• Title/Summary/Keyword: cable fatigue

Search Result 49, Processing Time 0.141 seconds

A Study on the Characteristic of Anti-corrosive Performance for the Cable Members (케이블 부재의 방청성능 특성에 관한 연구)

  • Ahn, Seung-Whan;Han, Sang-Eul;Lee, Sang-Ju
    • Proceeding of KASS Symposium
    • /
    • 2006.05a
    • /
    • pp.66-72
    • /
    • 2006
  • Recently nonlinear materials are used in construction of building and bridge then various structure formats are achieved positively. one of them, cable members, are the interesting study object which increase rigidity of a total structure by inducing tension. The way of construction using cable members is increasing, so the technology of design and construction are developing. Protection Fretting Fatigue is very important to maintain efficiency of cable member permanently. However, recognition of this is somewhat humble and this paper considers anti-corrosive performance of cable.

  • PDF

Clamp Type-dependent HCF Life Estimation of the Overhead Cable for Distribution Grids (고정 방식 차이에 따른 배전 가공전선의 고주기피로 수명 특성 비교 평가)

  • Lee, Dooyoung;Jung, Jinseung;Kim, Youngdae;Bang, Jiye
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.7 no.2
    • /
    • pp.241-248
    • /
    • 2021
  • High cycle fatigue life for the cables with two different types of clamps is estimated comparatively through acceleration testing. The high cycle fatigue fracture of overhead lines is caused mainly by the aeolian vibration which is induced by vortex shedding. It is necessary to manage the integrity of cables continuedly considering that the aeolian vibration is unavoidable since it occurs in steady and relatively low wind velocity. Two types of clamps which are largely used for overhead lines of the distribution grids are selected and failure data are obtained by step stress testing with a electrodynamic shaker with them. The inverse power law is assumed to describe the stress-life relationship and the fatigue limit at any specified life is supposed to follow Weibull distribution. The life of the cable is defined as the number of cycles to the time that one of strands is completely broken. Finally, the fatigue limits of the cables with two clamp types are estimated at the reference life of 500 Mcycles and compared each other based on a bending vibration amplitude.

Structural behavior of cable-stayed bridges after cable failure

  • Kim, Seungjun;Kang, Young Jong
    • Structural Engineering and Mechanics
    • /
    • v.59 no.6
    • /
    • pp.1095-1120
    • /
    • 2016
  • This paper investigates the change of structural characteristics of steel cable-stayed bridges after cable failure. Cables, considered as the intermediate supports of cable-stayed bridges, can break or fail for several reasons, such as fire, direct vehicle clash accident, extreme weather conditions, and fatigue of cable or anchorage. Also, the replacement of cables can cause temporary disconnection. Because of the structural characteristics with various geometric nonlinearities of cable-stayed bridges, cable failure may cause significant change to the structural state and ultimate behavior. Until now, the characteristics of structural behavior after cable failure have rarely been studied. In this study, rational cable failure analysis is suggested to trace the new equilibrium with structural configuration after the cable failure. Also, the sequence of ultimate analysis for the structure that suffers cable failure is suggested, to study the change of ultimate behavior and load carrying capacity under specific live load conditions. Using these analysis methods, the statical behavior after individual cable failure is studied based on the change of structural configuration, and distribution of internal forces. Also, the change of the ultimate behavior and load carrying capacity under specific live load conditions is investigated, using the proposed analysis method. According to the study, significant change of the statical behavior and ultimate capacity occurs although just one cable fails.

Structural Analysis of a Cable Anchor System for a Cable-Stayed Bridge over the Sea (해상 사장교의 Pipe형 케이블 정착구에 관한 구조해석)

  • KONG BYUNG-SEUNC;HONG NAMSEEG
    • Journal of Ocean Engineering and Technology
    • /
    • v.19 no.5 s.66
    • /
    • pp.34-42
    • /
    • 2005
  • The cable connection zone of the cable-stayed bridge transfers deal-load, live-load, and second-load to the cables on the structural joint zone of the cables and the main girders are the most critical parts in which big cable tensile forces are generated by those loads. Therefore, it is necessary to thoroughly check the main girder, structurally to secure the required stability. Because of the heavy tensile force of cables linked in the connection zone of the cable-stayed bridge, locally concentrated stress, as well as the dispersion of stress, occurs in the structurally contacted point of cable and main girder thus, we need to make a thorough investigation through a detailed structural analysis. Directly delivering the tensile force to the connection zone of the cable, the consequently big effect in the tensile force fluctuation caused by the live-load will make it necessary to review the fatigue strength. As the connection zone of the cable is designed to resist the tensile force of the cable, which is applied to a connecting section as a concentrated force, thick plates are used. These plates are frequently made of welded structure, thus, the investigation of the welding workability is inevitable.

Finite element model updating of long-span cable-stayed bridge by Kriging surrogate model

  • Zhang, Jing;Au, Francis T.K.;Yang, Dong
    • Structural Engineering and Mechanics
    • /
    • v.74 no.2
    • /
    • pp.157-173
    • /
    • 2020
  • In the finite element modelling of long-span cable-stayed bridges, there are a lot of uncertainties brought about by the complex structural configuration, material behaviour, boundary conditions, structural connections, etc. In order to reduce the discrepancies between the theoretical finite element model and the actual static and dynamic behaviour, updating is indispensable after establishment of the finite element model to provide a reliable baseline version for further analysis. Traditional sensitivity-based updating methods cannot support updating based on static and dynamic measurement data at the same time. The finite element model is required in every optimization iteration which limits the efficiency greatly. A convenient but accurate Kriging surrogate model for updating of the finite element model of cable-stayed bridge is proposed. First, a simple cable-stayed bridge is used to verify the method and the updating results of Kriging model are compared with those using the response surface model. Results show that Kriging model has higher accuracy than the response surface model. Then the method is utilized to update the model of a long-span cable-stayed bridge in Hong Kong. The natural frequencies are extracted using various methods from the ambient data collected by the Wind and Structural Health Monitoring System installed on the bridge. The maximum deflection records at two specific locations in the load test form the updating objective function. Finally, the fatigue lives of the structure at two cross sections are calculated with the finite element models before and after updating considering the mean stress effect. Results are compared with those calculated from the strain gauge data for verification.

Fatigue Performance of Precast FRP-Concrete Composite Deck with Long Span (장지간 프리캐스트 FRP-콘크리트 합성 바닥판의 피로 성능)

  • Cho, Keun-Hee;Park, Sung-Yong;Kim, Sung-Tae;Kim, Byung-Suk
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2010.05a
    • /
    • pp.45-46
    • /
    • 2010
  • Fatigue performance of a precast FRP-concrete composite deck with long span economically applicable to a cable-stayed bridge was evaluated. From the experiment, it is verified that the precast FRP-concrete composite deck has sufficient fatigue performance.

  • PDF

Dynamic response of cable-stayed bridges subjected to sudden failure of stays - the 2D problem

  • Raftoyiannis, I.G.;Konstantakopoulos, T.G.;Michaltsos, G.T.
    • Coupled systems mechanics
    • /
    • v.3 no.4
    • /
    • pp.345-365
    • /
    • 2014
  • A significant problem met in engineering practice when designing cable-stayed bridges is the failure of cables. Many different factors can lead to sudden failure of cables, such as corrosion, continuous friction or abrasion, progressive and extended crevice created by fatigue and finally an explosion caused by sabotage or accident, are some of the causes that can lead to the sudden failure of one or more cables. This paper deals with the sudden failure of cables in a special form of cable-stayed bridges with a single line of cables anchored at the central axis of the deck's cross-section. The analysis is carried out by the modal superposition technique where an analytical method developed by the authors in a previous work has been employed.

Development of Cable for Towed Array Sonar System (예인 음탐기용 케이블 개발)

  • Yang, Seung-Yun;Kim, Jung-Suk;Kim, Chul-Min;Lee, Jin-Hee
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.19 no.5
    • /
    • pp.559-566
    • /
    • 2016
  • Cables for Towed Array Sonar System(TASS) were developed. In order to verify the performance of cables, environmental and operational conditions as well as functional requirements were investigated during design stage. Double armored high and low voltage integrated cable for towed body and two kinds of cables, armored and light weight power and optic hybrid cables for towed array sensor system were developed by modeling and simulation. Customized manufacturing process and test method, such as foam extrusion and dynamic fatigue test were applied to this development. In conclusion, underwater towed hybrid cable with high tensile strength and compact structure were developed.

Optimum design of cable-stayed bridges

  • Long, Wenyi;Troitsky, Michael S.;Zielinski, Zenon A.
    • Structural Engineering and Mechanics
    • /
    • v.7 no.3
    • /
    • pp.241-257
    • /
    • 1999
  • This paper presents a procedure to minimize the cost of materials of cable-stayed bridges with composite box girder and concrete tower. Two sets of iterations are included in the proposed procedure. The first set of iteration performs the structural analysis for a cable-stayed bridge. The second set of iteration performs the optimization process. The design is formulated as a general mathematical problem with the cost of the bridge as the objective function and bending forces, shear forces, fatigue stresses, buckling and deflection as constraints. The constraints are developed based on the Canadian National Standard CAN/CSA-S6-88. The finite element method is employed to perform the complicated nonlinear structural analysis of the cable-stayed bridges. The internal penalty function method is used in the optimization process. The limit states design method is used to determine the load capacity of the bridge. A computer program written in FORTRAN 77 is developed and its validity is verified by several practical-sized designs.

Reliability Assesment Test on the Regular Maintenance of HTS Cable System (초전도케이블시스템 유지.보수에 따른 신뢰성 평가 시험)

  • Sohn, Song-Ho;Yang, Hyung-Suk;Lim, Ji-Hyun;Choi, Ha-Ok;Kim, Dong-Lak;Ryoo, Hee-Suk;Hwang, Si-Dole
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2009.06a
    • /
    • pp.361-361
    • /
    • 2009
  • KEPCO High Temperature Superconducting (HTS) cable system rated with $3\Phi$, 22.9kV, 1250A was laid in 2006, and the long term test is in progress. The HTS cable system with the cooling system has been operated below cryogenic temperature. That environment exposes the system to the thermo-mechanical stress due to the significant temperature difference, and the cooling system has moving parts for the forced circulation of the coolant. Therefore the HTS cable system experiences thermal fatigue and moving part such as liquid nitrogen pump need a regular replacement every 5000 hours Building the assessment criterion, the maintenance procedure was established and regular preventive maintenance was done; improvement of the termination structure and the replacement of the bearing of liquid nitrogen pump. Following the proper process, the reliability assessment test including He leakage detection and the stability of flow rate was performed. This paper describes the process and result of the first regular maintenance of KEPCO HTS cable system

  • PDF