• Title/Summary/Keyword: co-schedule

Search Result 126, Processing Time 0.025 seconds

The Construction Status of Fuel Test Loop Facility (핵연료 노내조사시험설비의 시공 현황)

  • Park, Kook-Nam;Lee, Chung-Young;Kim, Hark-Rho;Yoo, Hyun-Jae;Yoo, Seong-Yeon
    • Proceedings of the SAREK Conference
    • /
    • 2007.11a
    • /
    • pp.305-309
    • /
    • 2007
  • FTL(Fuel Test Loop) is a facility that confirms performance of nuclear fuel at a similar irradiation condition with that of nuclear power plant. FTL construction work began on August, 2006 and ended on March, 2007. During Construction, ensuring the worker's safety was the top priority and installation of the FTL without hampering the integrity of the HANARO was the next one. The installation works were done successfully overcoming the difficulties such as on the limited space, on the radiation hazard inside the reactor pool, and finally on the shortening of the shut down period of the HANARO. The Commissioning of the FTL is to check the function and the performance of the equipment and the overall system as well. The FTL shall start operation with high burn up test fuels in early 2008 if the commissioning and licensing progress on schedule.

  • PDF

A Study on the Development and Application of a Small Shipyard Customized Production Process Planning and Management System (소형조선소 맞춤형 생산공정 계획관리 시스템 개발 및 적용에 관한 연구)

  • Kim, Young-Hun;Hong, Min-Jong;Baek, Seung-Ju;Lee, Won-Seok;Jo, Yong-Hwa;Lee, Dae-Hyung;Lee, Hoon-Sick;Na, Sung-Tae
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.1
    • /
    • pp.79-86
    • /
    • 2022
  • In general, since the types and types of ships, so complex and various variables are included to measure the amount of construction work. In addition, it is mot easy to predict the schedule or the number of working hours before ship construction, and it is also mostly inaccurate. As a result, the master plan is manually drawn up by the expert's experience, but there are limitations due to various factors. Medium and large shipyards are operating APS(Advanced Planning and Scheduling) system that reflects industrial characteristics to improve productivity in the planning stage, and utilize information from systems such as ERP(Enterprise Resource Planning) system and MES (Manufacturing Execution System). On the other hand, small shipyards rely mostly on manual work such as Excel work based on the experience of the workers. Therefore, this study intends to develop a master plan management system that can efficiently manage the production process from the business planning stage in consideration of the characteristics of small shipyards.

Advanced Work Packaging (AWP) in Practice: Variables for Theory and Implementation

  • Jung, Youngsoo;Jeong, Yeheun;Lee, Yunsub;Kang, Seunghee;Shin, Younghwan;Kim, Youngtae
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.201-206
    • /
    • 2020
  • Diversification of project delivery methods (PDM) under ever-changing construction business environment has significantly changed the role of project participants. Active efforts to effectively sharing the roles and responsibilities have been observed in the project management offices (PMOs) among owner/operator organizations as well as engineering, procurement, construction and maintenance (EPCM) firms. In order for being effective in a holistic way throughout the project life-cycle, a PMO needs to have 'adequate management skills' as well as 'essential technical capabilities' in cooperating with many different participants. One of the well-known examples of the PMO's tool to support these skills and capabilities is the effective 'work packaging (WP)' that serves as a common basis integrating all relevant information in a structured manner. In an attempt to enhance the construction productivity, the concept of 'advanced work packing (AWP)' has been introduced by Construction Industry Institute (CII). The AWP enables productivity to be improved by early planning of construction packages in the design phase "with the end in mind". The purpose of this study is to identify and evaluate the 'variables' of advanced work packing (AWP) for life-cycle information integration. Firstly, an extended concept of advanced WP based on the CII AWP was defined in order to comprehend many different issues of business functions (e.g. cost, schedule, quality, etc.). A structured list of major components and variables of AWP were then identified and examined for practical viability with real-world examples. Strategic fits and managerial effectiveness were stressed throughout the analyses. Findings, implications and lessons learned are briefly discussed as well.

  • PDF

The method of development for enhancing reliability of missile assembly test set (유도탄 점검 장비의 신뢰성 향상을 위한 개발 방법)

  • Koh, Sang-Hoon;Han, Seok-Choo;Lee, Kye-Shin;Lee, You-Sang;Kim, Young-Kuk;Park, Dong-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.8
    • /
    • pp.37-43
    • /
    • 2018
  • A developer solves problems with isolating failures if faults are detected when inspecting missiles using the missile assembly test set (MATS) and then resumes the testing. In order to identify faults, it is necessary to analyze the data coming from the equipment, but the information received may not be sufficient, depending on the inspection environment. In this case, the developer repeats the test until the problem is reproduced or checks the performance of each piece of equipment that is related to the fault. When this task is added, schedule management becomes problematic, and development costs rise. To solve this problem, we need to design a MATS in a systematic way to increase fault coverage while satisfying the required reliability. By designing the necessary processes for each procedure, it is possible to reduce the fault identification time when a fault is detected during operations. But it is not possible to guarantee 100% fault coverage, so we provide another method by comparing costs and effects. This paper describes a development method to enhance the reliability of the missile assembly test set; it describes the expected effects when it is adapted, and describes the limitations of this method.

Construction Waste Management System for Improving Waste Treatment on the Construction Site (건축현장의 환경관리 업무 효율성 향상을 위한 폐기물 관리 시스템 - 공동주택을 중심으로 -)

  • Cha, Namwoo;Park, Wansu;Kim, Kyungrai;Cha, Heesung;Shin, Dongwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.83-91
    • /
    • 2014
  • The problems of environmental pollutions and resources depletion have been growing issues in global construction recently. Efforts to reduce $CO_2$ emission have been also made in all sectors of construction industry these days. As one of the biggest industries that consume a huge amount of resources and generate complex construction wastes, the construction industry has significant impacts on environment issues. However, systematic approach to manage wastes has been rarely made, and most construction wastes from construction sites are being land-filled or incinerated. In this study, a system is proposed to predict the amount of wastes in visual formats, and to control the process of wastes management. The system's main functions include : (1) to estimate the amount of wastes to be generated in project schedule, (2) to categorize the types of wastes, (3) to determine the timing of taking out wastes from sites, and (4) to share information regarding wastes for recycling. A huge amount of wastes are generated in construction process, but most of the wastes have been discharged in forms of mixed wastes, which make them hardly reused. The system not only provide information on wastes to be generated, but also prevent mixing various wastes by classifying them by types and schedules. This features of the system, along with functions to share wastes information with other agencies outside the site, are expected to enhance the level of wastes recycling to a great extent. By saving construction materials through wastes recycling, the system also contributes in reducing $CO_2$ emission.

An Experimental Study on the Combustion Characteristics of a Catalytic Combustor for an MCFC Power Generation System (MCFC 발전시스템용 촉매연소기의 연소 특성에 관한 실험적 연구)

  • Hong, Dong-Jin;Ahn, Kook-Young;Kim, Man-Young
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.36 no.4
    • /
    • pp.405-412
    • /
    • 2012
  • In the MCFC power generation system, the combustor supplies a high temperature mixture of gases to the cathode and heat to the reformer by using the off-gas from the anode; the off-gas includes high concentrations of $H_2O$ and $CO_2$. Since a combustor needs to be operated in a very lean condition and avoid local heating, a catalytic combustor is usually adopted. Catalytic combustion is also generally accepted as one of the environmentally preferred alternatives for generation of heat and power from fossil fuels because of its complete combustion and low emissions of pollutants such as CO, UHC, and $NO_x$. In this study, experiments were conducted on catalytic combustion behavior in the presence of Pd-based catalysts for the BOP (Balance Of Plant) of 5 kW MCFC (Molten Carbonate Fuel Cell) power generation systems. Extensive investigations were carried out on the catalyst performance with the gaseous $CH_4$ fuel by changing such various parameters as $H_2$ addition, inlet temperature, excess air ratio, space velocity, catalyst type, and start-up schedule of the pilot system adopted in the BOP.

Developing an Owner's Project Evaluation Framework for Construction Management (프로젝트 관리자로서의 발주자 사업수행평가 프레임워크 개발)

  • Kim, Jonghoon;Lee, Hyun-Soo;Park, Moonseo;Park, Sanghyuk;Lee, Inbeom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.130-137
    • /
    • 2016
  • Owner's participation on a construction project can alter the success of a construction project. In general, success of a construction project is measured by project schedule and cost decrease without considering the role an owner has in a project. As a result, this research developed a framework for the project evaluation form and after extracting a total of 9 project critical success factors (CSF) and 27 sub-CSF. AHP method was utilized to evaluate the importance factor of each CSFs. Setting a goal for each CSFs at the beginning of a project and comparing the values at the completion of the project utilizing the project evaluation form will allow a systematic evaluation and management of a project. Solution Map was introduced and Solution Tool was suggested in order to utlize the evaluation results effectively. In the future studies, various project cases needs to be supplemented for further verification and a solution based on the evaluation result needs to be developed that can be applied to construction projects.

A Study on Spatial Scheduling in the P.E. Stage (선행 탑재장에서의 공간일정계획에 관안 연구)

  • Koo Chung-kon;Yoon Duck-Young;Bae Tae-Kyu;Cho Min-Ch
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2004.05a
    • /
    • pp.61-66
    • /
    • 2004
  • In this paper an effort is made to develop an innovative spatial arrangement concept pertaining to ship building industry. The spatial scheduling is the problem that concentrates on effective planning of available space and arrangements of blocks and in a priority manner. In order to create an effective spatial scheduling. a database providing the priority has to be available to make the erection sequence. Such a system works hand in hand with erection sequence generator program The erection sequence program works on the conventional network analysis method which uses a typical parent-children idea for the calculation of the ENT(possible earliest network start time) and LNT(possible latest network start time). This program works in a cyclic manner taking turns by calculating the ENT in upward trace and LNT on the return trace thereby generating the entire erection sequence diagram for the requisite problem The generated database serves as an input data for spatial scheduling problem. When the system works it takes into consideration the entire system based on heuristic concepts as mentioned. There system uses the spatial aspects such as the available area of the P. E area and plan area of the corresponding blocks and its priority of erection from the erection sequence generator program develops the spatial scheduling arrangement. In this paper using all these concepts an innovative spatial schedule development system developed.

  • PDF

A Study on Experimental Method of Blasting Vibration in Curing Concrete (양생중인 콘크리트에서의 발파진동의 영향 시험방법에 대한 연구)

  • Kim, Jang-Deuk;Kim, Yong-Ha
    • The Journal of Engineering Geology
    • /
    • v.19 no.3
    • /
    • pp.417-422
    • /
    • 2009
  • Tunnels that have recently been constructed are characterized by longer length than ever before and furthermore they frequently go through the ground area with poor conditions such as fractured zones. If ground strength is weak, plastic deformation of tunnel occurs, and occasionally a big fall may be brought about. Up to now, the construction work of tunneling has been executed as a sequential method placing the lining concrete after completion of excavation. Such a method requires a long time and much money to complete the tunnel. It is hard to ensure the stability of tunnel if tunnel is left undone for a long time after excavation in fracture zones or plastic grounds. For this reason, we tried to take simultaneous construction of tunnel excavation and lining concrete in order to not only shorten construction schedule but also stabilize the tunnel at the highly fractures zone as soon as possible. As preliminary consideration for simultaneous construction, in-situ tests are performed to calculate the isolation distance over which blasting vibration does not influence the strength of lining concrete. Improvement of ling form, placing method of concrete, ventilation using a dust collector, together with equipment arrangement, was made to assure the simultaneous construction work.

Dietary Behaviors, Consumed Time for Job Duties and Fatigue Levels of Dietitians by School Foodservice Type in Taejon and Chungnam (학교급식 영양사의 식행태, 업무소요시간 및 피로도에 과한 실태조사 -대전.지역충남의 급식방식별 비교 -)

  • 박영숙;김연순;우미경
    • Korean Journal of Community Nutrition
    • /
    • v.1 no.2
    • /
    • pp.250-259
    • /
    • 1996
  • The school foodservice(FS) dietitians of conventional, co-management and central kitchen systems were compared for their levels of fatigue degrees in order to examine their work specification but no to diminish their educational roles. One hundred and thirtheen primary schools in Taejon and Chungcheongnam-Do participated in the survey, of which foodservice were consisted of 99 conventional types, 7 comanagement types and central kitchen types. Information was collected about the various working hours dietary behavior and fatigue symptoms of the dietitians. The results of this study were as follows : Among 3 school foodservice types, dietitians spent 8 hours and 16 minutes daily for their for their work on the average. However, the central kitchen type dietitans in cities spent 3 hours more compared to the others. The data from the dietitians' work schedule sheets showed that the 5 parts of dietitian's duties set in the school foodservice laws were not well performed. In the central kitchen type they spent more time for food production whereas in the conventional they spent more time for menu formation and hygiene control. It was found that fatigue levels of school foodservice dietitians were chronic with no difference among foodservice systems or among school locations. Our results indicated that nutrition education in primary schools was almost neglected. It is suggested that the school foodservice should meet all the objectives of school-lunch program even though they saved dietitians' work load more or less. The importance of students to improve their dietary habits could never be overlooked. (Korean J Community Nutrition 1(2) : 250-259, 1996)

  • PDF