• Title/Summary/Keyword: coffer dam

Search Result 10, Processing Time 0.024 seconds

FINITE ELEMENT MODELING FOR HYDRODYNAMIC AND SEDIMENT TRANSPORT ANALYSIS (II) : SEDIMENT TRANSPORT STUDY

  • Noh, Joon-Woon
    • Water Engineering Research
    • /
    • v.4 no.2
    • /
    • pp.99-109
    • /
    • 2003
  • Since bed elevation changes are mainly dependent on the flow velocity and corresponding shear stress, it is possible to predict bed elevation numerically using velocity components. For the scour analysis due to channel contraction, a bed load transport model is developed and applied to estimate scour depth around coffer dam in the Mississippi River. During Phase I of the Lock & Dam No. 26 replacement project, a coffer dam was constructed to reduce the flow area approximately by 50%. Flow velocity increases due to the flow area reduction yields significant lowering (erosion) of the channel bed elevation. The proposed numerical model solves the sediment continuity equation using the finite element method to evaluate scour process in the vicinity of the coffer dam

  • PDF

The design of coffer dam utilized P.R.D. method (P.R.D. 공법을 활용한 가물막이 설계)

  • Park, Chal-Sook;Lee, Kyu-Tak;Yum, Kyung-Taek;Kim, Yoon-Ku;Kang, Bong-Gwon;Lee, Jae-Weon;Lim, Seok-San;Jeong, Ji-Yearl
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.869-887
    • /
    • 2008
  • Coffer dam for tunnel type spillway in inflow section of Dae-am dam was originally planned as 2 lines sheet piles with Water Zet method. But, the result of pilot test was caused of some problems that vibration during installation of pile could pollute water and water leakage could the lower part. So, sheet piles was not satisfactory for faculty of coffer dam. Structural instability of sheet pile system need to reinforcement. Characteristic of Dae-am dam was small reservoir capacity but wide drainage area, of which it was judgment that security of leakage and stability was difficult during excavation of inlet part. So, we consider that water curtain method utilized with in site pouring concrete pile method was designed at weir part of spillway. We were known about basement rock that geological boring was carried out in weir part. After taking a deep consideration, PRD method was accepted as a new method. Concrete pile by PRD was installed to below country rock. CJM method was carried out with PRD. After making concrete wall using Top-down method, earth anchors were installed for supporting it. According to the result of numerical analysis, as water level rises, wall is stable.

  • PDF

Effects of Water Level Change on Wetland Vegetation in the Area of Riparian Forest for Dam Construction Period -Focused on the Hantan River Dam- (댐 건설 기간 수위변화가 하반림 일대 습지 식생에 미치는 영향 -한탄강댐을 사례로-)

  • Park, Hyun-Chul;Lee, Jung-Hwan;Lee, Gwan-Gyu
    • Journal of Forest and Environmental Science
    • /
    • v.30 no.1
    • /
    • pp.76-84
    • /
    • 2014
  • This study was performed to monitor the effects of water level change on changes of landscape, vegetation community, and species diversity of riparian forest. Hantan river dam, study area, has been constructed in the area of Chansoo-myeon, Pocheon-si and Yeoncheon-eup, Yeoncheon-gun, Gyeonggi-do, which is a dam for flood control only in flooding season. Landscape changes were notable after the construction of coffer dam, and the changes were caused by water level increase in areas of riparian forests which consisted of mainly withered willow as a dominant species in the flooding season. It changed vegetation communities of riparian forest from Phragmites japonica and Salix koreensis to Phragmites japonica. Species diversity index was lowest in 2010 when the coffer dam was constructed and showed an increasing trend later. Thus, this study is well in agreement with a previous report that plants of the genus Salix wither by muddy water during flooding and also suggests, controlling water level of river and prediction of water level change's effects should be considered when any facilities are planned.

A Field Case on the Pilot Constructions and Changes of a Braced Cut Wall in a Coastal Filled Land (해안매립지반에서의 토류가시설 시험시공 및 변경사례)

  • Hwang, Young-Chul;Kim, Ki-Rim;Kim, Yeon-Jung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.46-55
    • /
    • 2006
  • There are many kinds of braced cut wall methods as the sheet pile, SCW, CIP and slurry wall which is adoptable for a deep excavation construction in a coastal filled land. The braced cut wall which has a strong stiffness is very stable but it has the weak point that the construction cost is high. Thus when a braced cut wall is designed, the geotechnical engineers choose the braced cut wall which has more safe and economic in the consideration of surrounding buildings near the construction site. Especially, when the sheet pile method as a braced cut wall is cheesed, the layer order and consistence of a coastal deposit stratum are considered and the pile driving method is also considered. This paper introduces the case that the originally box-type sheet pile wall was changed to U-type and high strength material after the pilot test at the subway construction site in a coastal filled land. This paper also introduces the case that the sheet pile's driving method was changed to special method in the section of the temporary coffer dam which had made when the present coastal filled land was formed.

  • PDF

A Study on the Wall and Reservoir at the Valley Part of Stone Fortress - Focused on the Fortress of $Geoyeol-seong$ and $Seongsan-seong$ - (석축 산성의 계곡부 체성과 못(池)에 관한 연구 - 거창 거열성과 함안 성산산성을 중심으로 -)

  • Kwon, Soon-Kang;Lee, Ho-Yeol;Park, Un-Jung
    • Journal of architectural history
    • /
    • v.20 no.3
    • /
    • pp.7-22
    • /
    • 2011
  • With the accumulations of outcomes from archaeological excavations of mountain fortress of three kingdoms period, there have been studies about time-periodic territory range of mountain fortress, difference in the way(method) of construction, defence system and so on from various points of view. This is an empirical study on the construction method of the valley part of stone fortress. First of all, it is required to secure large quantity of fresh water for those who lived at mountain fortress. Especially when builders of fortress construct a fortification at the valley part of stone fortress, in advance they must sufficiently consider several options including the establishment of sustainable water resources. First, when it comes to build a fortification on a ridge[or a slope] of a mountain, you have only to consider a vertical stress. However, when it comes to build a fortification at the valley part of a mountain, You must have more sufficient preparations for the constructing process. Because there are not only a vertical stress but also a horizontal pressure simultaneously. Second, a fortification of mountain fortress built by using unit building stone is a structure of masonry construction like brick construction, and the valley part of it is where the construction of the fortification begins. Third, when it comes to build a fortification at the valley part of a mountain, it seems that they use a temporary method such as coffer dam in oder to prevent the collapse of the fortification due to heavy rain. Furthermore, in response to a horizontal pressure a fortification is built by the way of its plane make an arch, or by piling up the soil with the plate method(類似版築) and earthen wall harder method(敷葉) they increase cross-sectional area of the fortification and its cutoff capacity. In front direction they put the reservoir facility for the fear that the hydraulic pressure and earth pressure are directly transmitted to the fortification. The process of constructing the fortification at the valley part of a mountain is done in the same oder as follows; leveling of ground(整地) ${\Rightarrow}$ construction of coffer dam ${\Rightarrow}$ construction of the fortification between the both banks of the valley ${\Rightarrow}$ construction of the fortification at bottom part of spill way(餘水路) between the both banks of the valley ${\Rightarrow}$ construction of spill way(餘水路) & reservoir facility ${\Rightarrow}$ construction of the fortification at upper part of spill way between the both banks of the valley. Coffer dam facility seems to be not only the protection device on occasion of flood but also an important criterion to measure the proper height of spill way or tailrace(放水路). This study has a meaningful significance in that it empirically examines the method of reduction of the horizontal pressure which the fortification at the valley part of a mountain takes, the date the construction was done, and wether the changes in climate such as heavy rainfall influence the process of construction.

A Case study of steel sheet pile (강널말뚝을 이용한 국내.외 시공 사례)

  • 여병철;김광일
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1994.09a
    • /
    • pp.111-118
    • /
    • 1994
  • The use of steel sheet pile walls as barrier walls have the temporary for coffer dam, retaining wall in excavation, etc., but also permanent of semi-permanent for harbor construction, containment systems, vertical barrier systems for waste disposal (landfill) or subway in excavarion. In all these applicaions the resistance of the structure to seepage plays an important role. Also the stability and longevity of the construction, the possibility of permanent control and survey make the steel sheet pile wall a nearly perfect vertical barrier from a technical and economical point of view.

  • PDF

Hydration Heat Analysis of Seongdeok Cofferdam (성덕 다목적댐 가물막이댐의 수화열 해석)

  • Kim, Jin-Keun;Chu, In-Yeop;Jang, Bong-Seok;Ha, Jae-Dam;Park, Byung-Kook;Kim, Jeong-Soo
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.481-484
    • /
    • 2008
  • The temperature crack of concrete structure is caused by the phenomenon which the concrete volume is restricted in the inside or outside part due th the temperature variations induced by the hydration heat of cement. And mass concrete structures are weak in temperature crack. Seongdeok multi-purpose dam is gravity dam which is being constructed in Cheongsong-gun, Gyeonsangbuk-do. Upstream cofferdam was constructed to examine the temperature crack due to hydration heat and to decide the height of placement. Therefore this study performed the hydration heat analysis of Seongdeok upstream coffer dam to analyze the hydration heat according to different height of placement and to compare with measured results.

  • PDF

Stress Analysis of Fill Dam by FEM (FEM에 의한 필댐의 응력해석(應力解析))

  • Kang, Yea Mook;Cho, Seong Seup;Yang, Hae Jin
    • Korean Journal of Agricultural Science
    • /
    • v.19 no.1
    • /
    • pp.79-90
    • /
    • 1992
  • The embankment material of Andong Dam was the decomposed granite soil, and FEM analysis with settlement and stress characteristics were studied in this thesis. and also the results were as follows: 1. The vertical settlement of dam quite nearly coincides with the calculated one by FEM. A maximum value of the measured and the calculated is 40cm and 42cm, respectively, at the EL. 130m. 2. The measured settlement values of the central parts in elevation are nearly the same as those of the calculated, and the settlement values in order of magnitude are in core, filter, random and rock. 3. Horizontal deformation of max. 21cm in downstream is larger than that of max. 17cm in upstream, which is highly influenced by the water pressure of reservoir water level and the earth pressure of coffer dam in upstream. 4. Reverse arching effect of vertical stress in streamflow section are caused by the difference of stiffness, because stiffness is larger in core zone than in filter zone. 5. Load transfer ratio which is the ratio of principal stress of core zone and filter zone is 1.06, which clearly showes the reverse arching effect in vertical stress.

  • PDF

Strength Characteristics of Cemented Sand of Nak-dong River (낙동강유역 시멘트혼합토의 강도특성)

  • Kim, Youngsu;Jeong, Wooseob;Seok, Taeryong;Im, Ansik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.7 no.4
    • /
    • pp.43-52
    • /
    • 2006
  • There were huge damages of human beings and their properties in many areas of the basin of the Nak-Dong river by the unusual weather and the localized downpour recently. In this research against disasters, we want to know strength of the cemented sand that is mixed with cement and poor-graded sand, to estimate CSG(Cemented Sand and Gravel) method used coffer dam in Japan, which is the materials of riverbed in the basin of the Nak-Dong river for levee's construction. For that, we want to provide the fundamental data which need in the examination of adaptation of levee's material, design and analysis by investigating compressive strength by curing period and cement content, elastic modulus and stress by transformation from compaction test, CBR test, unconfined compression test and triaxial compression test as changing cement content from 2% to 8% at two sites in the basin of the Nak-Dong river.

  • PDF

Numerical Modeling of Local Scour Around a Coffer Dam (물막이댐 주변에서의 국부세굴현상 모의)

  • Noh, Joon woo;Kim, Woo Gu
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.419-423
    • /
    • 2004
  • 하상변동은 유속에 의해 얻어지는 전단력에 직접적으로 영향을 받게 된다. 특히 교대나 교각, 그 밖에 수제공 등을 비롯한 수공구조물의 설치에 의하여 흐름단면이 급격히 감소되는 구간에서는 이러한 현상이 매우 활발하게 일어나게 되는데 이는 국부세굴의 직접적인 원인이 되기도 한다. 본 논문에서는 단면축소에 기인한 유속증가에 의해서 발생되는 국부세굴현상을 2차원 유한요소 모델을 사용하여 모의하고 주변의 전반적인 하상변동현상을 규명해 보았다. 먼저 2차원 흐름모형으로부터 유속성분을 구하고 전단력을 구한 다음 소류사 이동공식을 적용한 하상토 보존방정식을 풀이함으로써 국부세굴에 따른 하상의 변동을 수치모델로 예측할 수 있게 된다. 본 논문에서는 유한요소법을 이용, 하상토 보존방정식을 계산한 다음 일정시간동안 모델수행을 통해서 변동이 거의 없을 때까지 하상의 변동사항을 순차적으로 모의하고 예측해 보았다. 적합한 구간을 선정하여 단면축소에 기인한 유속증가로 인한 국부 세굴을 모의하기 위하여 본 모델을 개발, 적용하였다. 미국 미시시피 강에서 Lock & Dam No. 26을 교체하는 제 1단계 작업 중 물막이댐 건설로 인하여 흐름단면이 약 $50\%$ 감소하게 된다. 주로 단면축소 구간을 적용대상으로 선정하여 물막이댐 주변의 하상변동을 모의한 다음 실제 관측치와 비교하여 본 모델의 효용성을 입증하였다. 모형은 기본적으로 유한요소법을 이용해서 하상토 보존 방정식을 풀이한 것으로 van Rijn 소류사 이동공식을 적용하였다. 세굴현상에 기인한 수심증가로 인한 전단력 감소현상도 흐름의 연속조건을 도입하여 모의가능 하게끔 작성하였다.. 상대적으로 적은 것으로 분석되었다. 이번 연구를 통하여 WEP 모형이 유역 물순환 해석에 적절한 모형임을 확인할 수 있었으면, 향후 청계천 유역의 물리적 특성에 대한 매개변수와 인공계 물순환 자료의 보완을 통해 보다 향상된 모의가 가능할 것으로 판단된다. 하였던 Cd과 Mg이 Ca 및 Ca과 vitamin D의 동시(同時) 급여(給與)로 감소(減少)하였고 Cu는 전체적(金體的)으로 변화(變化)가 없었으며 Zn은 Cd 급여(給與)로 감소(減少)하였으나 Ca과 vitamin D의 급여(給與)에 의하여 증가(增加)하였고 Ca은 Ca과 viamin D의 급여(給輿)로 유의(有意)하게 증가(增加)하였다. 신장(腎臟)중의 무기질(無機質) 함량(含量)은 Cd급여(給輿)로 Cu, Mg은 감소(滅少)하였으나 Ca, Zn은 변화(變化)가 없었고 Ca 및 Ca과 Vitamin D의 급여(給與)로 Cd, CU, Zn은 증가(增加)하였다.ce area)는 수술 전100.8$\pm$25.6 mm/$m^{2}$에서 79.3$\pm$ 15.8 mm/$m^{2}$로 감소한 소견을 보였다. 승모판 성형술은 전 승모판엽 탈출증이 있는 두 환아에서 동시에 시행하였다. 수술 후 1년 내 시행한 심초음파에서 모든 환아에서 단지 경등도 이하의 승모판 폐쇄 부전 소견을 보였다. 수술 후 조기 사망은 없었으며, 합병증으로는 유미흉이 한 명에서 있었다. 술 후 10개월째 허혈성 확장성 심근증이 호전되지 않아 Dor 술식을 시행한 후 사망한 예를 제외한 나머지 6명은 특이 증상 없이 정상 생활 중이다 결론:

  • PDF