Analysis of Causes and Impact of Change Orders in the U.S. Military Construction Projects (미군 시설공사 설계변경 요인과 영향에 대한 연구)

  • Park, Insung;Kim, Harim;Lee, Hak-Ju;Kim, Do-Hyung;Min, Yoon-Gi;Cho, Hunhee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.3
    • /
    • pp.213-219
    • /
    • 2021
  • Change orders that occur frequently during the construction phase, af ect the construction performance in terms of cost, time, quality, safety and environment, and place a huge burden for stakeholders of given projects. This study analyzed the causes of change orders and their impact on the basis of 721 cases and a questionnaire of 164 domestic U.S. military construction participants in a total of 24 U.S. military projects. Important factors for change orders in the US military construction projects were engineering change due to design errors (348 cases, 48.3%), user requests change(86 cases, 11.9%), and different site conditions (69 cases, 9.6%). In addition, due to the change orders, construction cost increased by 6.56% on average and construction period was extended by 21.1% compared to the original schedule. As a result, it is anticipated that domestic construction companies can obtain a better understanding of change orders and construction performance, which may be difficult due to accessibility and limitations to military facilities. Also, it is proposed a successor study that guides in the right direction for the U.S. Military Construction.

A Comparative Study on Spatial Characteristics of Parcel by Type of Building Construction (건축행위 유형별 필지의 공간적 특성 비교연구)

  • Kim, Kijung;Kim, Dongjun;Lee, Seungil
    • Journal of Korea Planning Association
    • /
    • v.54 no.6
    • /
    • pp.27-42
    • /
    • 2019
  • The purpose of this study is to identify the spatial characteristics of the parcels in which building construction occurred. In recent, urban development patterns in Korea have been shifting from the past. Small-scale development at parcel level is becoming more important in accordance with individual location needs in the low-growth era unlike public lead large-scale urban development in the rapid growth period. Therefore, it is necessary to study the spatial characteristics of the parcels where small-scale development takes place for future urban development management. This study used the chi square independence test, t-test and ANOVA (analysis of variance) to identify the spatial characteristics. The results of the study show that there is a spatial characteristics difference not only between building construction and non-building construction parcels, but also by type of building construction. The parcel where the building construction occurred have a higher proportion in detached house, major commercial districts, district unit planning areas, and commercial areas. In addition, it is caused by parcels, which are large scale and economically valuable, and are influenced by traffic factors such as urban centers and subway accessibility. As a result of each type of building construction, the parcels where the building use change occurred have spatial characteristic difference compared to other building construction, while the spatial characteristics are similar between the new construction/extension and new construction/extension with change of use. Based on this results, it will be possible to identify areas with high demand for small-scale development in the future and to utilize them for planning management of urban development. Furthermore, it will be possible to manage development demand by type of building construction, and to prepare differentiated plans considering the appropriateness of development plan, availability of infrastructure, and harmony with surrounding environment.

A Case Study on Value Improvement through applying VE Method in Stage of Railway Construction (시공 VE기법을 적용한 철도구조물의 가치향상 사례 연구)

  • Cho, Ki-Yon;Park, Mi-Yun;Kim, Sung-Hun;Seo, Jong-Won
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.23-29
    • /
    • 2008
  • Most VE operation related to construction project is progressed in stage of planing or design phase, especially in case of domestic. It is encouraging fact and if you have VE process in stage of planning and design, you'll have experience a reduction of about 70% of total saving cost in which total construction process may occurred. However, recently the work of construction in overseas increase and almost is only construction-work, except planning and design process. As this reason, VE process for construction-work phase only is demanded in high necessity. VE in construction phase comes to accomplish intensively in the part which the design change does not follow, through know-how, equipment operating method and method of temporary-structure erection at the established construction-site learned, builders will be the possibility of reduction from 3% to 10% in constructive expense. This paper describes VE performing example in OO company's construction-work phase, and propose the methodology of VE performance in the phase of construction. And also it is aimed to extending VE applications into the overseas construction enterprise.

  • PDF

Momentum of Design Change and Social Construction of Technology (기술의 사회적 구성과 산업디자인의 변동 연구)

  • 채승진
    • Proceedings of the Korea Society of Design Studies Conference
    • /
    • 1999.10a
    • /
    • pp.84-85
    • /
    • 1999
  • 산업디자인은 기술시스템의 하부구조이다. 여기서 기술시스템은 현대 산업사회를 구성하는 다양한 과학기술체계를 뜻한다. 이 현대 기술시스템은 에너지 개발과 공급체계, 교통 및 운송유통체계, 주거 및 공장체계, 식량공급체계, 통신방송체계, 금융체계 그리고 여가 및 오락체계 등으로 구성되며 이들 시스템 역시 자체의 하부구조를 갖게된다.(중략)

  • PDF

A Process for Replacing BIM Property Information about Internal Finishing of Office Building in Design Phase (업무시설 설계단계 BIM 내부마감 속성정보 교체 프로세스)

  • Han, Ji-Ho;Nam, Dong-Hee;Park, Sang-Hun;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.207-208
    • /
    • 2023
  • The procedure of predicting the construction cost and selecting the best alternative is performed based on comparative review of each building case. In the case of office building, it is required continuously until design is complete, since the owner requirements are various and likely to change during the design process compared to a standardized apartment. However, since the comparison work for each alternative in practice uses only the unit construction cost, there is no correlation between the alternative and the final result, and it is difficult to quantitatively determine the effect of the determined design factor on the total construction cost. It is needed that a means to support the generation of design alternatives using similar building cases during the design phase. This paper proposes a BIM-based data replacing process to support creating and comparison of design alternatives of internal finishing for office building. When design alternatives are created through the proposed process, it is possible to compare several similar cases with current project under equivalent design circumstance. Because only some finishing properties are replaced while maintaining the shape information such as the length, height, and base constraint of the object to be replaced.

  • PDF

PERFORMANCE EVALUATION FRAMEWORK FOR ENGINEERING CONSULTANTS OF TAIPEI RAPID TRANSIT SYSTEMS

  • Chien-Hui Sun;Nie-Jia Yau
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.426-431
    • /
    • 2011
  • The quality of performance evaluation on engineering consultants that provide design-related technical services is difficult to be measured, and only a handful of papers discussed the quality during the design stage. Although design cost is relatively far less than construction cost for a project, the decisions made in the design phase have a significant impact on the final products of the project, especially for large public construction projects. Therefore, this research focuses on reviewing and then establishing a performance evaluation framework for the consulting firms that execute detailed design and provide technical services for the Taipei Rapid Transit Systems (TRTS). By interviewing experts, this study first established a set of indicators to evaluate these firms' performance. Then, those indicators were incorporated into the four aspects of balanced scorecard (BSC) to establish the architecture of the evaluation mechanism. The weight of each indicator was calculated by analytic hierarchy process (AHP) from a survey conducted among experts. The results showed that the top-three indicators were quantity take-off, functions conformity, and budgeting. The framework of performance evaluation established by this study can be applied to measure service performance during the design stage. It not only facilitates the monitoring of consulting firms, but also helps to reduce unnecessary change orders and disputes during the construction stage.

  • PDF

MODEL-BASED LIFE CYCLE COST AND ASSESSMENT TOOL FOR SUSTAINABLE BUILDING DESIGN DECISION

  • Iris X. Han;W. Zhou;Llewellyn C.M. Tang
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.311-317
    • /
    • 2011
  • There is a growing concern in reducing greenhouse gas emissions all over the world. The U.K. has set 34% target reduction of emission before 2020 and 80% before 2050 compared to 1990 recently in Post Copenhagen Report on Climate Change. In practise, Life Cycle Cost (LCC) and Life Cycle Assessment (LCA) tools have been introduced to construction industry in order to achieve this such as. However, there is clear a disconnection between costs and environmental impacts over the life cycle of a built asset when using these two tools. Besides, the changes in Information and Communication Technologies (ICTs) lead to a change in the way information is represented, in particular, information is being fed more easily and distributed more quickly to different stakeholders by the use of tool such as the Building Information Modelling (BIM), with little consideration on incorporating LCC and LCA and their maximised usage within the BIM environment. The aim of this paper is to propose the development of a model-based LCC and LCA tool in order to provide sustainable building design decisions for clients, architects and quantity surveyors, by then an optimal investment decision can be made by studying the trade-off between costs and environmental impacts. An application framework is also proposed finally as the future work that shows how the proposed model can be incorporated into the BIM environment in practise.

  • PDF

A study on the Analysis of Building Information Modeling Factors of Construction Firms Using an Analytic Hierarchy Process (계층분석법을 이용한 BIM(Building Information Modeling)이 건설사에 미치는 영향요인 분석에 관한 연구)

  • Shim, Jin Kyu;Yi, Hye In;Kim, Jae Jun
    • KIEAE Journal
    • /
    • v.10 no.4
    • /
    • pp.123-130
    • /
    • 2010
  • A lot of construction companies in overseas markets of construction try to change 2D CAD to 3D CAD for improving business ability and change to Building Information Modeling(BIM) for integrating information produced from construction life cycle. In America, GSA(General Service Administration) requires a design drawing planed by BIM and in Singapore and Europe, the government encourages architectures to use this tool. Recently in the domestic market, many organizations related construction industry are aware of importance of 3D CAD integrated information, and try to use BIM. Therefore, this research would analyze how does BIM affect construction industry and derive influence factors and provide basic data for using BIM.

Delay Factors in Building Construction Projects in Rwanda

  • Umuhoza, Esperance;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.5
    • /
    • pp.467-475
    • /
    • 2019
  • Delay is one of the most critical issues for construction projects and leads to huge losses in both developing and industrialized countries. The construction sector in Rwanda, a rapidly-developing nation, is no exception. Delays can be mitigated only once we have identify their primary causes, and these may not be the same in each region. This study aims to ascertain the main critical factors responsible for delays in building construction in Rwanda through an intensive literature review and questionnaire survey. A total of 40 delay causative factors were obtained from a literature review and were further classified into nine major categories. The questionnaire survey was distributed to about 80 respondents from clients, contractors, and consultants. From the list of 40 different factors, the top twelve most critical causes were identified as stoppage of work due to cash flow constraints, delay in approving design documents, confidentiality of physical plan, price fluctuations and delay in approving significant change, change orders, delay in performing inspections, Ineffective project planning, inadequate drawing details, unqualified labor, lack of materials on the market and dishonesty.

Study on the Utilization of System Form By the Variation on Structure Elevation (구조물 입면 변화에 따른 시스템 거푸집 활용 방안 연구)

  • Lee, Yong-Sang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.207-208
    • /
    • 2014
  • The construction of economic, efficient and stable process has been a major challenge as the building are getting high-rise and biger. Low-rise buildings widely have been used Euro-form in the past. Recently, we are mainly using Al-form which can respond to chang in the various structures. we should be used in combination with Al-form and Gang-form to ensure the quality and construction process, according to the change of various elevations. Recently construction project is reguired diversification of elevation. And we apply the open balcony on the general architecture as well as public housing. Accordingly, Al-form & Gang-form has been applied the change of elevation, We further apply design and construction as proposal of issues and alternatives.

  • PDF