Design Procedure for System in Package (SIP) Business

  • Published : 2003.09.01

Abstract

o In order to start SIP Project .Marketing (& ASIC team) should present biz planning, schedule, device/SIP specs., in SIP TFT prior to request SIP development for package development project. .In order to prevent (PCB) revision, test, burn-in, & quality strategy should be fixed by SIP TFT (PE/Test, QA) prior to request for PKG development. .Target product price/cost, package/ test cost should be delivered and reviewed. o Minimum Information for PCB Design, Package Size, and Cost .(Required) package form factor: size, height, type (BGA, QFP), Pin count/pitch .(Estimated) each die size including scribe lane .(Estimated) pad inform. : count, pitch, configuration(in-line/staggered), (open) size .(Estimated) each device (I/O & Core) power (especially for DRAM embedded SIP) .SIP Block diagram, and net-list using excel sheet format o Why is the initial evaluation important\ulcorner .The higher logic power resulted in spec. over of DRAM Tjmax. This caused business drop longrightarrow Thermal simulation of some SIP product is essential in the beginning stage of SIP business planning (or design) stage. (i.e., DRAM embedded SIP) .When SIP is developed using discrete packages, the I/O driver Capa. of each device may be so high for SIP. Since I/O driver capa. was optimized to discrete package and set board environment, this resulted in severe noise problem in SIP. longrightarrow In this case, the electrical performance of product (including PKG) should have been considered (simulated) in the beginning stage of business planning (or design).

Keywords