• Title/Summary/Keyword: case project

Search Result 3,194, Processing Time 0.029 seconds

A Case Study on a Programming Subject through Project-Based Learning in the COVID-19 Environment (코로나-19 환경에서의 프로젝트 교수법을 통한 프로그래밍 지도 사례)

  • Lee, Sungock;Yang, SeungEui;Jung, Hoekyung
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.25 no.11
    • /
    • pp.1655-1662
    • /
    • 2021
  • The purpose of this study is to draw implications through a case study on the curriculum operation of a professor who operated a programming subject as a PBL(project-based learning) method in an untact situation due to COVID-19. A survey was conducted for first-year freshmen students to determine their learning condition before project implementation. Based on the results of the questionnaire, individual interviews were conducted to identify the needs for education, and then, basic grammar for project completion and lectures that segmenting each stage of the project were composed. Repeated learning was induced through weekly quizzes, and feedback was given by giving time in advance until the project deadline. 23 students (40 students in total) completed the project. The remaining 17 students took the exam but did not complete the project. The purpose of this study is significant in that it investigated whether a project can be carried out through instructional design, execution, and interaction while operating a programming subject through PBL in the COVID-19 environment.

COVID-19's Effect on a Hotel Construction: A Case Study

  • Kayastha, Rujan;Kisi, Krishna P.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.649-657
    • /
    • 2022
  • The COVID-19 pandemic has unprecedented impacts on different sectors around the globe. The effects observed in developing countries are even more severe. Some projects stopped while many have cost and time overrun issues. This paper conducted a case study on the COVID-19's effects on a hotel construction project in Nepal. The study reviewed the literature on COVID-19 and its impact on construction sectors and conducted a semi-structured interview with the project's personnel. The interview response was analysed and the contributing factors that impacted the project and its performance were identified. The paper found financial, operational, contractual, safety, and risk management issues in the hotel project. Overall, the project cost increased by 32% where the material cost increased by 35% and labor cost increased by 28%. This research discusses causes, measures, and provides a broad perspective of the problems, significant challenges, and opportunities associated with the effects of COVID-19 on the construction industry. The Owner as well as the Contractors incurred added costs because of COVID-19. The paper identified contributing factors and presented the challenges which could be used as opportunities to minimize unforeseen impacts of the pandemics in near future. The lesson learned from this case study was that the labor cost and materials cost could have been minimized if the Owner and the Contractor had established alternative resources such as using locally available labor, materials, and alternative suppliers.

  • PDF

Promoting Uncertain Exploration : A Case Study (불확실한 탐험을 촉진하는 방법 : 사례연구)

  • Ha, Seongwook
    • Knowledge Management Research
    • /
    • v.10 no.1
    • /
    • pp.53-70
    • /
    • 2009
  • This study empirically explored what promotes exploration, through a case analysis of a Korean SME (small and medium sized enterprise), based on the research framework which focuses on the identification and the selection of exploratory NPD (new product development) alternatives, and the accumulation of novel capabilities in new technology domains. The learning process of the exploratory NPD project described is as follows. The identification barrier of exploratory NPD project is relatively low. Constructive crisis is germane to selecting exploratory NPD alternatives and to enduring the long payback period. New separated R&D unit is likely to implement the exploratory NPD project. The length of the gestation period of the exploratory NPD project is related with the level of the conflict between old members and new members. This study identified several antecedents of the exploratory NPD project. Prior success promotes the identification process of the exploratory NPD projects. Constructive crisis is related with CEO's personal characteristics such as future oriented and proactive personality. The proactive involvement and persuasion of CEO are germane to reducing the conflict between old and new members and to the success of the exploratory NPD project. Based on the results, this study discusses several implications and future research directions.

  • PDF

Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

  • Yun, Seok Heon;Kim, Sang Chul
    • Architectural research
    • /
    • v.14 no.3
    • /
    • pp.109-116
    • /
    • 2012
  • In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS's cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.

A Case Study on Efficiency Evaluation of DMUs Performances for Digital Pioneer Project by Data Envelopment Analysis Model (DEA를 활용한 차세대첨단콘텐츠육성사업 참여 DMU의 효율성 평가에 관한 사례 연구)

  • Shin, Jae-Shig;Yang, Hae-Sool
    • Journal of Information Technology Services
    • /
    • v.6 no.1
    • /
    • pp.65-81
    • /
    • 2007
  • Recently, the affiliates of the Ministry of Information and Communication have been conducting a performance evaluation study on IT policy projects, based on the performance evaluation model of the U.S. Office of Management and Budgets, with regard to investment in computerization. The performance evaluation model for the policy project could provide the objective information required for the planning, development, and operation of the policy project. However, the performance of the most policy project is likely to be evaluated using the subjective evaluation criteria of evaluators. Therefore, this case study evaluates the relative efficiency using DEA (Data Envelopment Analysis) in order to improve the performance evaluation method of the digital pioneer' project implemented by the Korea IT Industry Promotion Agency. The improvement value of inefficient Decision Making Units (DMUs) was measured by a static efficiency analysis. The measured value will suggest a objective viewpoint of the performance between DMUs to evaluators. In doing so, it will show an appropriate direction for the policy project to be evaluated successfully.

Successive Case of Global Shopping Mall Project for Small and Medium Enterprises: Zungle Incorporation (중소기업을 위한 글로벌 쇼핑몰 지원사업의 성공사례: 주식회사 정글)

  • Choi, Seok-Beom
    • Korea Trade Review
    • /
    • v.44 no.1
    • /
    • pp.221-235
    • /
    • 2019
  • SMEs are experiencing difficulties in doing sales promotion due to the low awareness of the image of the company and the products produced by them in the global market. Therefore, the Government should seek ways to raise awareness of SMEs' image and products. SMEs have to carry out global innovation activities needed to develop new products or new technologies, but they are exposed to limitations of these innovative activities due to the limit of their available resources. Therefore, as a national project, the Ministry of SMEs and Startups and the Small and Medium Business Corporation are doing project for fostering and constructing global shopping mall (independent mall) so that SMEs can strengthen their global innovation activities. The purpose of this paper is to contribute to succeeding in the project for fostering and constructing global shopping mall (independent mall) by studying the case of Zungle Incorporation which operates a global shopping mall and greatly increases exports by participating in this project, and identifying success factors of Zungle Incorporation in doing this project.

Revised PPC Measurement Method considering Interfering Float Weight of Task

  • Jung-Sook Yun;Hyung-il Kim;Jung-Ho Yu;Chang-Duk Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1479-1484
    • /
    • 2009
  • It is commonly recognized to need performance management for successful construction project. PPC measurement of Last Planner System is one of construction project measurement method. PPC measurement is quantitatively assessment to go through construction, and that is not completely to be trusted when compare a project with another or an individual case work with another in same project. According to, purpose of this study is comparison indicator establishment that compare project with another or an individual case work with another it is not use PPC measurement for quantitatively assessment to go through construction. The procedure of this study is derive of the point at issue of existing PPC measurement for a aim PPC measurement in this study expenditure and select weight about that and it is applied to actually construction.

  • PDF

A CASE STUDY OF CONSTRUCTION ENGINEERING FOR CABLE SUPPORTED BRIDGE BY COLLABORATIVE SYSTEM

  • Jung-Min Nam;Sung-Ho Kim;Jae-Hong Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.586-590
    • /
    • 2011
  • This paper presents the case study of the CE by collaborative system and proposes a model of the CM group for the cable supported bridge. The cable supported bridges have a large project scale and need a high level of construction method. Therefore an advanced construction management system is required for successful completion of project. The construction management (CM) group which control design management, construction plan, subcontract, technical support and R&D is organized for the cable supported bridge project. The CM group established a collaborative system with construction site and drew an effective management of cost, process, quality, safety for each project. Furthermore, the CM group established the procedure of construction management based on the construction engineering (CE) items and performed the project management on the construction phase. Efficiency of cost reduction and site control is maximized by using a collaborative system.

  • PDF

Case Studies on Preparing a Business Plan for the Foundation of Food Service Business and Analysis of Investing Economy. (외식사업 신규창업을 위한 사업계획서 작성방법 사례와 투자경제성 분석에 관한 연구)

  • 홍기운
    • Culinary science and hospitality research
    • /
    • v.3
    • /
    • pp.385-421
    • /
    • 1997
  • This study was performed as placing stress on business plan preparation and investing economy analysis centered to cases upon presenting the premises of study for new foundation of food service business. The summarized results are as follows: 1. In the aspect of carrying out process of practical project, establishing the promotion strategy, the facility project program, the menu program, the facility and furniture program, organization & manning schedule, the business operation schedule, review of all laws & provisions and the allout promotion schedule in order were deployed. 2. Analysis of investing economy for review of profitability 1) In case of investment, excluding 600million for the real setate lease among the total investment of 1billion, it was required by 161, 235, 000 for interior project, 161, 110, 000 for facility & equipment, 19, 235, 000 for fittings, 27, 600, 000 for menu plate & uniform, 27, 600, 000 for furniture, 13, 800, 000 for sign article. 2) In case of loss & profit presumed the annual turnover is to be 1, 115, 856, 000 the contigent profit(before tax) is to be 148, 966, 000 which is 13.3% in comparson to the sales amount and the net profit(after tax) for this term s to be 104, 276, 000 which is 9.3% against the sales and the profitable ratio to the equity investment( 500 million) is 20.9% and it satisfies 20% of the premises of study. 3) In case of the payback period will be approximately two(2) years which indicated within three(3) years that is standard of new project evaluation term of ordinary enterprise. 4) In case of internal rate of return it will be 21.5% which is favorable profitability as taking into account of 15% that is standard of new project evaluation by ordinary enterprise based on general downtown money interest. That the investing value of Happy Day profitability is hinted as it is sufficient enough as the case under this study based upon such results and considered that securing supremacy is competitive power in case of commitment will be possible.

  • PDF

A Case Study on the Housing Development by Using the Space of Retarding Basin - Focused on the Tetsugakudo Kouen Collective Housing Development Project - (유수지 공간을 활용한 주거지개발 사례연구 -일본 철학당 공원(테츠가쿠도 코우엔) 주거단지 사례를 중심으로-)

  • Baek, Seung-Kwan;Kim, Young-Hoon
    • KIEAE Journal
    • /
    • v.15 no.1
    • /
    • pp.129-137
    • /
    • 2015
  • The purpose of this study is to analyze the Tetsugakudo Kouen Collective Housing Development Project in Japan. Project implemented cooperatively by the Tokyo Metropolitan Government in charge of river management, Shinjuku and Nakano-ku responsible for park management, and the UR, a housing project developer. This project set a significant precedent for three-dimensional river use by realizing the three-dimensional integrated development of a flood control reservoir, a park, and collective housing. The major effectiveness of this project can be summarized into four points. 1) The costs borne by individual project developers were significantly reduced by realizing a high degree of application and multipurpose use of the land through a joint project. 2) This project, which was designed to accommodate rainfall of 30 to 40mm per hour, is expected to contribute to reducing flood damage and generating significant investment effects, in terms of asset value in downstream areas, thereby increasing flood control security. 3) Local disaster prevention function were enhanced by providing an evacuation site in the case of an earthquake. 4) The living environment was improved by adding the function of a park.