Process Improvements for Elevating Pre-outfitting Rate of FPSO (FPSO의 선행의장률 향상을 위한 생산관리 및 공법개선 사례연구)

  • Shin, Sung-Chul;Cho, Jong-Burm;Shin, Ki-Young;Kim, Soo-Young
    • Journal of the Society of Naval Architects of Korea
    • /
    • 제46권3호
    • /
    • pp.325-334
    • /
    • 2009
  • Generally, functional design of FPSO has been done by the engineering firm designated by ship owner. Main equipment such as topside facility is imported from abroad. But sometimes, OFE (Owner Furnished Equipment) does not satisfy the PND (Product Need Date) of each production stage because the delivery date of OFE is not scheduled to satisfy the PND. And sometimes many loose items and equipment are complex from engineering which does not consider pre-outfitting. Main objective of this study is process improvements by maximizing pre-outfitting rate in the stage of equipping STP (Submerged Turret Production), one of main equipment on FPSO. In this study, we analyzed the factors which obstructed pre-equipping STP using the past records of FPSO projects.

Application Case of Safety Stock Policy based on Demand Forecast Data Analysis (수요예측 데이터 분석에 기반한 안전재고 방법론의 현장 적용 및 효과)

  • Park, Hung-Su;Choi, Woo-Yong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • 제43권3호
    • /
    • pp.61-67
    • /
    • 2020
  • The fourth industrial revolution encourages manufacturing industry to pursue a new paradigm shift to meet customers' diverse demands by managing the production process efficiently. However, it is not easy to manage efficiently a variety of tasks of all the processes including materials management, production management, process control, sales management, and inventory management. Especially, to set up an efficient production schedule and maintain appropriate inventory is crucial for tailored response to customers' needs. This paper deals with the optimized inventory policy in a steel company that produces granule products under supply contracts of three targeted on-time delivery rates. For efficient inventory management, products are classified into three groups A, B and C, and three differentiated production cycles and safety factors are assumed for the targeted on-time delivery rates of the groups. To derive the optimized inventory policy, we experimented eight cases of combined safety stock and data analysis methods in terms of key performance metrics such as mean inventory level and sold-out rate. Through simulation experiments based on real data we find that the proposed optimized inventory policy reduces inventory level by about 9%, and increases surplus production capacity rate, which is usually used for the production of products in Group C, from 43.4% to 46.3%, compared with the existing inventory policy.

Implementation of Cable Drum Scheduling Algorithm for Productivity Enhancement of Power Plant Electrical Installations (발전소 전기설비의 생산성 향상을 위한 케이블 드럼 스케줄링 알고리즘 구현)

  • Lee, Yang-Sun;Park, Ki-Hong;Choi, Hyo-Beom;Oh, Ji-Hyun
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 한국정보통신학회 2015년도 추계학술대회
    • /
    • pp.770-771
    • /
    • 2015
  • In this paper, we proposed and implemented the automation of cable drum scheduling which is required a considerable construction cost for electrical equipment in power plant. Implemented cable drum scheduling can be reduced the calculation time of cable drum scheduling, and it is possible to minimize the consuming time of cable drum scheduling than conventional methods. Some experiments are conducted to verify the proposed method, and as a result, the automation of cable drum scheduling is well performed, enabling cables can be optimized and scheduled to fit the drum capacity with productivity enhancement of electrical installations.

  • PDF

An Economic Assessment of Large-scale Battery Energy Storage Systems in the Energy-Shift Application to Korea Power System (장주기 대용량 전력저장장치의 부하이전에 대한 실계통 적용 경제성 평가 연구)

  • Park, Jong-Bae;Park, Yong-Gi;Roh, Jae-Hyung;Chang, Byung-Hoon;Toon, Yong-Beum
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • 제64권3호
    • /
    • pp.384-392
    • /
    • 2015
  • This paper presents an economic assessment of large-scale Li-ion battery energy storage systems applied to Korean power system. There are many applications of the battery energy storage systems (BESSs) and they can provide various benefits to power systems. We consider BESSs to the energy time-shift application to Korean power system and evaluate the benefits from the application of BESS in the social perspective. The mixed integer programming (MIP) algorithm is used to resolve the optimal operation schedule of the BESS. The social benefits can include the savings of the fuel cost from generating units, deferral effects of the generation capacity, delay of transmission and distribution infra construction, and incremental CO2 emission cost impacts, etc. The economic evaluation of the BESS is separately applied into Korean power systems of the Main-land and Jeju island to reflect the differences of the load and generation patterns.

Development of Beam-Column Connection for The New Apartment Structural System (장수명 공동주택용 보-기둥 접합부 시공방법 개발)

  • Yoon, Tae-Ho;Hong, Won-Kee;Kim, Sun-Kuk;Park, Seon-Chee;Yun, Dai-Young
    • KIEAE Journal
    • /
    • 제10권6호
    • /
    • pp.145-151
    • /
    • 2010
  • Bearing wall system was used extensively in most multi-residential apartment buildings in Korea. However, bearing wall apartments have the lack of architectural plan flexibility, remodelling-incompatible, causing serious economic losses in terms of construction waste. Recently, many researchers have studied the use of Rahmen structure as a potential alternative. The beam-column connection in the paper for long-life apartment housing forms connection of a Rahmen structure utilizing the advantages of steel and reinforced concrete. In addition, reduction of cast-in place concrete and construction schedule is expected by using precast concrete. Reduction effect of quantity decreased construction costs and $CO_2$ emission of key construction materials. However, verifying the feasibility of new construction method entails numerous challenges. Accordingly, the purpose of this study is to analyze the construction feasibility of sleeve, coupler, and pressure welding connections for long-life apartment building structure. A 3D modeling software was used to perform the analysis, and a real scale model was created to verify the results of construction feasibility. By verifying the construction feasibility of beam-column connections, this study will contribute to the efficient application of these methods on construction sites.

Design Procedure for System in Package (SIP) Business

  • Kwon, Heung-Kyu
    • Proceedings of the International Microelectronics And Packaging Society Conference
    • /
    • 한국마이크로전자및패키징학회 2003년도 International Symposium
    • /
    • pp.109-119
    • /
    • 2003
  • o In order to start SIP Project .Marketing (& ASIC team) should present biz planning, schedule, device/SIP specs., in SIP TFT prior to request SIP development for package development project. .In order to prevent (PCB) revision, test, burn-in, & quality strategy should be fixed by SIP TFT (PE/Test, QA) prior to request for PKG development. .Target product price/cost, package/ test cost should be delivered and reviewed. o Minimum Information for PCB Design, Package Size, and Cost .(Required) package form factor: size, height, type (BGA, QFP), Pin count/pitch .(Estimated) each die size including scribe lane .(Estimated) pad inform. : count, pitch, configuration(in-line/staggered), (open) size .(Estimated) each device (I/O & Core) power (especially for DRAM embedded SIP) .SIP Block diagram, and net-list using excel sheet format o Why is the initial evaluation important\ulcorner .The higher logic power resulted in spec. over of DRAM Tjmax. This caused business drop longrightarrow Thermal simulation of some SIP product is essential in the beginning stage of SIP business planning (or design) stage. (i.e., DRAM embedded SIP) .When SIP is developed using discrete packages, the I/O driver Capa. of each device may be so high for SIP. Since I/O driver capa. was optimized to discrete package and set board environment, this resulted in severe noise problem in SIP. longrightarrow In this case, the electrical performance of product (including PKG) should have been considered (simulated) in the beginning stage of business planning (or design).

  • PDF

Modern High-Power TBM with Advanced Procurement System (오늘날의 고성능 TBM과 선진 장비조달 방안)

  • Jee, Warren W.
    • Tunnel and Underground Space
    • /
    • 제23권3호
    • /
    • pp.161-168
    • /
    • 2013
  • Recently, the application of High-Power mechanized tunnelling technology has been expended around the world. Especially, High-power Modern TBM machines are used in a successful results. Essential for the great success of this modern TBM in difficult rock conditions are based on the development of machine power, suitable better cutter developments, and also developed assesment technology regards on the extensive site investigations. OPP (Owner Procurement Process) system is a proven alternative contract delivery method that is potentially applicable to many tunnel projects. Using the OPP, the owner specifies and procures the TBMs and tunnel lining in advance of the tunnel contract procurement and provides TBM to a tunnel contractor with a goals of reducing project risks and accelerating project schedule. Depending on the blasting vibrations and noises, mechanized tunnelling will be more important particularly in city areas.

The design of 111m high steel towers with 220kv double circuits crossing 12 km wide Bangladesh River (230KV 2회선승 111M 높이 철탑설계 (I) (강폭 12km인 Bangladesh Jamana강 횡단용))

  • 이재숙
    • Journal of the Korean Professional Engineers Association
    • /
    • 제15권4호
    • /
    • pp.12-24
    • /
    • 1982
  • East Parts of Bangladesh have been benifited by low cost energy generated by domestic natural gas but West parts where energy generated by imported fuel. Bangladesh Government authority has very much concerned to transmit the low cost electricity to the West from the East for past several years. To solve such concerns, cross-country 230kv double circuits Power transmission line was proposed, however there was a big obstacle for the realization of this line to cross the Jamuna river which has 12 km long width with a deep muddy river bed. A consultant engineering firm named Merz-Mclellan anyway finalized this plan and a world-wide bid was announced on June 31, 1979. Due to the expected difficulty to construct the towers on sea like area, only three construction groups have participated. including a Korean joint venture organization of Samsung-Korean Developement corporation-Kolon Electric Machinery company. After 3 months bid evaluation, contract was awarded to Korean Consosium and KEM Co was in charge of designing steel towers with anchor bolts and base plates beside to electrical engineering field. Then KEM Co have faced and over-comed many unenpected technical difficulties such as forced eccentricity joint on base plate, distorsion issue of 60mm thick plates welding, threading anchor bolts, tad heat treatment of some anchor bolts, disagreement from Consultant Engineer on multiplying factor of leg stresses for 45$^{\circ}$ wind and on reducing O.L.F for wind loads on cables for such 1220km long spans. After spending two years long period for designing and engineering towers, base plates, and anchor bolts, first shipment of tower was finally realized on Nov. 8, 1981 and on the other hand KDD has proceeded concrete caisson work on schedule at Jamuna river site and expected to complete tower erection and stringing of cables within this year of 1982 which was original completion target.

  • PDF

Changes of Serum Calcium Concentration, Frequency of Ruminal Contraction and Feed Intake Soon after Parturition of Dairy Cows Fed Difructose Anhydride III

  • Wynn, S.;Teramura, M.;Sato, T.;Hanada, M.
    • Asian-Australasian Journal of Animal Sciences
    • /
    • 제28권1호
    • /
    • pp.58-68
    • /
    • 2015
  • Requirements to control the large decrease in serum calcium (Ca) due to parturition and to increase the feed intake soon after parturition have been well accepted in dairy cows. This study was aimed to investigate the feed intake affected by serum Ca concentration with difructose anhydride (DFA) III supplement in dairy cows soon after parturition. Fourteen transition Holstein cows were divided into DFA and control (CONT) groups within 1 to 5 parity variations in each group. Measurement schedule for an individual cow was from 14 d before parturition to 7 d following parturition. The cows in DFA group were supplied 0.2 kg/head/d of DFA III feed containing 40 g of pure DFA III while the cows in CONT group received no DFA III. Other feeding procedures were the same for all cows in both groups. At parturition (d 0), serum Ca concentration sharply declined in both groups (p<0.05). Time interval for recovery from decreased serum Ca to its normal range (>9.0 mg/dL) tended to be faster in DFA group (12 h) than in the CONT group (48 h), but the differences were not significant. Active ruminal contraction was observed in DFA group at following parturition of d 1 (p<0.05), d 3 (p<0.05), and d 5 (p<0.01). Dry matter (DM) intake did not differ between the groups. However, positive correlations were observed between serum Ca concentration and ruminal contraction (p<0.001), and between ruminal contraction and DM intake (p<0.001) during following parturition. According to multiple regression analysis ($R^2$ = 0.824, p<0.001), the DM intake was positively affected by serum Ca concentration and ruminal contraction. These results suggest that feed intake soon after parturition in dairy cows can be increased by improvement of serum Ca concentration and active ruminal contraction, but DFA III supplementation in this study did not improve the lower serum Ca concentration due to parturition.

Bioequivalence of Commercially available Sustained Release Tablets of Diltiazem Hydrochloride (시판 염산 딜티아젬 서방형 정제의 생물학적 동등성)

  • Lee, Young-Bok;Koh, Ik-Bae;Seo, Se-Min;Yoon, Heong-Tung
    • Korean Journal of Clinical Pharmacy
    • /
    • 제3권1호
    • /
    • pp.79-88
    • /
    • 1993
  • Bioequivalence(BE) test of commercially available sustained release tablets of diltiazem hydrochloride(DTZ) was performed to give some guidelines to BE test in korea in case of which drugs with low oral bioavaiiability(BA) due to substantial first-pass hepatic loss form pharmacologically active metabolites. In such cases, the pharmacologic activity after oral administration is greater than anticipated from BA data, based on chemical assay of drug alone. Therefore, this paper explores the use and meaning of area under the plasma concentration-time(AUC) data of parent and its metabolites to access BA if sustained release tablets. Normal healthy male volunteers(n=14) were randomly divided into 2 groups, and sustained release reference$(Herbesser^{(R)})$ and test$(Herben^{(R)})$ tablets of DTZ-30mg were given orally by balanced two-period cross-over dosing schedule. The plasma concentration of DTZ and and its active metabolite, desacetyldiitiazem(DAD), were determined by high performance liquid chromatography, and, $AUC_{DTZ},\;AUC_{DAD},\;AUC_{DTZ+DAD},\;C_{max}\;and\;T_{max}$ obtained. Analysis of varlance(ANOVA) showed that $AUC_{DTZ}\;and\;C_{max}$ passed the standard $(\alpha=0.05,\;1-\beta\geq0.8,\;\Delta\leq0.2)$ of BE test of korea, but $AUC_{DAD}$ was not satisfied from the standpoint of power. On the other hand, $AUC_{DTZ\midDAD}$ may be more avaliable than $AUC_{DAD}$ from the standpoint of statistics and pharmacologic equivalence.

  • PDF