• Title/Summary/Keyword: cast-in-concrete

Search Result 499, Processing Time 0.026 seconds

Static Shear Resistance of Cast-In-Place Anchors in Cracked Concrete (균열콘크리트에 매입된 선설치앵커의 정적 전단하중에 대한 저항강도)

  • Park, Yong Myung;Ju, Ho Jung;Kim, Dong Hyun;Kang, Moon Ki;Lee, Jong Han
    • Journal of Korean Society of Steel Construction
    • /
    • v.27 no.1
    • /
    • pp.87-97
    • /
    • 2015
  • In this study, an experimental study was performed to evaluate the concrete breakout strength of cast-in-place(CIP) anchors in cracked concrete under static shear loading. The CIP anchors involved in this study were 30mm in diameter with an edge distance of 150mm and an embedment length of 240mm. The experiment was carried out for two specimens in uncracked concrete and three specimens in cracked concrete orthogonal and parallel to the direction of shear loading, respectively. Compared to the uncracked concrete specimen, cracked specimen orthogonal to the direction of shear loading showed no reduction in the concrete breakout strength and that parallel to the load direction about 91% strength which corresponds to 84% of uncracked concrete strength defined in ACI 318-11. Therefore, the experimental results showed smaller decrease in the shear resistance of CIP anchors in cracked concrete than that specified in ACI code which account for 71% strength of uncracked concrete in cracked concrete.

3D FE Analysis of Cast-in-situ Concrete Pile embedded in Weathered Rock (풍화암에 지지된 현장타설말뚝의 3차원 해석)

  • Kim, Sang-Baek;Lee, Whaol;Kwon, Oh-Kyun;Choi, Yong-Kyu
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.167-172
    • /
    • 2000
  • In this study, the behaviors of a cast-in-situ concrete pile embedded in the weathered rock were analysed by a 3D numerical analysis using PENTAGON 3D and the results were compared with those of the field load test. The load-settlement relation and the load transfer relationship were evaluated from the numerical analysis. As a result, the load-settlement relation at the pile top and the axial load distribution with depth were predicted reasonably. And those results were similar with those of the field load test.

  • PDF

Cyclic load experiment study on the laminated composite RC walls with different concrete ages

  • Zhang, Hongmei;Lua, Xilin;Li, Jianbao;Liang, Lin
    • Structural Engineering and Mechanics
    • /
    • v.36 no.6
    • /
    • pp.745-758
    • /
    • 2010
  • 12 typical laminated composite reinforced concrete (RC) walls with different concrete ages and 3 cast-in-place RC walls subjected to low frequency cyclic load were carried out in this study. The failure mode, force-deformation response and energy dissipation capacity of these specimens were investigated. Differences of structural behaviours between composite RC walls and common cast-in-place RC walls were emphasized in the analysis. The compatibility of the composite specimens with different concrete ages was discussed based on the experiment. Test results indicated that the differences between the lateral bearing capacity and the displacement ductility of the composite walls and the common walls were not so obvious. Some of the composite specimen even has higher bearing capacity under the experiment loading situation. Besides, the two parts of the laminated composite specimens demonstrates incompatibility at the later loading sequence on failure mode and strain response when it is in tension. Finally, this laminated composite shear walls are suggested to be applied in rapid reconstruction structures which is not very high.

Performance Requirement of Cast-in-place Concrete with Sandwich Insulation (타설형 콘크리트 중단열 벽체의 요구성능 분석)

  • Park, Jun-Ho;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.10-11
    • /
    • 2014
  • Energy load of building affected by insulation performance of building's exterior. and insulation system can be classify interior insulation, exterior insulation, sandwich insulation according to install place of insulation. but within interior insulation system, corner wall and the cross outer wall-slab insulation part may occur thermal bridges. And then, within exterior insulation system is more superior insulation performance than interior insulation, but it has difficult to apply, easily broken at high building because of strong wind load. And also difficult to maintenance exterior insulation system. So, in this study, to found requirement performance of cast-in-place sandwich insulation system that is superior insulation performance and easy construction and maintenance. requirement performance of cast-in-place sandwich insulation system is 1) To avoid thermal bridges in the insulation performance, 2) Both sides concrete wall can be composite action in the structural performance. Because of this study, can develops cast-in-place sandwich insulation system and this insulation system contribute to improve insulation performance of apartment-house and high building.

  • PDF

Cracking of a prefabricated steel truss-concrete composite beam with pre-embedded shear studs under hogging moment

  • Gao, Yanmei;Zhou, Zhixiang;Liu, Dong;Wang, Yinhui
    • Steel and Composite Structures
    • /
    • v.21 no.5
    • /
    • pp.981-997
    • /
    • 2016
  • To avoid the cracks of cast-in-place concrete in shear pockets and seams in the traditional composite beam with precast decks, this paper proposed a new type of prefabricated steel truss-concrete composite beam (ab. PSTC beam) with pre-embedded shear studs (ab. PSS connector). To study the initial cracking load of concrete deck, the development and distribution laws of the cracks, 3 PSTC beams were tested under hogging moment. And the crack behavior of the deck was compared with traditional precast composite beam, which was assembled by shear pockets and cast-in-place joints. Results show that: (i) the initial crack appears on the deck, thus avoid the appearance of the cracks in the traditional shear pockets; (ii) the crack of the seam appears later than that of the deck, which verifies the reliability of epoxy cement mortar seam, thus solves the complex structure and easily crack behavior of the traditional cast-in-place joints; (iii) the development and the distribution laws of the cracks in PSTC beam are different from the conventional composite beam. Therefore, in the deduction of crack calculation theory, all the above factors should be considered.

Pull-out Capacity of Cast-in-place Anchor for Construction of Precast Concrete Segment Arch (프리캐스트 콘크리트 패널 분절 아치 시공을 위한 선설치 앵커의 인발 강도 평가)

  • Ahn, Jin-Hee;Yim, Hong Jae;Bang, Jin Soo;Jeon, Seok Hyeon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.24 no.2
    • /
    • pp.94-102
    • /
    • 2020
  • Precast concrete segment arch system has an economic and construct ability that combined with advantage of precast concrete and arch behavior. A precast concrete segment arch system with outrigger is consisted of segmented precast panels, a steel outrigger rib, and V-strip to connect precast panels with a steel outrigger rib and cast-in-place anchors in precast panels to connect V-strip should have sufficient pull-out capacity to form its arch shape by site lifting for assembled precast panels and outriggers. However, it is difficult to secure its embedment depth due to the relatively shallow thickness of precast panel. It can be also occurred that flexure deformation of precast panels caused by its pull-out behaviors. In this study, pull-out capacity of cast-in-place anchor was examined for construction of precast concrete segment arch system with outriggers. Therefore, a total of 24 precast panel specimens were fabricated to examine pull-out capacities of cast-in-place anchor in precast panels, and installation depth of anchors, diameter of anchors and wire mesh effects for the precast panel were examined. From this pull-out tests, its pull-out capacities and failure modes were evaluated and the type of the cast-in-place anchor applicable to the precast concrete segment panel arch system with outriggers was determined from comparison of the design specification values.

An Experimental Study on the Setting of Antiwashout Underwater concrete Using Fly Ash (플라이애쉬를 사용한 수중불분리성 콘크리트의 응결에 관한 실험적 연구)

  • 권중현;김봉익
    • Journal of Ocean Engineering and Technology
    • /
    • v.15 no.4
    • /
    • pp.120-125
    • /
    • 2001
  • This paper describes the effect of fly ash replacement on the setting time of antiwashout underwater concrete, where cement was replaced by 0% to 50%. Experimental work was performed on the condition of sea water and in air to find out the characteristics of setting time between the concretes that were cast in air and cast in 15$^{\circ}C$ of sea water. The experimental results show that the setting time of underwater concrete with 50% replacement was delayed about 10 hours than normal concrete. And it can be concluded that, at the case of underseawater concrete addicted with fly ash, the delayed final setting times are shown as the function Tf=0.069F+7.69, where Tf is the delayed final setting time and F is quantity of fly ash, respectively. These results confirm that the setting time underseawater concrete could be prolonged.

  • PDF

Fracture Behavior of Cast-in-place Headed Anchors to Concrete (콘크리트 CIP 앵커시스템의 파괴거동에 관한 연구)

  • 박성균;김호섭;윤영수;김상윤
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.04a
    • /
    • pp.491-496
    • /
    • 2000
  • This paper presents the evaluation of behavior and the prediction of tensile capacity of anchors that fail concrete, as the design basis for anchorage. Tests of cast-in-place headed anchors, domestically manufactured and installed in uncracked, unreinforced concrete are performed to investigate the behavior of single anchors and multiple anchors with the consideration of various embedment lengths and edge distances. The failure mode and the load-deformation response of these anchors are discussed and the concrete failure dta are then compared with capacity predictions by the two existing methods : the 45 degree cone method of ACI 349, 318 and the concrete capacity design (CCD) method. Discrepancies between the test results and these two prediction methods, FEM analysis are assessed.

  • PDF

Behaviour of fiber reinforced concrete beams with spliced tension steel reinforcement

  • Safan, Mohamed A.
    • Structural Engineering and Mechanics
    • /
    • v.43 no.5
    • /
    • pp.623-636
    • /
    • 2012
  • The aim of the current work is to describe the flexural behaviour of simply supported concrete beams with tension reinforcement spliced at mid-span. The parameters included in the study were the type of the concrete, the splice length and the configuration of the hooked splice. Fifteen beams were cast using an ordinary concrete mix and two fiber reinforced concrete mixes incorporating steel and polypropylene fibers. Each concrete mix was used to cast five beams with continuous, spliced and hooked spliced tension steel bars. A test beam was reinforced on the tension side with two 12 mm bars and the splice length was 20 and 40 times the bar diameter. The hooked bars were spliced along 20 times the bar diameter and provided with 45-degree and 90-degree hooks. The test results in terms of cracking and ultimate loads, cracking patterns, ductility, and failure modes are reported. The results demonstrated the consequences due to short splices and the improvement in the structural behaviour due to the use of hooks and the confinement provided by the steel and polypropylene fibers.