증가(增加)하였다. 신장(腎臟)중의 무기질(無機質) 함량(含量)은 Cd급여(給輿)로 Cu, Mg은 감소(滅少)하였으나 Ca, Zn은 변화(變化)가 없었고 Ca 및 Ca과 Vitamin D의 급여(給與)로 Cd, CU, Zn은 증가(增加)하였다.ce area)는 수술 전100.8$\pm$25.6 mm/$m^{2}$에서 79.3$\pm$ 15.8 mm/$m^{2}$로 감소한 소견을 보였다. 승모판 성형술은 전 승모판엽 탈출증이 있는 두 환아에서 동시에 시행하였다. 수술 후 1년 내 시행한 심초음파에서 모든 환아에서 단지 경등도 이하의 승모판 폐쇄 부전 소견을 보였다. 수술 후 조기 사망은 없었으며, 합병증으로는 유미흉이 한 명에서 있었다. 술 후 10개월째 허혈성 확장성 심근증이 호전되지 않아 Dor 술식을 시행한 후 사망한 예를 제외한 나머지 6명은 특이 증상 없이 정상 생활 중이다 결론:

  • PDF